General

210Pay Item

WY · 2021 Standard SpecificationsBook pages 00View official source ↗

Pay Unit

Measure to the Nearest

Pay to the Nearest

Motor Grader Roller, Type___ Scraper

HR [h] HR [h] CYHR [m3h]

0.5 h 0.5 h yd3, 0.5 h [m3, 0.5 h]

0.5HR [0.5 h]

HR [0.5 h]

CYHR [0.5 m3h]

Truck

CYHR [m3h]

yd3, 0.5 h[m3, 0.5 h]

CYHR [0.5 m3h]

210.5.2 Referenced Sections for Direct Payment

When specified, the engineer will measure and pay for:

1.Additional power equipment required to load scrapers to capacity by equipment

hours in accordance with Section 210, Equipment Work, for the equipment used or in accordance with Subsection 109.4, Extra and Force Account Work.

2.Equipment used to load trucks by equipment hours in accordance with Section

210, Equipment Work, for the equipment used or in accordance with Subsection 109.4, Extra and Force Account Work.

168

Culvert Cleaning

211.1DESCRIPTION

1 This section describes the requirements for removing, hauling, and disposing of debris,

silt, and obstructions from existing culverts.

211.2MATERIALS—Vacant

211.3EQUIPMENT—Vacant

211.4CONSTRUCTION

1 Unplug and flush clean existing culverts as specified.

Dispose of material removed

at a contractor-furnished site. 2 Do

not damage culverts, appurtenances, or property or create a public hazard or nuisance. If damage occurs, repair in accordance with Subsection 107.8, Protection and Restoration of Property, Markers, and Landscape.

211.5MEASUREMENT and PAYMENT

1 The engineer will measure Culvert Cleaning by the each. 2 The department will pay as follows:

Pay Item

Pay Unit

Measure to the Nearest

Culvert Cleaning

EA [Ea]

EA [Ea]

169

Pay to the Nearest EA [Ea]

Structure Excavation and Backfill

212.1DESCRIPTION

1 This section describes the requirements for excavation and backfill for the construction

of bridge foundations, retaining walls, bin walls, and other structures and for the disposal of excess materials. 2 Structure excavation will be classified as follows:

1.Dry excavation is material removed from above the water line.
2.Wet excavation is material removed from below the water line.

212.2MATERIALS

Provide materials in accordance with the following: Materials

Subsection

Pervious Backfill

Material 803

2 Provide backfill material consisting of

clean gravel from sources other than surface water sources and free from large or frozen lumps, wood, rocks, or other potentially harmful matter.

212.3EQUIPMENT—Vacant

212.4CONSTRUCTION

212.4.1 General

1 Where practical, construct structures in open excavation. Shore or brace, and protect

with cofferdams, where necessary. Forms may be omitted, with the approval of the engineer, when the site is dry and footings can be placed without cofferdams. Fill the excavation with concrete to the top of the footing, in accordance with Section 513, Structural Concrete. Provide and place additional concrete required because of eliminating the forms, at no additional cost to the department. If additional excavation depth is required by the engineer, the department will pay for additional Class B concrete. 2 Restore channels to as near original condition as possible.

170

Structure Excavation and Backfill

Source: Wyoming Standard Specifications for Road and Bridge Construction, 2021 Edition. Pages 00 of 771.