2545.1DESCRIPTION
This Work consists of constructing Lighting Systems and electrical systems.
A Qualifications of Workers Provide workers in accordance with 1802, “Qualification of Workers,” and the following: On the Project Site ensure at least one person employed by the electrical Contractor and their Subcontractor performing or directly supervising the Work is Department Signal and Lighting Certified. Department Signal and Lighting Certified persons do not relieve the Contractor’s responsibility to provide qualified workers performing electrical Work in accordance with Minnesota Statutes, section 326B.33 “Licenses.” For information on Department Signal and Lighting Certification classes and valid certifications contact Office of Traffic Engineering, (OTE) Signals, and Lighting Unit. B Definitions Refer to 1102, “Abbreviations and Measurement Units,” 1103, “Definitions,” 2565.1C, “Acronyms,” NFPA 70 National Electrical Code – Article 100 and this section for the abbreviations, acronyms, measurement units, and definitions of words and phrases.
2545.2MATERIALS
Provide Materials as specified in the Contract and in accordance with 2565.2, “Traffic Control, Materials” to complete the Work. B Hardware Provide commercial brass or bronze cap screws, set screws, and tap bolts. Provide galvanized steel or commercial brass washers. K Lighting Units K.3 Light Pole wiring .............................................................................................. 2545.3F.2 K.4 Splicing in Light Pole bases.............................................................................. 2545.3G.1
K.5 Miscellaneous Materials Miscellaneous Materials required for installation of lighting units .
2545.3CONSTRUCTION REQUIREMENTS
A General Perform the Work in accordance with 2565.3, “Traffic Control Signals, Construction Requirements” and the following: The Plan shows approximate locations of foundations, Lighting Units, SOP, service Equipment, service cabinets, handholes, and conduit crossings. The Engineer will establish the exact locations. Do not perform Work until underground facilities have been located in accordance with 1507, “Utility Property and Service.” Keep Roads open to traffic during construction in accordance with 1404, “Maintenance of Traffic.” Protect excavation and uncompleted Work that may cause a hazard to vehicle and pedestrian traffic. B Submittals Prepare documents and submit to the Engineer for review in accordance with 1502, “Plans and Working Drawings,” and the following. B.1 Approved/Qualified Products Materials List Before performing the work, submit for Department review a Signals and Lighting product Materials list of the Materials selected from the APL to be used on the Project for Signals and Lighting. Ensure the products selected meet the requirements of this section. In the Signals and Lighting product Materials list submitted to the Engineer, provide the following information:
Signals and Lighting,” centered at the top of the document
number
List, provide a separate line that includes the following:
This submittal and the Engineer’s review of the submitted list do not relieve the responsibility for providing Materials that comply with the Approved/Qualified Products Materials List. B.1.a Cut Sheets, Catalog Sheets, or Specification Sheets Provide cut sheets, catalog sheets, or specification sheets for the Approved/Qualified Products Materials List to the Engineer upon request if further review of the APL materials and products is needed. B.2 Shop Drawing Submittals Before performing the Work, prepare shop drawing submittals for Materials not listed on the APL. Review shop drawings for accuracy and completeness before submittal. B.3 Electrical Systems Maintenance Contact List At the Project’s pre-construction meeting, submit a list with the names and phone numbers of contact personnel for both day and night operation and maintenance of the new , existing, and temporary Lighting Systems and electrical systems as specified in. 2545.1 “Lighting Systems, Description” and Traffic Control Signal Systems and electrical systems as specified in 2565.1 “Traffic Control Signals,Description.” B.4 Locating Responsibility Form At the Project’s pre-construction meeting, submit a completed Locating Responsibility Form for providing locating the new and existing Lighting Systems and electrical systems on the Project. The Locating Responsibility From is found at the following web address: https://edocs- public.dot.state.mn.us/edocs_public/DMResultSet/download?docId=27303373 C Maintenance and Operation of Electrical Systems This Work consists of maintaining, operating, and locating within the scope of the Project, new , existing, and temporary Lighting Systems and electrical systems as specified in 2545.1 “Lighting Systems, Description” and Traffic Control Signal Systems and electrical systems as specified in 2565.1 “Traffic Control Signals,Description. Before an authorized Work suspension begins, ensure existing, temporary, and new electrical systems are in full working order in accordance with the Contract. Maintenance and operations of electrical systems will not be suspended until the following requi rements have been met:
(existing, temporary, and new)
transfer of locating responsibilities to the Department’s locating group during an authorized Work susupension Due to the nature of electrical systems, Partial Acceptance will not be granted because of an authorized Work suspension unless the new electrical system Work has been completed and inspected in accordance with the Contract and the new system is fully oper ational.
When resuming Work after authorized Work suspension, remove temporary construction or Materials that the Department installed to maintain the electrical system during the suspension. Locating responsibilities will be transferred back to the Contractor after authorized Work suspension. A request for MnDOT locating group to provide locates of underground facilities after authorized Work suspension may be granted if the Department made underground system facility changes to the electrical system during the suspension. This Work for maintaining, operating, and locating new and existing electrical systems, and temporary electrical systems is included in the Unit Prices of the Pay Items that are part of the electrical system Work. C.1 Maintain and Keep in Operation New and Existing Electrical Systems Provide an Electrical System Maintenance Contact List in accordance with 2545.3B “Lighting Systems,Submittals” for both day and night operation for maintenance of new and existing electrical systems during the Project. Maintain and keep in operation the new and existing electrical systems by repairing or replacing Materials when damaged or not in working order. Repairing or replacing damaged or not in working order Materials includes:
Notify the Engineer of damage to new or existing electrical systems Materials upon discovery, and within 24 hours repair or replace, or within 24 hours present a plan to the Engineer for approval to repair or replace damaged Materials. If presenting a plan to repair or replace damaged Materials to the Engineer for approval, the Engineer will determine the timeline for this Work to be completed based on traffic safety. Repair or replace materials damaged by Contractor operations at no additional cost to the Department, in accordance with 1716, “Contractor’s Responsibility for Work,” and 2545.3F “Lighting Systems,Wiring.” If the Engineer determines that others, not the Contractor, have damaged the electrical system, replace and repair damaged Materials as directed by the Engineer. The Department will pay for the Work to replace or repair Materials not damaged by the Contrac tor as Extra Work in accordance with 1402, “Contract Revisions.” If failure to comply with these requirements, the Department may have others repair or replace damaged materials and deduct the costs for this Work from moneys due to the Contractor under the specified construction Project Contractor or any other construction Project Contract with the Department. C.2 Maintain and Keep in Operation Temporary Electrical Systems Install Department provided materials and additional materials and equipment needed for complete and operating temporary Lighting systems, Traffic Control Signal systems, and electrical systems.
