1 The engineer will measure:
1.
Clearing and Grubbing by the acre [hectare] or the complete unit. The engineer will use one or more of the following methods:
1.1Area Basis. By the acre [hectare], within the limits specified or staked by
the engineer. 1.2.
2.
Lump-Sum Basis. No measurement.
Clearing Trees in [mm] by the each. Trees less than 4 in [100 mm] in diameter will be classified as brush. Trees will be classified and measured in accordance with Table 201.5-1, Nominal Tree Size Measuring. Table 201.5-1 Nominal Tree Size Measuring Diameter of Tree at Height of 24 in [600 mm] Pay Item (in [mm]) Size Designation 4 to 8 [100 to 200] Over 8 to 12 [201 to 300] Over 12 to 24 [301 to 600] Over 24 to 36 [601 to 900] Over 36 to 60 [901 to 1500] Over 60 [over 1500]
6 in [150 mm] 10 in [250 mm] 18 in [450 mm] 30 in [750 mm] 48 in [1200 mm] 60 in [1500 mm]
2 The department will pay as follows:
Pay Item
Pay Unit
Measure to the Nearest
Clearing and Grubbing
LS, ACRE [LS, ha]
LS, ft [LS, 0.5 m]
LS, 0.01 ACRE [LS, 0.005 ha]
Cleaning Trees ____ in [mm]
EA [Ea]
EA [Ea]
EA [Ea]
129
Pay to the Nearest
Removal
202.1DESCRIPTION
1 This section describes the requirements for removing and disposing of obstructions or
appurtenances not specified to remain; salvaging material; backfilling trenches, holes, and pits; and removing and resetting mailboxes.
202.2MATERIALS
1 Provide
mailbox components as specified. Provide galvanized nuts, screws, bolts, and hardware.
202.3EQUIPMENT
1 If the contract includes pay items Milling Plant Mix, Milling Concrete, or Profile Milling
Plant Mix, remove the existing pavement using a power-operated milling machine. Provide a machine equipped to perform the following:
single pass.
from an independent grade control, and with a positive means of controlling cross slope elevations.
2 Other equipment providing the same or better results may be used for removal, with the
approval of the engineer.
Cut bituminous pavement with a saw. Other equipment may be used if cuts are demonstrably equivalent, with the approval of the engineer. 4 Cut concrete using a saw with diamond blades.
130
Removal