242 After all test results have been review ed for compliance with the specifications, a mixture number will be assigned by the DTE.
213.05 Flowable Backfill Trial Batch 110
a.For Standard Flowable Backfill Mix If one of the four standard flowable backfill mix designs in 213.03(a) is used, a trial batch will not be required. The Contractor may still choose to perform a trial batch in accordance with 213.05(b), if desired.
b.For Contractor - Designed Flowable Backfill Mixes A trial batch shall be produced by the Contractor and will be tested by the Department to verify that the FBMD meets the flowable backfill mix criteria. The Department will verify the classification of the mix as either removable or 120 non-removable from the results of the tria l batch. The flowable backfill shall be batched within the proportioning tolerances of 508.02(b). The Department will determine the test results and provide them to the Contractor. The trial batch shall be of sufficient quantity to allow the Department to perform all required tests from the same batch. The Department will obtain a sample of the fine aggregate and fly ash described in the FBMD. The Department will test the dry flow in accordance with ITM 217 and record the results on the FBMD. 130 If the Contractor requests to change the source of the fine aggregate identified in a previously accepted FBMD the Contractor sh all submit a revised FBMD to the DTE. The Department will obtain a sample of the new fine aggregate and, if applicable, a sample of the fly ash as identified in the previously accepted FBMD. Dry flow will be tested in accordance with IT M 217. If the test result is within ± 2.0 s of the value shown on the previously accepted FBMD, the revised FBMD will be accepted and a new trial batch will not be required. Failure to meet the dry flow test requirement will require the Contractor to submit a new FBMD and perform a new trial batch using the proposed new fine aggregate. 140
213.06 Mixing Equipment The mixing equipment shall be in accord ance with the applicable requirements of
702 or 722. CONSTRUCTION REQUIREMENTS
213.07 Placement The flowable backfill shall not be placed on frozen ground. Flowable backfill shall
be protected from freezing for 72 hr. Flowable backfill shall not be placed into or through standing water unless approved by the Engineer in writing. 150 The diameter of the flowab le backfill spread shall be at least 8 in. at time of 213.05 243 placement. Water may be adjusted from the FBMD to meet the minimum spread requirement if the initial measured spread is between 7 and 8 in. If using mixing equipment in accordance wi th 722, the yield will be checked using the 1/4 cu yd box method as follows: (a) The chute shall be cleaned and the box shall be positioned on a level surface to receive the discharged flowable backfill. 160
b.The mixer shall be operated until the cement or fly ash counter indicates that 1/4 cu yd of flowable backfill has been yielded.
c.The contents of the box will be consolidated and struck off. If the box is not full, the gates shall be adjusted and the procedure shall be repeated until the actual and calculated volumes of flowable backfill agree.
d.Yield will be checked on the first load of each truck and every third 170 load per truck thereafter. Additional yield tests will be required after making any adjustments. The flowable backfill shall be brought up uniformly to the fill line as shown on the plans or as directed. When used as structure backfill, flowable backfill shall be placed uniformly so as not to induce unbalanc ed loading on any part of a structure. The flowable backfill shall not be subjected to load or disturbed by construction activities until a lightweight dynamic cone penetration test has produced a minimum blow count. The minimum blow count shall be as follows: 180 Construction Activities with Vibrator y Compaction after Backfill .. ..............12 Construction Activities without Vibrat ory Compaction after Backfill ............7
213.08 Method of Measurement
Flowable backfill will be measured by the cubic yard of the type specified as computed from the neat line limits shown on the plans. If neat line limits are not shown on the plans, the volume in cubic yards of flowable backfill furnished and placed will be computed from the nominal volume of each batch and a count of the batches. Unused and wasted flowable backfill will be estimated and deducted. Drilled holes 190 will be measured by the number of holes drilled. If removable flowable backfill is approved for use in lieu of non-removable flowable backfill, it will be measured by the cubic yard as non-removable flowable backfill.
213.09 Basis of Payment
The accepted quantities of flowable backfill will be paid for at the contract unit 213.09 244 price per cubic yard for the type specified, furnished and placed. Holes drilled in the pavement will be paid for at the contract unit price per each. 200 If removable flowable backfill is approved for use in lieu of non-removable flowable backfill shown on the plans, it will be paid for as non-removable flowable backfill. Substitutions by the Contractor shall be at no additional cost to the Department. Payment will be made under: Pay Item Pay Unit Symbol 210 Drilled Hole for Flowable Backfill ............................................ EACH Flowable Backfill, Non-Removable .......................................... CYS Flowable Backfill, Removable .................................................. CYS
Source: Indiana Standard Specifications, 2024 Edition. Pages 259–262 of 1,248.