Maintain and keep in operation the Lighting systems, Traffic Control Signal systems, and electrical systems in good working order throughout the duration of the Project. This includes knockdowns (poles and service cabinets), pole and pole base damage, luminaire outages, cable, and conductor damages (buried and above ground), foundation damage, and service cabinet component failures. Pay electric utility costs, including extension of power lines by the electric utility. C.3 Locating Underground Facilities Locate underground facilities for temporary, existing, and newly constructed Lighting systems, Traffic Control Signal systems, and electrical systems within the Project limits, for the duration of the construction Project in accordance with the applicable provisions of 1514, “Maintenance During Construction,” Minnesota Statutes, Chapter 216D and the following. Responsibility for locating underground systems facilities is transferred from the Department to the Contractor on the Project start date as shown on the Proposal. Request at the start of the Project for MnDOT’s locating group to provide an initial locate of the underground system facilities within the Project. Submit initial locate requests to MnDOT’s Locating Office a minimum of four Business Days before the Projec t start date. Locate requests that are within the construction Project will continue to be received by MnDOT’s Locating Office. These locate tickets will be forwarded to the Contractor’s representative listed on the Locating Responsibility Form responsible for coordinating locate requests within the Project. The locate tickets will be forwarded via email or fax. Confirm receipt of the locate ticket by notifying MnDOT’s locating office and the Engineer within two hours of MnDOT sending the locate request. Repair the system’s facilities damaged as the result of improperly located or unmarked underground facilities within the Project. Submit to the Engineer a completed Locating Responsibility Form in accordance with 2545.3B, “Lighting Systems,Submittals,” with 24 hours a day, 7 days a week contact information including the names and telephone numbers. Notify MnDOT’s Locating Office to provide contact information and establish assumed responsibility for locating MnDOT’s underground system’s facilities within the Project. Send a copy of the completed Locating Responsibility Form to: Electrical Services Dispatch Phone: (651)366-5750 E mail: ElectricalServicesDispatch.dot@state.mn.us 6000 Minnehaha Ave. St. Paul, MN 55111-4014
Continue to locate underground system’s facilities within the Project until the electrical system’s completed As-built Mark-up Plan and As-built Survey Data deliverables as specified in DivisionS Special Provisions “As Built” have been submitted and the Engineer issues Project acceptance in writing in accordance with 1516.2, “Project Acceptance” and 1716, “Contractor’s Responsibility for Work.” D Handhole Installation Install handholes and pulling vaults within a direct buried lighting cable run if shown on the Plans and as directed by the Engineer. Install a PVC conduit stubout with the following characteristics for each cable entering and exiting the handhole or pulling vault:
cable
Install the approved power cable splice encapsulation kit for direct buried lighting cable and individual conductors for splices in handholes and pulling vaults in accordance with 2545.3G “Splices.” When pulling vaults are required, provide an Aggregate drain bed 12 inches to 18 inches larger than the base of the pulling vault. Center the pulling vault on the drain bed. E Foundations and Equipment Pads Construct foundations and Equipment pads as shown on the Plans, in accordance with 2565.3F “Foundations and Equipment Pads” and the following: Orient light foundation anchor rods so that mast arms or davits of Light Poles are perpendicular to the centerline of the Roadway unless specified elsewhere in the Contract. Install Roadside light foundations located in the clear zone in accordance with AASHTO LRFD Standard Specifications for Structural Supports for Highway Signs, Luminaires, and Traffic Signals and as follows: Ensure foundations using breakaway poles placed on Roadside slopes do not allow impacting vehicles to snag on either the foundation, anchor rods, conduits or other Equipment. Shape the terrain around the foundations to ensure anchor rods do not project more than a maximum of 4 inches above a horizontal line between the straddling wheels of a vehicle on 60 -inch centers. The horizontal line from wheel to wheel connects any point on the ground surface on one side of the light standard foundation, including anchor rods, to a point on the ground surface on the other side of the light standard foundation, including anchor rods. The horizontal line is aligned radially or perpendicular to the centerline of the Roadway.
F Wiring Install or remove wiring, cables, conductors, and conduits as shown on the Plans and the following. Install equipment grounding conductors (EGCs) regardless if shown or noted on the Plans or not. Do not splice direct buried lighting cable and bury underground. Do not splice damaged conductors and place back in conduit. Notify the Engineer of damage to new or existing electrical systems cables and conductors upon discovery, and within 24 hours repair or replace, or within 24 hours present a plan to the Engineer for approval to repair or replace damaged wiring. If presenting a plan to repair or replace damaged wiring to the Engineer for approval, the Engineer will determine the timeline for this Work to be completed based on traffic safety. Replace the entire run of new or existing direct buried lighting cable if damage, due to Contractor operations or by others, occurs to the cables that will become part of the permanent electrical system. A run is defined as a segment of direct buried lighting cable from Lighting Unit to Lighting Unit or Lighting Unit to Lighting Service Cabinet.
Replace the entire length of new or existing cables if damage, due to Contractor operations or by others, occurs to the cables that will become part of the permanent electrical system. Entire length is defined as a segment of cable from one termination point to the other termination point without splices as shown on the Plans and as specified elsewhere in the Contract. Replace the individual conductors in the conduit and the conduit if damage, caused by Contractor operations or by others, occurs to individual conductors in conduit and to the conduit, or only to the conduit. Repair and replace wiring and conduit damaged by Contractor operations at no additional cost to the Department, in accordance with 1716, “Contractor’s Responsibility for Work,” and relevant to the Contract. If the Engineer determines that others, not the Contractor, have damaged the electrical system’s cables or conductors, the Department will pay for the Work to replace or repair wiring not damaged by the Contractor as Extra Work in accordance with 1402, “Contract Revisions.” If failure to comply with these requirements, the Department may have others repair or replace damaged materials and deduct the costs for this Work from moneys due to the Contractor under the specified construction Project Contractor or any other construction Project Contract with the Department. F.1 Underground Wiring Install direct buried lighting cable and underground conduit with single conductors at the same distance behind the bituminous Shoulder or back of curb as the light foundations. When an obstruction has been encountered in the path of the direct buried lighting cable or underground conduit, re-route the direct buried lighting cable and underground conduit around the obstruction away from the Roadway. Mark the location of the newly installed direct buried lighting cable and underground conduits with red flags and red paint immediately after installation. Throughout the course of the Project protect and preserve the locate flags and paint on the newly installed underground lighting facilities. In the event the locate marks have been obliterated or are obscured or missing refresh and remark the area. F.1.a Direct Buried Lighting Cable Trench or plow to install direct buried lighting cable to a depth of at least 2 feet and in accordance with 2565.3I.1 “Underground Wiring.” Feed the cable through the plow blade chute and ensure the plow blade does not pull the cable. Obtain the Engineer’s approval for the plowing method before installing the cable. If encountering solid rock or other obstructions, install the cable in a 3 inch conduit buried at least 6 inches deep with a 2 inches thick concrete slab above conduit. Install an additional 2 feet of slack direct buried lighting cable near the light foundation in an “S” shape before the cable enters the foundation conduit. Extend direct buried lighting cable 2 feet above the top of the light foundations. Leave 4 inches to 6 inches of the outer cable jacket extending above the conduit. Install direct buried lighting cable from the reel or spool immediately into the ground. Do not lay direct buried lighting cable for the new Lighting System on the ground to use as temporary wiring.
