1750SIGNAL CABINET FOUNDATIONS

NC · 2024 Standard SpecificationsBook pages 835835View official source ↗

1747 -2 MATERIAL Furnish m aterial , equipment and hardware under this section that is pre-approved on the ITS and Signals QPL available on the Department’s website. 1747 -3 CONSTRUCTION METHODS Install LED blankout signs with wire entrance fittings, span wire cable mounting assemblies, pedestal mounti ng assemblies, rigid mounting assemblies, signal cable, lashing wire and all necessary hardware. Relocate existing blankout signs with all necessary hardware. 1747 -4 MEASUREMEN T AND PAYMENT LED Blankout Signs will be measured and paid as the actual number of LED blankout signs with mounting hardware furnished, installed and accepted. Relocate Existing Blankout Sign will be measured and paid as the actual number of blankout signs relocated and accepted. Payment will be made under: Pay Item Pay Unit LED Blankout Signs Each Relocate Existing Blankout Sign Each

SIGNAL CABINET FOUNDATIONS -1 DESCRIPTION Furnish and install signal cabinet foundations and all necessary hardware. Furnish either poured concrete foundations or preformed cabinet pad foundations and all necessary hardware. Obtain approval of foundation type from the Engineer . -2 MATERIAL Refer to Division 10. Item Section Signal Cabinet Foundation 1098 -16 Portland Cement Concrete 1000 -3 Furnish preformed cabinet pad foundation material, equipment and hardware under this section that is pre-approved on the ITS and Signals QPL available on the Department’s website . -3 CONSTRUCTION METHODS Comply with Section 825. When using poured concrete foundations and preformed cabinet pads , use procedures, equipment and hardware as follows:

(A)Locate new cabinets so as not to obstruct sight distance of vehicles turning on red.
(B)Obtain approval for final cabinet foundation locations before pouring concrete base.
(C)Do not install foundations over uncompacted fill or muck.
(D)Hand tamp soil before placing concrete and ensure ground is level.
(E)Maintain 12 inches minimum from service pole to closest point on foundation unless

otherwise approved by the Engineer .

Source: North Carolina Standard Specifications for Roads and Structures, 2024 Edition. Pages 835835 of 857.