General

4112 The department will pay as follows:

WY · 2021 Standard SpecificationsBook pages 00View official source ↗

Pay Item

Pay Unit

Measure to the Nearest

Pay to the Nearest

Glass Fiber Reinforced Paving Fabric Paving Fabric

SY [m2]

0.1 ft [0.05 m]

SY [m2]

SY [m2]

0.1 ft [0.05 m]

SY [m2]

411.5.2 Referenced Sections for Direct Payment 1 When specified, the engineer will measure, pay, and price adjust for Asphalt Binder

(PG__-__) in accordance with Section 401, Plant Mix Pavement. The measurement will not include quantities of PGAB applied in excess of the application rate.

326

Plant Mix Surface Appurtenances

412.1DESCRIPTION

1 This section describes the requirements for constructing curbs, spillways, median pavings,

bike paths, or other minor items constructed of plant mix.

412.2MATERIALS

1 Provide materials in accordance with the following:

Material

Subsection

Aggregate for Plant Mix Emulsified Asphalt Hydrated Lime Performance Graded Asphalt Binder

803 804.3 820 804.1

2 Use an authorized source of PGAB, in accordance with Subsection 804.1, Performance

Graded Asphalt Binder and Subsection 401.2.1, Performance Graded Asphalt Binder. 3 Construct appurtenances of plant mix of the type specified. When both a ¾-inch [19 mm]

maximum and a ½-inch [12.5 mm] maximum nominally-dimensioned aggregate are specified, use either.

412.3EQUIPMENT

Provide equipment in accordance with the requirements of Subsection 401.3, Equipment.

412.4CONSTRUCTION

412.4.1 General 1 Construct appurtenances only when the air temperature is 50 °F [10 ° C] or higher

and the weather is dry. 2 Construct on firm foundations shaped and compacted to coincide with the bottom surface

of the appurtenance. 3 Immediately before construction, clean existing concrete or plant mix surfaces on or

against which the appurtenance will be placed and lightly coat with tack coat in accordance with Section 407, Tack Coat.

327

Plant Mix Surface Appurtenances

Source: Wyoming Standard Specifications for Road and Bridge Construction, 2021 Edition. Pages 00 of 771.