Do not use permanent direct buried lighting cable as temporary wiring. F.1.b Direct Buried Lighting Cable Installed in Conduit If bituminous, concrete, granular material, or other material not considered topsoil will be placed over the direct buried lighting cable run on the Project, then install the cable in rigid PVC or HDPE conduit even if not shown on the Plans and as follows: Where bituminous, concrete, granular material, or other material not considered topsoil will cross over a segment of direct buried lighting cable, install the cable in three-inch conduit and extend the ends of the conduit two feet beyond the edges of the covering material. Place Department provided ball locators at each end of the conduit before backfilling. When bituminous, concrete, granular material, or other material not considered topsoil will cover over half of the entire length of direct buried lighting cable run from cabinet to pole or pole to pole, install the cable in a two -inch conduit for the entire length of the cable run. From cabinet to pole, install a two-inch rigid PVC 90 degree sweep elbow and conduit in the equipment pad to connect the two -inch conduit raceway from the cabinet equipment pad to the pole foundation’s required rigid PVC two-inch coupling and sweep elbow. From pole to pole, connect each end of the two - inch conduit raceway to the required rigid PVC two-inch coupling and sweep elbow in the pole foundations. Individual single 4 AWG conductors in accordance with 3815.2B, “Individual Conductors” may be installed in the conduit raceway instead of direct buried lighting cable upon approval of the District Traffic Office and the Engineer. F.1.c Remove Direct Buried Lighting Cable Remove the in-place out-of-service (abandoned) cables shown on the Plans and as directed by the Engineer once the new system constructed under the Contract has been completed. In-place out-of-service cables not shown on the Plans, are required to be removed and the Department will pay for the removal as Extra Work in accordance with 1402, “Contract Revisions.” Do not remove direct buried lighting cable located within 2 feet of the Roadbed and under the Roadway. Where in-place, out-of-service (abandoned) cables conduits more than 2 feet away from the Roadbed and under the Roadway are allowed to remain in-place, provide the following at no cost to the Department:
in accordance with 2545.3G.2, “Direct Buried Underground Cable Splices”
underground cable splice before backfilling
underground cable splice and submit to the Engineer
Installation” and 2565.3E, “Handholes” at both ends of each cable run
allow for future locating
wet locations and labeled “ABANDONED LIGHTING CABLE”
intervals and provide to the Engineer
each cable run to the Engineer
locating flags with a capital “A” inside a circle to represent abandoned facilities before final acceptance of the Project Noncompliance of these provisions will result in suspending the Work in accordance with 1501.2 “Suspending Work,” and be subject to 2545.5A, “Monetary Adjustment.” The requirements listed are necessary for the Department to maintain its abandoned facilities in accordance with Minnesota Statutes, section 216D.04 Subd 3, “Locating underground facility; operator” and Minnesota Rules Part 7560.0125, “Abandoned and Out-Of-Service Facilities.” The Engineer will distribute copies of the As-builts and GPS coordinates to the Project file, District Traffic Office, and Department’s Locating Office. F.1.d Single Conductors Installed in Underground and Barrier Conduits Pull single conductors directly from reels or spools. Do not pull off and lay conductors on the ground before installation. Install conductors in conduit with sufficient slack to allow for contraction. Extend the conductors above the top of the light foundations 18 inches to 2 feet. F.2 Above Ground Wiring Electrically bond the Equipment grounding conductor (EGC) to metal poles and Equipment. F.2.a Light Pole Wiring For each luminaire, provide a continuous length without splice of 12-2 (with ground) UF cable within the Light Pole from the required terminations in the Light Pole base to the luminaire. Provide approved luminaire wire holders listed on the APL, Lighting that supports the luminaire cable within the end of the Light Pole tenons near the connection point of the luminaires. Provide fuse holders listed on the APL, Lighting with fuses and position the fuse holders inside the Light Pole bases where it can be easily seen and removed when the access doors are removed. Furnish and install fiber body 6 1/4 Amp, time-delay 5AG midget type fuses in light pole base fuse holders. Connect the UF cable at one end by properly terminating the individual conductors to their designated tunnel lug terminals in the luminaire. At the other end of the UF cable, properly terminate the individual conductors to the correct circuit conductors located in the Light Pole base.
Strip the insulation from the end of the ungrounded black conductor of the UF cable as far back as needed to ensure a safe connection to the “Load” side terminal of the fuse holder. Before terminating apply anti-oxidant joint compound to the end of the conductor. Terminate the conductor to the “Load” side of the fuse holder in accordance with the fuse holder manufacturer’s installation instructions. After terminating, apply 2 layers of vinyl electrical tape over the terminal end and extend the wrap at least 1 inch over the incoming conductor insulation. Terminate the grounded “neutral” conductor of the UF cable to the grounded neutral circuit conductor by splicing in accordance with 2545.3G.1, “Above Ground Splices.” Terminate the bare grounding conductor of the UF cable to the EGC in accordance with 2545.3O “Bonding and Grounding.” Provide a continuous, without splice, short piece of 10 AWG stranded insulated conductor and:
back as needed for splicing and terminating connections
to the ends of the conductors
ungrounded “Hot” branch circuit conductors shown on the Plan to make above ground splices in accordance with 2545.3G.1 “Above Ground Splices”
terminal of the fuse holder in accordance with the manufacturer’s installation instructions
apply 2 layers of vinyl electrical tape over the terminal and extend the wrap at least 1 inch over the incoming conductor insulation F.2.b Temporary Overhead Lighting Cable The Contractor may use quadruplex aluminum conductor, steel reinforced
temporary power distribution through aerial lines. Do not support overhead lighting cable by the luminaires. G Splices Do not splice unless specified in the Contract or approved by the Engineer. If specified in the Contract or approved by the Engineer, only splice in handholes, pulling vaults, junction boxes, and pole bases. G.1 Above Ground Splices Provide splices for conductors and cables as specified in the Contract and the following:
splice
ends of the conductors
for ungrounded and grounding conductor splices
each split bolt connector splice, except grounding splices, to a thickness of at least 1.5 times that of the original insulation
putty tape and extend tape at least 1 inch over the conductor insulation
vinyl electrical tape overlapping the connector ports and 1 inch over the incoming conductor insulation Approved insulated wire splice connector blocks listed on the APL, Lighting. Install wire splice connector blocks in accordance with the manufacturer’s installation requirements. If required for temporary Lighting Systems, provide NRTL listed connectors designed to terminate aluminum and copper conductors in the same splice. Provide NRTL listed terminals for use with aluminum wire for terminals used on aluminum conductors. Tighten the connections to the manufacturer’s recommended torque. G.2 Direct Buried Underground Cable Splices Provide and install a direct buried underground cable splice as shown on the Plan and the following:
splice barrel connector that is rated for the size of conductor being spliced
compression tool
tubing must also cover a minimum of 1/4 inch of the conductor insulation on both sides of the splice. After the tubing is slid into position, heat-shrink to form a tight seal around the splice and the insulation of the conductor on both sides of the splice
tubing, with at least 2 layers of electrical tape to insulate individual conductors before encapsulation
bolting the pieces together using brass nuts, bolts, and flat washers to form an electrical bond between the 2 pieces. The bolt head faces the cables and the shaft of the bolt faces outward
instructions
encapsulation kit, ensuring that when the encapsulating Material is poured in the mold it seals up the conductor splices, cable shield, and the outer jacket of the direct buried lighting cable and forms 1 complete assembly. Ensure that no individual conductor insulation or cable shield is exposed when the splice is complete Provide power cable splice encapsulation kits listed on APL, Lighting. Assemble the power cable splice encapsulation kit in accordance with manufacturer’s installation instructions.
