213Overburden

WY · 2021 Standard Specifications✓ Full text on BuildSpecBook pages 190–0 Save this section

Ask about Section 213

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

Overburden

213.1DESCRIPTION

1 This section describes the requirements for removing and replacing overburden material from a material source.

213.2MATERIALS—V acant

213.3EQUIPMENT—V acant

213.4CONSTRUCTION

213.4.1 General

1 Strip topsoil in accordance with Section 207, Topsoil, and stockpile separately from the overburden stockpiles.

2 Strip material sources to the depth and extent necessary for the production of a quality material. Portions of the material source to be used and overburden stockpile locations may be designated by the engineer. Place overburden in neat, uniform stockpiles, located to not interfere with the removal of material from the source.

213.4.2 Replacing Stripped Material

1 After the construction materials are removed, place the overburden over the material source area before placement of topsoil. Place the material uniformly, and smooth it to blend with the surrounding terrain. Place topsoil in accordance with Section 207, Topsoil.

213.5MEASUREMENT and PAYMENT

213.5.1 General

1 The engineer will measure:

1.Overburden Removal by the cubic yard [cubic meter] using volumetric

measurements.

2.Overburden Placing by the cubic yard [cubic meter] computed as the difference

between the original volume in the stockpiles and the volume remaining in the stockpiles upon completion of the work.

If overburden is stripped from its original position and placed directly in its final position, it will be measured as Overburden Placing. The quantity will be

Overburden SECTION 213

determined from preliminary and final volumetric measurements of the stripped area.

2 The engineer will not make additional measurements if overburden stockpiles are moved to facilitate material source operations, except when the stockpile locations were directed by the engineer.

3 The department will pay as follows:

Pay Item

Pay Unit Measure to the Nearest Pay to the Nearest Overburden Placing CY [m3] 0.1 ft [0.05 m] CY [m3] Overburden Removal CY [m3] 0.1 ft [0.05 m] CY [m3]

213.5.2 Referenced Sections for Direct Payment

1 When specified, the engineer will measure and pay for removal and placement of topsoil in accordance with Section 207, Topsoil.

Referenced in this section

Get an email when 213 changes

Wyoming revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Wyoming Standard Specifications for Road and Bridge Construction, 2021 Edition. Pages 190–0 of 771. View official source ↗

Ask about this section

Scoped to Wyoming WYDOT Standard Specifications for Road & Bridge Construction, Section 213 — Overburden. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.