550The survey records generated shall be the property of the Division and shall be available

WV · 2023 Standard SpecificationsBook pages 570571View official source ↗

shall be the property of the Division and shall be available to the Engineer for inspection or reproduction at all times. All survey records shall be transmitted before final project acceptance.

639.5-METHOD OF MEASUREMENT : "Construction Layout Stakes" will be measured as a complete unit. “As-Built Utility Survey” will be measure d as a complete unit.

639.6-BASIS OF PAYMENT : The quantity, determined as provided above, will be paid for at the contract unit price bid for the item below, which price and payment shall be full compensation for furnishing, setting, maintaining, and resetting, when necessary, the stakes, and for furnishi ng all engineering personnel, equipment, materials, and all incidentals. When “Construction Layout Stake” or “As -Built Utility Survey” begins on a section of the project, the payment shall be per lump sum on a monthly basis at partial payments equal to months of contract time remaining. Upon completion of all work on each section, the remaining amount will be released.

639.7-PAY ITEMS : ITEM DESCRIPTION UNIT 639001 -* Construction Layout Stake Lump Sum 639003 -* As-Built Utility Survey Lump Sum

* Sequence number

551 SECTION 640 FIELD OFFICE AND STORAGE BUILDING

640.1 -DESCRIPTION : This work shall consist of furnishing and maintaining in good condition suitable offices for the exclusive use of the Engineer as a field office or for making field tests, a storage building for concrete cylinder curing tanks, and equipment for the field office, all in accordance with these Specifications.

640.2 -MATERIALS : Not specified.

640.3 -LOCATION AND TIME OF ERECTION : The field office and storage building shall be set up at approved locations on or in the immediate vicinity of the Project. They shall be separated from any building used by the Contractor. The field office and storage building shall be set up, equipped, and made ready for use at least three days prior to the beginning of the work on the project.

640.4 -FIELD OFFICE : 640.4.1 -General: The office shall be entirely enclosed, waterproofed, and sealed inside with wall board which will provide efficient insulation against heat and cold. With the exception of a minimal field office, the office must be decent, safe and sanitary in accordance with Health Department regulations. The office shall be provided with an approved type of heating and cooling equipment that will mai ntain a comfortable seasonable temperature throughout the project life. It shall be furnished with satisfactory electric lighting and lighting service. A minimum of two duplex convenience outlets shall be provided in each room. The building shall be pro vided with neat, sanitary, enclosed toilet with exhaust fan accommodations for the exclusive use of the Engineer, and such facilities shall meet the requirements of the State Department of Health or other authorities having jurisdiction. It shall be stocked with lavatory and sanitary supplies at all times during the period of the contract. Additionally the Contractor shall provide, maintain, and pay for internet access via service such as Cable, DSL, Satellite or other system along with a wireless router for the field office. The wireless router and internet specifications such as minimum upload and download speeds can be located at the following WVDOH website: https://transportation.wv.gov/highways/TechnicalSupport/specifications/640.11fieldoffice/Pa ges/default.aspx . The office shall be attractively painted on the outside and shall be provided with a sign at least four ( 4) feet by one ( 1) foot, with the sign content as follows:

FIELD OFFICE THE WEST VIRGINIA DIVISION OF HIGHWAYS