Wrap electrical insulating tape around the end of each epoxy resin mold where it meets the outer jacket of the cable assembly to prevent epoxy from leaking out of the mold before curing. G.3 Two Way Underground Handhole Cable Splices Provide and install a 2-way underground handhole cable splice as shown on the Plan and as follows:
extend at least 3 feet above the top of the handhole before stripping the cable
cable enters the handhole
hole
bolting the pieces together with brass nuts, bolts, and flat washers to form an electrical bond between the 2 pieces of copper shielding
extend at least 3 feet above the top of the handhole before stripping the cable
splice barrel connectors that is rated for the size of cable being spliced
compression tool
Department-approved loop detector splice encapsulation kit Provide loop detector Splice Encapsulation kits listed on the APL, Signals. Assemble the loop detector splice encapsulation kit in accordance with the manufacturer’s installation instructions and as follows: Wrap electrical insulating tape around the end of each epoxy resin mold where it meets the outer jacket of the cable assembly to prevent epoxy from leaking out of the mold before curing. G.4 Three Way Underground Handhole Cable Splice Provide and install a 3-way underground handhole cable splice as shown on the Plan and as follows:
extend at least 3 feet above the top of the hand hole before stripping the cable
cable enters the handhole
handhole
bolting the pieces together with brass nuts, bolts, and flat washers to form an electrical bond between the 3 pieces of copper shielding
pole base terminal block coatings listed on the APL, Signals
handhole
that is rated for the size and number of the conductors being spliced
approved 3-way power cable splice encapsulation kit Provide 3-way power cable splice encapsulation kit listed on the APL, Lighting. Assemble the 3-way power cable splice encapsulation kit in accordance with the manufacturer’s installation instructions. Wrap electrical insulating tape around the end of each epoxy resin mold where it meets the outer jacket of the cable assembly to prevent epoxy from leaking out of the mold before curing. H Pole Installation Unless otherwise specified elsewhere in the Contract, install traffic signal and light poles, and high mast light towers (poles) in accordance with the manufacturer’s pole erection drawings and installation instructions, and AASHTO Standard Specifications for Structural Supports for Highway Signs, Luminaires, and Traffic Signals. Lift and safely move poles without damage. Avoid abrasion during lifting operations. Do not drag poles on the ground. Use natural or synthetic fiber slings and chokers or prevent the pole surface finish from coming in direct contact with metal chains and hardware when lifting poles to protect factory surface finish from mars, blemishes, or scratches. Repair surface finish damage in accordance with the manufacturer’s recommendations. Before standing poles on foundations verify the anchor rod installation as specified in Step 1 “Verify the Installation” of the New Installation Procedures, MnDOT Anchor Rod Tightening Handbook and the following:
fitted connection
identification on the end of the anchor bolt projecting above the concrete
stub height requirements when breakaway is mandated
hand or by one worker using an ordinary wrench without a cheater bar
Replace damaged poles or pole accessories with new. Before replacing, obtain the Engineer’s approval. Do not install poles or accessories from previous electrical systems. Immediately after standing the pole on the foundation complete the entire pole installation process. The pole installation process is from the time the pole is set on the foundation to the completion of final tightening of anchor rod connections in accorda nce with the Contract. Do not stop midway through the installation process. Do not stand poles on foundations without completion of final anchor rod connection tightening. If there are concerns of equipment downtime, then provide at least two crews;
one to stand poles and another crew to complete the required anchor rod tightening procedure in full on the same day of standing the pole. Ensure poles are set plumb on the foundations. Foundations not installed plumb will require re-installation if the pole cannot be set plumb on the foundation. H.1 Anchor Rod Connections Ensure the required anchor rods, nuts, washers, and pole base plate fit solidly together. Assemble threaded portions of anchor rods and nuts, and faying surfaces of nuts and washers to ensure threads and surfaces are free of the following:
Use anchor rods, nuts, and washers in accordance with the Contract. Use the amount of washers and nuts for each connection as specified in the Contract and pole manufacturer’s installation instructions. Do not remove required nuts or washers from the conne ction. Do not add extra washers, spacers, or other hardware to the connection other than what is required. Do not use lock washers. Place nuts, washers, and pole base plate on anchor rods in the installation order as specified in the Contract and manufacturer’s installation instructions. Ensure the top of the anchor rod extends at least one thread beyond the top surface of the top nut. An anchor rod end inside the top nut where no threads extend beyond the top surface of the nut and the top nut is not fully engaged on the anchor rod after tightening is not acceptable. Apply lubrication only to the exposed anchor rod threads above the base plate, top face of the top washers, and any surfaces on the top nuts that make contact with the anchor rod threads and the face of top washers as specified in Step 3 “Lubrication” of the New Installation Procedures, Anchor Rod Tightening Handbook. Do not apply lubricant before Step 3. Only apply an approved Electrolytic Corrosion Inhibitor lubricant listed on the APL, Lighting to the specified areas of anchor rod connections when installing stainless steel light poles. For coated steel and aluminum pole installation apply an approved lubricant Bridge grease/bridge bearing lubricant listed on the APL, Bridge or an approved Electrolytic Corrosion Inhibitor lubricant listed on the APL, Lighting to the specified areas of the anchor rod connections. Use wrenches designed for turning nuts to tighten anchor rod connections. Do not use pipe wrenches to turn nuts. Use wrenches sized specifically for the nut being turned. Do not use adjustable wrenches. Use calibrated torque wrenches to tighten anchor rods to the required torque values. Submit documentation of wrench calibration and certification to the Engineer in accordance with 2565.3A.13 “Calibration Requirements for Measurement Tools and Test Equipment” before installing poles. If the required torque values for tightening anchor rods cannot be achieved using a manual type torque wrench, then use a low profile hydraulic torque wrench listed on the APL, Lighting.
Use a working handheld digital pendant or, digital or analog gauge with the low -profile hydraulic torque wrench to ensure specified torque values have been met and can be verified in foot pounds by the installer and inspector during the tightening process. If the gauge display is in pounds per square inch (PSI), convert PSI to foot pounds and ensure the calculations are correct. Submit the PSI to foot pounds converted values to the Engineer before installing the poles. The submittal and Engineer’s review do not relieve responsibility for tightening anchor rods to the required torque values. The MnDOT Anchor Rod Tightening Handbook “New Installation Procedures” is required to use and follow along during the installation of poles Complete the required Anchor Rod Tightening Forms using one of the following; Screen- fillable PDF form – “fillable” on a computer (Adobe Acrobat Reader required) or blank screen- fillable PDF form downloaded and printed hard copies to fill out by hand (Adobe Acrobat Reader required). For aluminum poles, fill out the ANCHOR ROD TIGHTENING FORM- ALUMINUM POLES (Signal Pedestals and Light Poles). For stainless steel and coated steel poles, fill out the ANCHOR ROD TIGHTENING FORM - STAINLESS STEEL AND COATED STEEL POLES. Complete the required Anchor Rod Tightening Form at a rate of one form per every 15 light poles with a minimum of one completed form per Project and one form for every traffic signal pole per Project. Submit the completed forms to the Engineer.
