B
HomeLibrariesCopilotSearchProjectsBookmarks
FeedbackHelp Desk
Libraries
Building Codes
Code LibraryIBC — BuildingIRC — ResidentialIFC — FireIPC — PlumbingIMC — MechanicalIFGC — Fuel GasIECC — EnergyNEC — ElectricalModel Codes
Specifications
CSI SpecificationsDOT SpecsTransit SpecsUSACE
Standards
TransportationRailroadFire SafetyAccessibilityStructural
Tools & References
DiagramsAssembliesProductsCalculatorsChecklistsPermits
PricingLog in
Earthwork & Related (200-299)

287ASPHALT TREATED PERMEABLE BASE

FL · 2024 Standard SpecificationsBook pages 255259View official source ↗

287-1 Description.

Construct asphalt treated permeable base (ATPB) and outlet pipe for use under concrete pavement, in accordance with the details shown in the Plans and Standard Plans, Index 446-001. Meet the plant and equipment requirements of Section 320 and the general construction requirements of Section 330, except as noted bel ow.

287-2 Materials.

Meet the following requirements: Coarse Aggregate, Stone, Slag, or Crushed Gravel Grade No. 57 or 67 ................................ ..............Section 901 Superpave PG Asphalt Binder (PG 67 -22) (1) .............. 916-1 Hydrated Lime (2) ..................... AASHTO M -303-89 Type 1 Polyvinyl -Chloride Pipe (3) ................................ .Section 948 Polyethylene Pipe (3) ................................ ...........Section 948 Geosynthetic Material ................................ .........Section 985

1.Use PG 67-22 in the ATPB containing 0.50% heat -stable anti -strip additive (by weight of asphalt) from an approved source. Introduce and mix the anti -strip additive at the terminal.
2.For mixtures containing granite, add hydrated lime at a dosage rate of 1.0% by weight of the total dry aggregate in lieu of adding 0.50% anti -strip additive. Submit certified test results for each shipment of hydrated lime indicating compliance with the specifications. In addition, meet the requirements of 337 -9.2 and 337 -9.3.
3.Use either polyvinyl chloride pipe or polyethylene pipe, unless otherwise specified in the Contract Documents.

287-3 Composition of Mixture.

287-3.1 General: Use ATPB composed of a combination of coarse aggregate and asphalt

cement. Use a mix design verified by the Engineer.

287-3.2 Mix Design: Submit a proposed mix design along with representative samples of

all component materials to the Engineer, at least two weeks before the scheduled start of production. Establish the design asphalt content within the range of 2.0 - 4.0%, by weight of total mixture. During the mix design process, the Engineer may adjust the asphalt content within the 2.0 - 4.0% range. The Engineer may increase or decrease the specified asphalt content during production of the mix after testing and visual inspection. Ensure t hat a minimum of 95% of the aggregate is coated. There will be no separate payment for the bituminous material in the mix. Establish the mix temperature within the range of 230ºF to 250ºF, or as approved by the Engineer.

287-4 Control of Quality.

Provide the necessary control of the ATPB and construction in accordance with the applicable provisions of 320 -2 and 330 -2. FY 2023-24 Return to Table of Contents

287-5 Acceptance of the Mixture at the Plant.

The ATPB mixture will be accepted at the plant with respect to 334 -5.1 with the following exc eptions:

1.The mixture will be accepted with respect to gradation (P -1/2 if No. 57 stone is used and P -3/8 if No. 67 stone is used) and asphalt binder content (P b) only.
2.Testing in accordance with AASHTO T312-12 and FM 1-T209 (and conditioning of t he mix prior to testing) will not be required as part of 334 -5.1.1.1.
3.The standard LOT size will be, 2,000 tons, with each LOT subdivided into four equal sublots of 500 tons each.
4.Initial production requirements of 334 -5.1.3 do not apply.
5.The Between -Laboratory Precision Values described in Table 334 -7 are modified to include (P -1/2 and P-3/8) with a maximum difference per FM 1-T030 (Figure 2).
6.Table 334 -6 (Master Production Range) is replaced by Table 287 -1. Table 287-1 ATPB Master P roduction Range Characteristic Tolerance (1) Asphalt Binder Content (%) Target ± 0.60 Passing 1/2 inch Sieve (%) if using No. 57 stone Target ± 12.00 Passing 3/8 inch Sieve (%) if using No. 67 stone Target ± 12.00
1.Tolerances for sample size of n = 1 from the verified mix design

287-5.1 Individual Test Tolerances for ATPB Production: In the event that an

individual Quality Control test result of a sublot for gradation (P -1/2 if No. 57 stone is used and P-3/8 if No. 67 stone is used), or asphalt binder content does not meet the requirements of Table 287-1, take steps to correct the sit uation and actions taken shall be reported to the Engineer. In the event that two consecutive individual Quality Control test results for gradation (P -1/2 if No. 57 stone is used and P -3/8 if No. 67 stone is used) or asphalt binder content do not meet the requirements of Table 287 -1, the LOT will be automatically terminated and production of the mixture stopped until the problem is adequately resolved (to the satisfaction of the Engineer), unless it can be demonstrated to the satisfaction of the En gineer that the problem can immediately be (or already has been) resolved. Evaluate any material represented by the failing test result in accordance with 334 -5.1.9.

