Re-roof permit checklist — Herriman, Utah
Assembled from Herriman’s own published permit rules. Every line below is quoted from a city document and linked to it. Nothing here is generated, estimated, or inferred from another jurisdiction.
Do you need a permit?
Herriman requires a permit for a re-roof.
If only a layer of shingles is being added, no permit is required; a maximum of two layers is allowed. Removing all shingles down to the wood sheathing requires a building permit and inspections. Repairing roof damage or remodeling the roof requires a Remodel Building Permit and inspections.
What Herriman publishes for this permit
- 3 submittal documents to include with the application
- 2 required inspections, in the city's published order
- 1 process step from application to final
- 1 published fee line from the city's fee schedule
- Checked against Herriman's documents on September 15, 2026
Loading the full checklist…
Sources
- reroof — permit rules ↗verified September 2026
Other permits Herriman publishes rules for
Listed because the city publishes a separate rule for each type — not because this project necessarily triggers one. Whether it does depends on your scope of work.
- Deck permit checklist
- Fence permit checklist
- Shed permit checklist
- Water heater permit checklist
- Retaining wall permit checklist
- Electrical work permit checklist
- General building work permit checklist
BuildSpec is a reference, not the authority having jurisdiction. Confirm requirements with Herriman before you build.