213determined from preliminary and final volumetric measurements of the stripped

WY · 2021 Standard SpecificationsBook pages 00View official source ↗

area. 2 The engineer will not make additional measurements if overburden stockpiles are moved

to facilitate material source operations, except when the stockpile locations were directed by the engineer. 3 The department will pay as follows:

Pay Item

Pay Unit

Measure to the Nearest

Pay to the Nearest

Overburden Placing

CY [m3]

0.1 ft [0.05 m]

CY [m3]

Overburden Removal

CY [m3]

0.1 ft [0.05 m]

CY [m3]

213.5.2 Referenced Sections for Direct Payment 1 When specified, the engineer will measure and pay for removal and placement of topsoil

in accordance with Section 207, Topsoil.

175

Lime Treated Subgrade

214.1DESCRIPTION

1 This section describes the requirements for constructing one or more courses of a

mixture of soil, lime, and water.

214.2MATERIALS

1 Provide materials in accordance with the following:

Materials

Subsection

Hydrated Lime Water

820 814.1

2 Use existing subgrade soil or approved borrow material, as specified, with deleterious

materials removed.

214.3EQUIPMENT

214.3.1 General 1 Correct equipment leaks immediately, or remove the equipment from the work area.

214.3.2 Lime Spreaders 1 Use lime spreading equipment capable of spreading lime uniformly at the specified

rate and keeping the slurried lime in suspension. 214.3.3 Water Distribution 1 Use equipment capable of uniformly distributing the required water.

Do not use water

pumps on water distributors. 214.3.4 Mixing 1 Use a self-propelled rotary mixer, except that disc harrows, motor graders, and other

equipment may be used to supplement the mixing performed by the rotary mixer. Use mixing equipment capable of mixing to a compacted depth of at least 10 in [250 mm].

Provide a traveling mixing plant for incorporating the lime into the soil designated for treatment. Ensure that the traveling mixing plant is capable of spreading the lime slurry in an even, traverse layer, providing a homogeneous mixture of lime and subgrade, and