287-6 Acceptance of the Mixture at the Roadway.

Acceptance of the Contractor’s methods of placement and compaction will be based upon the completion of a 500 foot test section, (initially and at other times as determined by the Engineer), acceptable to the Engineer, prior to further placement. In the event that the placement/compaction method deviates from the approved method, cease placement of the mix until the problem is adequately resolved to the satisfaction of the Engineer.

287-7 Temperature and Storage Limitations.

Place the ATPB material when the atmospheric temperature is above 50ºF a nd rising. Do not use ATPB material that was mixed more than two hours prior to placement. FY 2023-24 Return to Table of Contents

287-8 Construction Requirements.

287-8.1 Placement: Ensure that the structural course on which ATPB is to be placed

conforms to the compaction and elevation toleran ces specified in the Contract Documents and is free of loose or extraneous material. Fill any area of the structural course which is lower than the grade established by the Plans with structural course material, at no additional cost to the Department. Place and compact ATPB in one lift, with a compacted thickness of 4 inches plus or minus 1/2 inch (except the trench which includes the subdrainage pipe), in accordance with these Specifications, lines, grades, dimensions and notes as shown in the Plans. Place and compact ATPB material around the subdrainage pipe for the full width of the trench, in layers not exceeding 8 inches (loose measure). Do not displace or damage the subdrainage pipe or filter fabric. Remove and replace all ATPB material which is greater than 1/2 inch below the grade shown in the Plans or, in the opinion of the Engineer, is damaged or contaminated, at no additional cost to the Department.

287-8.2 Compaction: Compact the ATPB by one of the following methods:

1.A steel -wheeled, tandem roller which will produce an operating weight of not more than 140 PLI of drum width.
2.A steel -wheeled tandem roller weighing from 8 to 12 tons. Compact the ATPB material (in the static mode only) as approved by the Engineer. Begin compaction as soon as the surface temperature has cooled to 190 F, or as approved by the Engineer and complete compaction before the surface temperature has cooled to 100F. If necessary, cool the ATPB material with water.

287-8.3 Surface Requirements: Ensure that t he finished surface of the ATPB does not

vary more than plus or minus 1/2 inch from the grade shown in the Plans. The Engineer may approve removal of high spots to within specified tolerance by a method which does not produce contaminating fines. Remove and replace ATPB material that is outside the established tolerance, at no additional cost to the Department. Grinding or milling will not be permitted.

287-9 Subdrainage Pipe and Geo synthetic Material.

Place the subdrainage pipe and geo synthetic material (filter fabric) in accordance with the Plans and Standard Plans, Index 446-001.

287-10 Outlet Pipe.

Install outlet fittings and pipes concurrent with subdrainage pipe to provide positive gravity drainage and eliminate soil intrusion. The Enginee r will restrict installation of additional sections of ATPB, until appropriate outlets are installed. Ensure that all fittings and materials are designed and installed to eliminate soil intrusion into the system. Connect the open end of the outlet pipe i nto either an existing drainage structure, existing ditch pavement or terminate with a concrete apron. Do not block the drainage system at any time. Ensure that at the time of inspection and project acceptance, all outlet pipes and concrete aprons are cle ar of earth material, vegetation, and other debris. FY 2023-24 Return to Table of Contents

287-11 Compensation .

Meet the requirements of 334 -8 with the following exceptions:

1.Pay factors will be calculated for asphalt binder content and the percentages passing the 1/2 inch and the 3/8 inch sieves only.
2.Table 287 -2 replaces Table 334 -8.
3.Table 287 -3 replaces Table 334 -9.
4.The Composite Pay Factor in 334 -8.3 is replaced with the following: CPF = [(0.25 x PF 1/2 inch or 3/8 inch) + (0.75 x PF AC)] Note: Use the PF for the 1/2 inch sieve if No. 57 stone is used in the mixture or use the PF for the 3/8 inch sieve if No. 67 stone is used in the mixture. Table 287-2 Small Quantity Pay Table for ATPB Pay Factor 1-Test Deviation 2-Test Average Deviation Asphalt Binder Content (%) 1.00 0.00-0.50 0.00-0.35 0.90 0.51-0.60 0.36-0.42 0.80 >0.60 >0.42 1/2 inch Sieve (%) if using No. 57 stone 1.00 0.00-11.00 0.00-7.78 0.90 11.01-12.00 7.79-8.49 0.80 >12.00 >8.49 3/8 inch Sieve (%) if using No. 67 stone 1.00 0.00- 11.00 0.00- 7.78 0.90 11.01-12.00 7.79-8.49 0.80 >12.00 >8.49 Table 287-3 Specification Limits for ATPB Quality Characteristic Specification Limits Asphalt Binder Content (%) Target ± 0.45 Passing 1/2 inch sieve (%) if using No. 57 stone Target  10.00 Passing 3/8 inch sieve (%) if using No. 67 stone Target  10.00

287-12 Low Quality Material.

