General

2172 The department will pay as follows:

WY · 2021 Standard SpecificationsBook pages 00View official source ↗

Pay Item

Pay Unit

Measure to the Nearest

Pay to the Nearest

Geotextile

SY [m2]

0.1 ft [0.5 m]

SY [m2]

Biaxial Geogrid Biaxial Geogrid (STIFF)

SY [m2] SY [m2]

0.1 ft [0.5 m] 0.1 ft [0.5 m]

SY [m2] SY [m2]

217.5.2 Referenced Sections for Direct Payment 1 When specified, the engineer will measure and pay for cover material in accordance

with Section 203, Excavation and Embankment.

202

Impermeable Plastic Membrane

218.1DESCRIPTION

1 This section describes the requirements for furnishing and placing impermeable plastic

membrane.

218.2MATERIALS

1 Provide materials in accordance with the following:

Materials

Subsection

Impermeable Plastic Membrane

0805

218.3EQUIPMENT—Vacant

218.4CONSTRUCTION

218.4.1 General 1 During shipment and storage, protect membrane rolls from direct sunlight, ultraviolet

rays, moisture, temperatures greater than 140 °F [60 °C], mud, dirt, dust, and debris. When storing outdoors, elevate the rolls, and protect them with a waterproof cover. Remove unprotected membrane from the project.

Submit test results and certification by the manufacturer showing the membrane performance relative to requirements. Submit a test sample 6 ft [2 m] long by the full width of the roll at least 14 calendar days before the use of any membrane. Obtain this sample from a roll of membrane that is on the project site. Make sure the sample is labeled with the product name, machine direction, lot and batch number, date of sampling, project number, and certification of compliance. 3 Do not place membrane during wet weather or when the subgrade is wet.

218.4.2 Installation 218.4.2.1 General 1 Overlap longitudinal and lateral joints at least 6 in [150 mm] and glue using a product

type, application rate, and curing procedure recommended by the membrane manufacturer. If joints are not glued, overlap the membrane at least 24 in [600 mm]. Shingle the overlaps so that the exposed edges face the same direction as the flow of drainage. Reinforce and seal blemishes, holes, or scars with waterproof plastic adhesive tape. Replace damaged portions of membrane and unsealed joints, at no additional cost

203

Impermeable Plastic Membrane

Source: Wyoming Standard Specifications for Road and Bridge Construction, 2021 Edition. Pages 00 of 771.