1 Correlate results from the contractor’s and department’s density tests during placement
of test strip. Use the following procedures:
numbers with exclusion of locations within 12 in [300 mm] of the pavement edge.
engineer.
using a nondestructive method.
and density; do so independent of the department.
independent of the contractor.
have been completed. 114.3.4 Resolving Field Testing Discrepancies 1 Resolve discrepancies as follows:
condition, and equipment calibrations in attempt to solve the problem.
correlation procedure.
results represent different sample populations, conduct referee testing.
samples for aggregate gradations and the department’s cores for density testing.
receiving the samples.
correlating with the Materials Program test results for the quality acceptance calculations.
126
Earthwork
127
Clearing and Grubbing
201.1DESCRIPTION
1 This section describes the requirements for clearing, grubbing, removing, and disposing
of vegetation and debris.
201.2MATERIALS—Vacant
201.3EQUIPMENT—Vacant
201.4CONSTRUCTION
201.4.1 General 1 The engineer will establish right-of-way and construction lines and designate vegetation
and other objects to remain. Protect from harm or defacement any vegetation and objects designated to remain. 201.4.2 Clearing and Grubbing 1 Clear or grub surface objects, trees, shrubs, plants, stumps, roots, and other protruding
obstructions not specified to remain. 2 Fell and remove timber in a way that minimizes damage to riparian habitat. 3 Except in urban areas, stumps outside slope stake limits may remain in place if cut flush
with the ground. In urban areas, cut stumps flush and grind to below grade. 4 Backfill with suitable material and compact holes left by removed stumps and other
obstructions, in accordance with Subsection 203.4.3, Embankment and Cut Areas with Moisture and Density Control. 5 Unburned refuse and debris become the property of the contractor; remove it from the
right-of-way. 201.4.3 Mulching 1 Incorporate brush and existing vegetation that can be used as mulch into the topsoil in
accordance with Subsection 207.4.1, Topsoil, Construction, General.
128
Clearing and Grubbing