Grout

819.1Grout

819.1.1 Sand-Cement Grout

1 For sand-cement grout, provide and use grout composed of portland cement in accordance with Subsection 801.1, Portland Cement, sand in accordance with Subsection 803.3, Aggregate for Mortar, and only enough water to allow placing and packing; ensure a proportion of cement to sand, measured by volume, of 1:2. Mix approximately 45 minutes before use.

819.1.2 Cementitious Grout

1 Provide and use a product in accordance with ASTM C 1107.

819.2Epoxy Resin Grout

1 For epoxy resin grout, provide and use a product in accordance with Table 819.2-1.

Table 819.2-1 Epoxy Grout Properties Description Value Standard 2-Component Compressive Strength > 15,000 psi at 48 hours ASTM C579 Compressive Modulus > 2,500,000 psi at 7 days ASTM C579 Tensile Strength > 3,500 psi at 7 days ASTM C307 Gel Time 45 - 90 minutes ASTM D2471 Linear Shrinkage on Cure < 0.03%, Non-expansive ASTM C531 Coefficient of Thermal Expansion < 20 x 10-6 in/in-F ASTM C531 3-Component Compressive Strength > 11,000 psi at 48 hours ASTM C579 Compressive Modulus > 1,800,000 psi at 7 days ASTM C579 Tensile Strength > 2,500 psi at 7 days ASTM C307 Gel Time 90 - 240 minutes ASTM D2471 Linear Shrinkage on Cure < 0.01%, Non-expansive ASTM C531 Coefficient of Thermal Expansion < 18 x 10-6 in/in-F ASTM C531

Grout in other states

Get an email when 819 changes

Wyoming revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Wyoming Standard Specifications for Road and Bridge Construction, 2021 Edition. Pages 766–0 of 771. View official source ↗