H.1.a Single-Nut Anchor Rod Connections Aluminum poles requiring single-nut anchor rod connections are set directly on the foundation. Leveling nuts are not used in the connections. One heavy hex nut for each anchor rod is used to fasten the pole base to the foundation anchor rods. Use washers in the connections in accordance with the pole manufacturer’s installation requirements and the Contract. Only use manufacturer specified leveling shims. If the manufacturer does not provide specified shims, then use shims in accordance with Standard Plate No. 8129 . Do not use leveling nuts, 1/2 inch thick hold down washers, standard washers, spacers, or other miscellaneous hardware to level the poles plumb. Use no more than three leveling shims per base corner and no more than six shims total per transformer base. If more shims are needed for a plumb installation, then re-install the foundations level and plumb. Follow the MnDOT Anchor Rod Tightening Handbook “New Installation Procedures” only when instructed to on the MnDOT Anchor Rod Tightening Form titled “MnDOT ANCHOR ROD TIGHTENING FORM-ALUMINUM POLES (Signal Pedestal and Light Poles).” H.1.b Double-Nut Anchor Rod Connections Stainless steel and coated steel poles requiring double-nut connections use two heavy hex nuts for each anchor rod to fasten the base plate to the foundation anchor rods. A bottom nut, also called a leveling nut is positioned under the base plate to level and support the pole and a top nut is located above the base plate.
Two hardened flat washers are required for each connection. Place one washer directly above the leveling nut and the other washer directly under the top nut. Use additional washers or spacers if required by the pole manufacturer. Use the standoff distances provided by the pole manufacturer. If the pole manufacturer does not provide standoff distances then use a standoff distance of less than one anchor rod diameter. Standoff distance is defined as the clear space measured between the top of the foundation and the bottom of the leveling nut. Use the minimum standoff distances when possible. Tighten anchor rods for stainless steel and coated steel poles using double nut connections and tighten anchor rods in accordance with the manufacturer’s installation requirements, the Anchor Rod Tightening Handbook- New Installation Procedures and the Anchor Rod Tightening Form titled “ROD TIGHTENING FORM- STAINLESS STEEL AND COATED STEEL POLES” as specified in 2545.3H.1 “Anchor Rod Connections.” H.1.c Galvanic Corrosion Mitagation for Stainless Steel Light Poles Install the stainless steel light pole manufacturer provided Teflon or Xylan coated F436 structural washers and 1/2 inch thick washers/spacers (for 40 foot light poles only) used in the light pole anchor rod systems. Place the required washers between the nuts and the baseplate as specified elsewhere in Contract Documents to help isolate the galvanize metal from the stainless steel. Keep the coated washers in the packaging or container until the time specified to install them in accordance with the New Installation Procedures, Anchor Rod Tightening Handbook. Do not install the coated washers before then. I Sign Lighting Installation Provide sign lighting as specified in the Contract. Use direct buried lighting cable to provide power distribution to the signS tructure unless otherwise specified in the Contract. Use PVC Coated Galvanized Rigid Metal Conduit and conduit fittings in accordance with 3801.2C, “PVC Coated Galvanized Rigid Metal Conduit (PVC Coated Galvanized RMC),” and install in accordance with 2565.3D.6, “Conduit on Bridges (Concrete Encased, Hanging, and Surface Mounted).” I.1 Safety Switch Provide a safety switch in accordance with 3837.2A.5, “Heavy Duty Safety Switch,” and install in a vertical upright position. I.2 Safety Switch Wiring Install 12 AWG conductors with a 12 AWG Equipment grounding conductor in 3/4 inch conduit. Extend direct buried lighting cable or conductors from conduit at least 5 feet above the top of the sign pole foundation. Remove the outer jacket of the cable to access the individual conductors and the copper shield. Leave in-place a minimum of 4 inches and a maximum 6 inches of the outer jacket extending above the conduit. Splice the existing or new direct buried lighting cable in the sign pole base to the conductors from the safety switch in accordance with 2545.3G, “Splices.” Provide bonding and grounding in accordance with 2545.3O, “Bonding and Grounding.”
I.3 Lighting System Identification Plate (Overhead Sign) Provide and install a Lighting System identification plate as shown on the Plans and in accordance with 2564 “Traffic Signs and Devices.” I.4 Safety Cable Provide and install brackets, aircraft cable, and hardware required to assemble and attach a safety cable as shown on the Plans in accordance with 2564, “Traffic Signs and Devices.” J System Testing and Acceptance J.1 12-Hour Burn Test After completing the Feed Point and before the Department pays for greater than 90 percent of the Feed Point cost, energize the service cabinet and ensure the entire system can successfully operate without interruption for 12 hours during daylight. This Work is included in the Unit Prices of the Pay Items that are part of the L ighting System. K Service Equipment Installation Install service equipment in accordance with the NEC, local laws and governing ordinances, the electric utility company, 3837, “Service Equipment,” and the Plans. Refer to the Plans for approximate location of service points. The Engineer or the electrical utility company will determine the exact location of the service points. Contact the electric utility company for guidance when installing service Equipment on wood poles. If the electric utility company has no preference to how the service equipment is installed on wood poles, then install the service equipment as shown on the Plan. Terminate risers near the top of the wood pole and cap the risers with a weatherhead to prevent the entrance of water. Extend the service entrance conductors beyond the weatherhead with an additional 4 foot length for a drip loop, to allow the electrical utility company to connect at the service point. Provide NRTL L isted and Labeled Materials and install using safe and approved methods of bypassing the service cabinet’s meter socket in accordance with 2565.3A.1, “Compliance with Electrical Codes and Standards” when an electric utility meter is installed in the electric utility meter socket located on a wood pole or elsewhere instead of the designated meter socket of the service cabinet. For service equipment installation on mounting bracket assemblies, locate the meter sockets and disconnects as specified in the Contract. Mount the meter sockets directly above the disconnects. Ensure lugs for terminating conductors are sized according to the conductor wire gauge used. Do not trim strands of conductors to fit into undersized lugs. Coordinate with the electric utility company for the service point connection as specified in the “Service Connection” section. Perform a visual inspection with the electric utility company before making the service connection. K.1 Available Fault Current Calculations Provide available fault current calculations as required by the the NFPA 70 NEC Handbook Article 110.24 “Available Fault Current.” Perform the calculations for the available fault current at the line side of the meter socket for each service. If the service uses a 480/240 to 240/120 step down transformer, perform the calculations at the first device connected to the line side. Provide and install labels in traffic signal and lighting service cabinets for Service Cabinet Arc Flash Warning Hazard Labeling and Available Fault Current Calculation Labeling in accordance with 2545.3M “Lighting System Component Numbering and Labeling” for the calculation results.