Meet the requirements of 334 -5.1.9. For ATPB, use the Master Production Range defined in Table 287 -1 in lieu of Table 334 -6.

287-13 Method of Measurement.

287-13.1 Asphalt Treated Permeable Base: The quantity of ATPB to be paid for will

be the plan quantity, in cubic yards, completed and accepted, subject to 9 -3.2. No allowance will be made for ATPB placed outside plan dimensions, unless otherw ise ordered by the Engineer. FY 2023-24 Return to Table of Contents Prepare and submit a Certification of Quantities to the Engineer in accordance with 9-2.1.2.

287-13.2 Outlet Pipe: The quantity of outlet pipe to be paid for will be the length, in

feet, measured in place along the centerlin e and gradient of the pipe, completed and accepted.

287-14 Basis of Payment.

287-14.1 Asphalt Permeable Base: Price and payment will be full compensation for

work specified in this Section, including furnishing all labor, materials (including the ATPB material, geosynthetic material , and subdrainage pipe), tools, equipment, and incidentals, necessary to complete the work.

287-14.2 Outlet Pipe: Price and payment will be full compensation for work specified in

this Section, including removal of existing sho ulder pavement, trench excavation, pipe and fittings, standard aprons, galvanized hardware cloth (rodent screens), grouting around and stubbing into existing or proposed drainage structures or ditch pavement; restoration of ditch pavement, sod and other ar eas disturbed by the Contractor, backfill in place, disposal of excess materials and incidentals, necessary to complete the work.

287-14.3 Payment Items: Payment will be made under:

Item No. 287 - 1- Asphalt Treated Permeable Base - per cubic yard. Item No. 446- 71- 1- Edgedrain Outlet Pipe - per foot. FY 2023-24 Return to Table of Contents SECTION 288 CEMENT TREATED PERMEABLE BASE

288-1 Description.

288-1.1 General: Construct Cement Treated Permeable Base and Outlet Pipe as shown

in the Plans and Standard Plans, Index 446-001. Use any one of the types of pipe listed in 288 -2, unless a particular type is specifically required by the Contract Documents. Use only perforated pipe, and do not use open joints.

288-1.2 Concrete Plant and Cement Concrete pavement: Meet the requirements of

Section 346 for plant and equipment, and Section 350 for general construction requirements. Work will be accepted in accordance with the applicable provisions in Section 350.

288-2 Materials.

Meet the following requirements: Coarse Aggregate ................................ ................ Section 901 Portland Cement ................................ .................. Section 921 Water ................................ ................................ ...Section 923 Polyvinyl-Chloride Pipe ................................ ......Section 948 Polyethylene Pipe ................................ ................ Section 948 Geotextile Fabric ................................ ................. Section 985 For Cement Treated Permeable Base, the concrete requirements of Section 346 are modified as follows: Use Type I or II portland cement (no supplementary cementitious materials permitted). Composition: Grade of coarse aggregate (stone) ...................... # 57 or # 67 Maximum Water/Cement ratio* ................................ .....0.40 Minimum cement factor** ................................ ..........9 lb/ft3 Maximum Slump Range ............................... Not Applicable Fine Aggregate ................................ .............................. None Admixtures ................................ ................................ .... None *The Engineer will approve the Water/Cement ratio. **±2 lb/ft3 Do not use materials which contain hardened lumps, crusts, or frozen matter, or are contaminated with dissimilar material.

288-3 Control of Quality.

288-3.1 General: Meet the provisions of this Section and Chapter 9.2 of the Materials

Manual - Concrete Production Facilities Guidelines, which may be view at the following URL: https://www.fdot.gov/programmanagement/Implemented/URLinSp ecs/Section92V2.shtm .

288-3.2 Concrete Design Mix: Submit the proposed design mix prior to production, on

the “Concrete Mix Design” form, for the Engineer’s approval. Use only Cement Treated Permeable Base design mixes having prior approval of the Engineer. Furnish sufficient material of each component when requested by the Engineer, for verification of the proposed mix design by the State Materials Office. Verify the unit weight FY 2023-24 Return to Table of Contents

Source: Florida Standard Specifications for Road and Bridge Construction, 2024 Edition. Pages 255259 of 1,299.