Retaining wall permit checklist — Herriman, Utah

Assembled from Herriman’s own published permit rules. Every line below is quoted from a city document and linked to it. Nothing here is generated, estimated, or inferred from another jurisdiction.

Do you need a permit?

Herriman requires a permit for a retaining wall.

When a permit is not required

A permit is required for a rock/masonry wall with 4 feet or more of unbalanced fill, whether built of rock, brick, block, masonry, concrete, railroad ties or similar. A permit is also required for a wall under 4 feet tall if it is holding a surcharge. Any structure or other item within the 45-degree plane of a rock wall creates a surcharge, and any wall holding a surcharge requires engineering regardless of height. Rock walls cannot be built in the front utility easement, and rock/masonry walls are required where slopes exceed 2:1.

What Herriman publishes for this permit

  • 6 submittal documents to include with the application
  • 2 required inspections, in the city's published order
  • 1 process step from application to final
  • 1 published fee line from the city's fee schedule
  • Checked against Herriman's documents on September 15, 2026

Loading the full checklist…

Sources

Other permits Herriman publishes rules for

Listed because the city publishes a separate rule for each type — not because this project necessarily triggers one. Whether it does depends on your scope of work.

All Herriman permit requirementsHerriman permit costsApply with the city ↗