K.1.a Electric Service Information Form Provide documented available fault current calculations performed for each service in accordance with the NFPA 70 NEC Handbook Article 110.24 “Available Fault Current.” Fill out and complete the following Electric Service Information Form: For Lighting: https://edocs-public.dot.state.mn.us/edocs_public/DMResultSet/download?docId=28763571&version=1 For Signals: https://edocs-public.dot.state.mn.us/edocs_public/DMResultSet/download?docId=28764647&version=1 Submit four copies of the completed form to the Engineer before final acceptance of the project. The Engineer will distribute copies to the following:
K.2 Lighting Service Cabinet Installation Install components of each Lighting Service Cabinet and include miscellaneous hardware required for a complete Lighting Service Cabinet installation. Install lighting service cabinets as specified in the Contract. Place the rubber gaskets sections that are supplied by the cabinet manufacturer between the bottom of the cabinet and the Equipment pad and leave a 1/2 inch gap in the gasket perimeter to allow for water drainage. When possible, position the twist lock photoelectric control light sensor to face north as instructed by the manufacturer. The photoelectric control light sensor may face east or west only if facing it north is not possible due to service cabinet orientati on. Position the cabinet door from 90 degrees to 180 degrees to the Roadway, away from traffic. K.2.a Type B Service Cabinet Attach service cabinet Type B to wood poles or mounting bracket assemblies as required by the Contract. Provide and install service Equipment including the following:
K.2.b Type L1, Type L2, and Type Rural Lighting and Flasher (RLF) Service Cabinets Securely fasten Lighting Service Cabinets to the Equipment pads specified in the Contract. K.3 Lighting Service Connection The Department will execute a Change Order and pay for the following Work as Extra Work in accordance with 1402.5, “Extra Work.”
Coordinate with the electric utility company to connect power to the service conductors. This Work to coordinate power to the service conductors includes the following:
service application
Traffic Office before returning the application to the electric utility company
company
provided on the supply side of the service point by the electric utility company
Ensure the “owner” of the utility information is filled out correctly on the connecting service application. Do not enter the Department (MnDOT) as the owner of the utility (electrical system) if the Department is not the owner of the utility. Use the Plan to identify the o wner of the electrical system. The owner is the “Operator” as defined in Minnesota State Law Chapter 216D, 216D.01 “Definitions.” Submit a copy of the completed connecting service application to the Engineer for approval before returning the application to the electric utility company. The Engineer will seek approval from the District Traffic Office and will notify the Contractor wh en the approval of the completed service application has been granted. Once approved, turn in the completed service application to the electric utility. Submit to the Engineer the paid receipt of the electric utility company invoice. This receipt will be reimbursed for the full amount plus 10 percent of the invoice price.
L Restoration and Cleanup ................................................................................................. 2565.2A M Lighting System Component Numbering and Labeling M.1 Lighting System Numbering Number Lighting Units and Lighting Service Cabinets as shown on the Plans with labels in accordance with 3844,”Labels.” Verify reinstalled Lighting Units are numbered as shown on the Plans. M.1.a Lighting Service Cabinet Numbering Number the service cabinets 4 feet above the Equipment pad with the Feed Point numbers and letters as shown on the Plan on the outside of the front door and the side of the cabinet that faces traffic. M.1.b Light Pole Numbering Number the Lighting Unit pole with Feed Point numbers and letters, and Lighting Unit number as shown on the Plans. Place the Feed Point numbers and letters, and Lighting Unit number 6 feet above the foundation on the pole at 45 degrees facing oncoming traffic.
Lighting Units installed on barrier place the Feed Point numbers and letters, and the Lighting Unit number 6 feet above the Roadway surface on the pole at 45 degrees facing oncoming traffic. For twin arm davit Lighting Units in center median, place the Feed Point numbers and letters for both directions of travel with the assigned L ighting Unit numbers as shown on the Plans. Lightly sand the pole shaft to remove oxidation. Wipe the pole shaft with isopropyl alcohol before applying numbers and letters. Heat the surface of the pole with a propane torch to ensure the label sticks to the pole when the outside temperature is less than 60°F. Avoid overheating the surface to prevent damage to the label. M.1.c Underpass Luminaire Numbering Number underpass luminaires with the last letter of the Feed Point and with the assigned Lighting Unit number as shown on the Plans. M.2 Lighting System Labeling M.2.a Labeling Branch Circuit Breakers in Lighting Service Cabinets Label branch circuit breakers on the interior of the Lighting Service Cabinets with the color of the circuit conductor and the Lighting Unit number. Use machine printed labels suitable for use in damp locations. Do not use labels made of paper. M.2.b Labeling Lighting Cable and Conductors Label cable or conductors in conduit in service cabinets and L ight Pole bases indicating the next termination point. For example, in the Lighting Service Cabinet the label would read “TO POLE #1”; in pole No. 1 the label would read “TO LIGHTING SERVICE CABINET” and “TO POLE #2.” Provide labels that consist of white vinyl adhesive tape wrapped around the cable or conductors. Hand write the labeling on the vinyl adhesive tape or produce with a label maker. If label marking is handwritten, accomplish the labeling by using a black permanent marker, in such a manner, that the markings are legible to the satisfaction of the Engineer. If labels are produced from a label maker, ensure labels are suitable for use in wet locations, and wrap the label around the cable one complete revolution with some overlap. M.2.c Labeling Luminaires
for the date of installation meeting the following requirements:
access door so the label showing the date can be read from ground level
the number 40 for a luminaire listed on the APL, Lighting titled “LED Luminaires For Use Mounted at 40 feet”
the number 49 for a luminaire listed on the APL, Lighting titled “LED Luminaire For Use Mounted at 49 feet” M.2.d Service Cabinet Arc Flash Warning Hazard Labeling Provide arc flash warning hazard labels in accordance with 3844, “Labels.” M.2.e Available Fault Current Calculation Labeling Provide arc flash warning hazard labels in accordance with 2565.2OO , “Arc Flash Warning Labels.” N Luminaire Installation Obtain the Engineer’s approval before installing luminaires. Install and level luminaires in accordance with the manufacturer’s installation instructions and as approved by the Engineer. Install a Department approved wire holder that supports the luminaire cables and conductors within the end of pole tenon near the luminaire slipfitter connection. After the Light Pole has been installed on the foundation place the luminaire on the pole tenon. Use a level on the designated area on top of the luminaire, or if provided use the luminaire internal leveling bubble. When leveling, level the luminaire side-to-side and front-to-back. Tighten the luminaire fitter connection bolts to the manufacturer’s recommended torque values. Use a calibrated torque wrench or other method that ensures manufacturer ’s recommended torque values have been met when tightening luminaire fitter connection bolts. Demonstrate to the Engineer for approval if using a method other than a calibrated torque wrench to meet recommended torque values before installing luminaires. If a photoelectric control or lighting control node (smart lighting control) is required to be installed on a luminaire, install the unit in accordance with the manufacturer’s installation requirements and the following:
of surrounding light sources and shadowing of Structures and vegetation
then face the window east or west
N.1 Underpass Luminaire Installation Install and level underpass luminaires in accordance with the manufacturer's installation instructions, as approved by the Engineer, and the following:
most left or right edge of the Travel Lane or Lanes
