5052 The department will pay as follows:

WY · 2021 Standard SpecificationsBook pages 00View official source ↗

Pay Item

Pay Unit

Measure to the Nearest

Bridge Barrier

FT [m]

0.1 ft [0.05 m]

FT [0.5 m]

Bridge Median Barrier

FT [m]

0.1 ft [0.05 m]

FT [0.5 m]

Median Barrier in ____ in [mm]

FT [m]

0.1 ft [0.05 m]

FT [0.5 m]

Shoulder Barrier

FT [m]

0.1 ft [0.05 m]

FT [0.5 m]

442

Pay to the Nearest

Drilled Shaft Foundations

506.1DESCRIPTION

1 This section describes the requirements for constructing drilled shaft foundations.

506.2MATERIALS

1 Provide materials in accordance with the following:

Material

Subsection

Admixtures Aggregate for Concrete Fly Ash Portland Cement Reinforcing Steel Water

801.4 803 801.2 801.1 811.1 814.1

506.3EQUIPMENT

1 Ensure that equipment meets the following requirements:

Equipment

Subsection

Batch Plant Mixers Placing Equipment

513.3.1 513.3.2 513.3.3

2 Provide a power-driven rotary auger or, if required, rock drilling equipment.

Provide a rig of sufficient size and capacity and equipped to produce holes of the diameter and depth specified.

506.4CONSTRUCTION

506.4.1 Drilled Holes

1 At least 30 calendar days prior to the start of drilled shaft construction, submit four

copies of the Drilled Shaft Excavation and Installation Form E-151 for acceptance to the engineer, with a copy to the Geology Program. The department will evaluate the Drilled Shaft Excavation and Installation Form E-151 for conformance with the contract and specifications within ten working days after receipt of the submission. At the option of the department, a Drilled Shaft Installation Plan Meeting may be scheduled following review of the contractor's initial submittal of the form. Do not begin work until the Drilled Shaft Excavation and Installation Form E-151 is accepted in writing by the engineer.

443

Drilled Shaft Foundations

Source: Wyoming Standard Specifications for Road and Bridge Construction, 2021 Edition. Pages 00 of 771.