the underground handhole cable splice to the luminaire without any intermediate splices in the conductor run
Install components required for a complete and operational underpass luminaire which includes hardware for mounting. Provide liquid tight flexible non-metallic conduit in accordance with 3804, “Liquid Tight Flexible Non-Metallic Conduit (LFNC-B).” O Bonding and Grounding Provide bonding, grounding, grounding electrodes, grounding electrode conductors, E quipment grounding conductors, grounding electrode systems, and grounding connections in accordance with 2565.2A, “Conduit Accessories,” the NEC, and the following: Provide mechanically and electrically secured metal poles, conduit, service cabinets, service Equipment, and other non-current-carrying metal surfaces to form a continuous, bonded, grounded system and to provide a low impedance path from exposed metal surface to the system ground at the service cabinet or service Equipment. Bond the following to the system Equipment grounding conductor:
overhead light cable Use NRTL listed stainless steel, copper, tin plated copper, brass, or bronze connectors for bonding and grounding unless otherwise specified in the Contract. Use a lug type connector or bolt to connect the grounding and bonding jumper to the copper shield. Use cast clamps or grounding bushings with an integral lug to accommodate the jumper to attach other grounding and bonding jumper attachments. Provide at least 6 AWG solid bare bonding jumpers. Provide green colored insulated Equipment grounding conductors (EGC) of the same wire gauge size as the circuit conductors. Bond Light Poles to ground as specified below:
stainless steel poles or 1/2 inch hole for aluminum poles for placement under the active clamping grounding lug
through the copper shield. Non-breakaway pole bases may have a 5/16 inch stud welded in place for terminating the ground lug. Securely fasten the connection to the pole base
grounding conductor splice. Terminate the other end of the jumper to the pole base 5/16 inch grounding stud by using a NRTL listed re-usable screw type active clamping ground lug with a tang that connects to the 5/16 inch or 1/2 inch pole base grounding bolt
bonded and grounded connection
terminating and to the entire connection after final connection and assembly Install the supplemental ground rod electrodes at the locations specified in the Contract. Provide ground rod electrodes at every other light foundation and at the light foundations located at both ends of a run, unless otherwise specified in the Contract. Provide a direct grounding connection to a ground rod electrode for main switch cabinets, control cabinets, or service cabinets. For Bridges and buildings, bond each cabinet or metal Structure to the Bridge or building grounding electrode system. Make grounding conductor runs as short as possible. Apply anti-oxide joint compound on bonding and grounding conductors and connectors before final termination. P Existing Materials and Electrical Equipment ...................................................................... 2565.3 Remove, salvage, reinstall, or stockpile existing Materials and electrical Equipment as specified in the Contract or as directed by the Engineer. Q Wood Pole Installation .................................................................................................... 2565.2A R Lighting Units Install components of Lighting Units and include hardware required for a complete Lighting Unit installation. S Rodent Intrusion Barrier Provide rodent intrusion barrier in accordance with 3836, “Rodent Intrusion Barrier,” and install in pole bases using double-nut connections. Fill gaps between the barrier and the rodent intrusion barrier with 100 percent clear silicone sealant. If using stainless steel woven wire cloth, install as follows:
equally spaced factory supplied punched holes along the upward lip of the base plate in stainless steel transformer base openings
base plate, and the bottom edge of the woven wire cloth is tight against the top of the concrete foundation
prevents movement
(NEC) If using rodent intrusion barrier listed on the APL install in accordance with manufacturer’s installation instructions. Ensure to provide the listed rodent intrusion barrier specifically designed for the base plate openings of the poles installed on the Project. For aluminum Light Pole bases, fill gaps as a result of using leveling shims that exceed a 1/8 inch between the foundation and the aluminum light pole base with 100 percent clear silicone sealant. Do not completely seal around the perimeter between the foundation and aluminum light base.
2545.4METHOD OF MEASUREMENT
A Complete Systems The Engineer will measure separate items listed in the Contract for various types of complete electrical systems. The Engineer will measure the separate systems in accordance with the following: A.1 Lighting System The Engineer will measure each separate Lighting System as a single unit, complete in-place and operating. A.2 Sign Lighting System The Engineer will measure each separate sign Lighting System as an integral unit, complete in-place. A.3 Sign Lighting System Bridge Mounted The Engineer will measure each separate sign Lighting System Bridge mounted as an integral unit, complete in-place. A.4 Conduit System The Engineer will measure each separate Conduit System as an integral unit, complete in-place. B Electrical System Components The Engineer will measure separate items listed in the Contract for the various component parts of an electrical system in accordance with the following: B.1 Lighting Units The Engineer will separately measure Lighting Units of each type of mounting and luminaire design by the number of units of each type, complete in-place. B.2 Air Obstruction Light The Engineer will separately measure Air obstruction lights of each type of mounting and luminaire design by the number of lights of each type, complete in-place. B.3 Luminaires The Engineer will separately measure Luminaires of each type and wattage by the number of Luminaires complete in-place. B.4 Underpass Luminaires The Engineer will separately measure Underpass luminaries of each design by the number of Underpass lighting luminaires complete in-place. B.5 Light Foundations The Engineer will separately measure concrete foundations of each design for L ighting Units as integral units, complete in-place. B.6 Expansion Fittings The Engineer will separately measure Expansion fittings of each size for Lighting Units complete in-place. B.7 Deflection/Expansion Fittings The Engineer will separately measure Deflection/expansion fittings of each size for Lighting Units complete in-place.
B.8 Service Cabinets The Engineer will separately measure Service cabinets of each type by the number of cabinets, complete in-place. B.9 Wood Poles The Engineer will separately measure Wood poles by the number of Wood poles complete in-place. B.10 Underground Cable Splice The Engineer will separately measure Underground cable splices by the number of splices complete and in-place. B.11 Service Equipment The Engineer will separately measure Service Equipment by the number of Service Equipment complete and in-place and fully operational. B.12 Equipment Pads The Engineer will separately measure Equipment pads of each type by the number of Equipment pads complete in-place. B.13 Junction Boxes The Engineer will measure Junction boxes by the number of Junction boxes complete in-place. B.14 Handholes The Engineer will separately measure Handholes of each design by the number of Handholes complete in-place. B.15 Pulling Vaults The Engineer will separately measure Pulling vaults by the number of Pulling vaults complete in-place. B.16 Grounding Electrode The Engineer will separately measure Grounding electrodes by the number of Grounding electrodes complete in-place. B.17 Conduit The Engineer will separately measure conduit of each kind and diameter by the length between end terminals along the centerline of the conduit as installed. B.18 Underground Wire The Engineer will separately measure Underground wire of each kind and size by the length between end terminals along the centerline of the wire as installed. B.19 Direct Buried Lighting Cable The Engineer will separately measure Direct buried lighting cable of each kind and size by the length between end terminals along the centerline of the cable as installed. B.20 Overhead Light Cable The Engineer will separately measure Overhead light cable of each kind and size by the length between end terminals along the centerline of the wire as installed.
2545.5BASIS OF PAYMENT
The Contract Unit Price for Lighting Systems, sign Lighting Systems, sign Lighting System Bridge is full compensation for the cost of furnishing and installing the complete system as required by the Contract. The Contract Unit Price for conduit system includes conduit, trenching, augering, conduit sleeves, couplings, weatherheads, elbows, bushings, application of ferrous metal electrically conductive compound to threaded portions of the conduit, sealing around the conduit where it enters a pull box, se aling conduit ends in concrete foundations and in pull boxes, grounding and bonding of conduit, backfilling and restoring sod, Sidewalks, pavements, and other miscellaneous items required for a complete installatio n of the conduit. The Contract Unit Price for Lighting Units includes the luminaire, pole base, pole and bracket, inline fuse, wiring between pole base and luminaire, luminaire wire holder, splice to power circuit, numbering of the Light Pole, luminaire labeling, rodent intrusion barrier, and other miscellaneous items required for a complete installation of the Lighting Unit. The Contract Unit Price for Air obstruction lights includes the light, mounting bracket (if required), wiring between pole base and luminaire, splice to power circuit, luminaire labeling, and other miscellaneous items required for a complete installation of the Air obstruction light. The Contract Unit Price for Luminaires includes the complete Luminaire assembly, mounting, mounting hardware, wiring, connections, numbering of the Luminaire if not installed on a Light Pole, and other miscellaneous items required for a complete installation of the L uminaire. The Contract Unit Price for Underpass luminaries includes the complete Underpass luminaire assembly, mounting, mounting hardware, wiring, connections, luminaire labeling, and miscellaneous items required for the complete installation of Underpass luminaires. The Contract Unit Price for concrete Light foundations includes the cost of excavation, concrete, fine filter aggregate, reinforcement, anchor rods and assemblies, ground rods, grounding electrode conductors, grounding and bonding connections, conduit elbows, bushings, and other miscellaneous materials required for a complete installation of light foundations. The Contract Unit Price for Expansion fittings includes the Expansion fitting, grounding, connections, hangers, wrapping with sponge rubber, and other miscellaneous items required for a complete installation of an Expansion fitting. The Contract Unit Price for Deflection/expansion fittings includes the Deflection/expansion fitting, grounding, connections, hangers, wrapping with sponge rubber, and other miscellaneous items required for a complete installation of an Expansion fitting. The Contract Unit Price for Service cabinets includes the panel board enclosure, circuit breakers, switches, relays, photoelectric control, internal wiring, service entrance circuit, service entrance conduit and weatherhead for wood pole mounted cabinets, mounting hardware, grounding, painti ng, sealing around cabinet base, numbering of the service cabinet, and miscellaneous items required for a complete installation of the Lighting Service Cabinet. The Contract Unit Price for Wood poles includes the class of Wood pole, surface restoration, and other miscellaneous items required for the complete installation of W ood poles. The Contract Unit Price for Underground cable splices includes the splice kits and miscellaneous items required for a complete Underground cable splice. The Contract Unit Price for Service Equipment includes the meter socket and mounting brackets, conduit and power conductors on Wood pole, wiring connections, ground rod electrode, bonding and grounding Materials and connections, and Incidental items required to complete meter socket installation.
The Contract Unit Price for Equipment pads includes the excavation,granular Material subbase, concrete, reinforcement, anchoring hardware within the pad, conduits within the pad, ground rods, grounding connections, mounting brackets, mounting hardware, surface restoration, and miscellaneous items required for the complete Equipment pad installation. The Contract Unit Price for Junction boxes includes the Junction boxes, bushings, covers, gaskets, and miscellaneous items required for the complete installation of J unction boxes. The Contract Unit Price for Handholes includes the Handhole, frame and cover, excavation, Aggregate drain bed, backfilling, sealing conduit entrances, surface restoration, and miscellaneous items required for the complete installation of Handholes. The Contract Unit Price for Pulling vaults includes the Pulling vault and cover, excavation, Aggregate drain bed, backfilling, sealing conduit entrances, surface restoration, and miscellaneous items required for the complete installation of Pulling vaults. The Contract Unit Price for Grounding electrode includes Grounding electrode and splicing of grounding conductors to the Grounding electrode and miscellaneous items required for a complete bonded and grounded electrical system. The Contract Unit Price for conduit includes the conduit, conduit sleeves, couplings, elbows, bushings, sealing around the conduit where it enters a pull box, grounding and bonding, and other miscellaneous items required for a complete installation of the conduit. The Contract Unit Price for Underground wire includes the wire, pulling, splicing, terminals, making required connections, testing, and other miscellaneous items required for complete installation of Underground wire. The Contract Unit Price for Direct buried lighting cable includes the cable, trenching, shield bonding, connections, fittings, fastenings, hangers, backfilling and surface restoration, testing, and other miscellaneous items required for a complete installation of the Direct buried lighting cable. The Contract Unit Price for Overhead light cable includes the cable, grounding of the messenger wire, connections, fastenings, hangers, testing, and other miscellaneous items required for a complete installation of Overhead light cable. A Monetary Adjustments The Department must apply Incentives and Disincentives and may apply monetary deductions for Lighting Systems. The amounts of these adjustments are deemed reasonable. Submit a Unit Price of at least $1.00 per linear foot for Remove Direct Buried Lighting Cable. If the submitted Unit Price is less than $1.00 per linear foot for Remove direct buried lighting cable, the Department may assess a monetary deduction of $1.99 per linear foot for each foot of abandoned, out of service, no longer in use cable that was notable to be removed and the Engineer allowed to remain in-place.
B Schedule The Department will pay for Lighting Systems on the basis of the following schedule: Item No Item Unit
2545.501 Lighting System lump sum
1 Conduit System ____ lump sum
2 Lighting Unit Type ___ each
2 Air Obstruction Light each
2 Luminaire (____) each
2 Underpass Luminaires Type ___ each
2 Light Foundation Design ___ each
2 ___” Expansion Fitting each
2 ___” Deflection/Expansion Fitting each
2 Service Cabinet - Type ___ each
2 ___’ Wood Pole, Class ___ each
2 Underground Cable Splice each
2 Service Equipment each
2 Equipment Pad ____ each
2 Junction Box each
2 Handhole each
2 Pulling Vaults each
2 Grounding Electrode each
3 ___” Rigid Metalic Conduit linear foot
3 ___”PVC Coated Galvanized Steel Rigid Metalic Conduit linear foot
3 ___” Non-Metallic Conduit linear foot
3 ___” Non-Metallic Conduit linear foot
3 ___” Flexible Non-Metallic Conduit linear foot
3 Underground Wire ___/C __ AWG linear foot
3 Direct Buried Lighting Cable ___ Cond ___ AWG linear foot
3 Overhead Lighting Cable ___/C ___ AWG linear foot
2545.516 Sign Lighting System system
6 Sign Lighting System Bridge Mounted system