307.05 Mix Design The FDR mix design shall be in accord ance with ITM 595 and comprised of
existing RAP, existing base and subgrade materials, cement, and if necessary, recycling additives. Test Procedure Requirement 7-Day Unconfined Strength ASTM D1633, Method A 350 psi minimum The mix design and all associated testing shall be performed using samples of the existing pavement, base, and subgrade material from the project site representing the reclaiming depth. Sampling, testing, and th e mix design shall be performed by a design laboratory that is AASHTO re:source accred ited for soil, aggregates, and concrete. The sulfate content for the subgrade material shall be less than or equal to 1,000 ppm as determined in accordance with ITM 510. When significant in-place material changes occur, additional mix designs shall be performed to establish representative mixes for the entire job. 90 The Contractor shall obtain all samples required to develop the mix design. One sample per lane mile of planned RBC shall be the minimum sampling frequency for mix design preparation. Mix designs shall be submitted for approval at least five calendar days prior to the JITT and shall include results of all tests performed. If new materials are added, a new mix design, including the updated test results, shall be submitted at least one day prior to implementation. 100 CONSTRUCTION REQUIREMENTS
307.06 Roadway Preparation Snowplowable raised pa vement markers shall be removed in accordance with
808.11(e) prior to FDR operations. Grass and other vegetation shall be re moved from the edge of the existing pavement to prevent contamination of the RBC during milling operations. 110 Grade adjustments of existing structures shall be made in accordance with 720.04 except existing structures shall be lowered prior to FDR operations, properly covered and filled with material compatible with the FDR mix design to maintain traffic. 307.05 285 All areas of soft or yielding subgrade, as shown on the plans, shall be corrected prior to pulverization operations.
307.07 Equipment The equipment shall be capable of pulverizing the existing asphalt pavement, base and subgrade materials. The equipment used for mixing the pulverized materials with 120
cement, water, additives, and corrective aggregate, when required, shall be capable of producing a homogenous and uniformly blended RBC. The equipment used for placement of the RBC shall be capable of placement in accordance with 105.03. The equipment shall consist of the following major components: (a) Spreaders and Distributors Spreaders or distributors used to apply dry powder additives shall be non- pressurized mechanical vane-feed, cyclone or screw type capable of providing a consistent, accurate and uniform distribution of material while mi nimizing dust during 130 construction. Corrective aggregate, when required, may be placed by a mechanical spreader, a conventional paver, or by tailgating with end dump trucks and spread to a uniform thickness with a motor grader.
307.10 Stabilization The cement used to stab ilize the RBC may be dry powder or slurry. The
Contractor shall address the application methods and fugitive dust control procedures 220 in the QCP when dry powder materials are used. The pulverized surface shall be scarified or knifed prior to applying materials in slurry form to prevent runoff or ponding. Any dry additives used shall be spread onto the pulverized surface using a mechanical spreader. The pulv erized material shall be mi xed with the stabilizer and additives, as required by the mix design, to create a homogeneous RBC. The in-place moisture content of the material shall be within -1% to +2% of the design moisture content as determined by the mix design. Cement stabilizing materials shall have an application tolerance determined by 230 adding ±0.5% to the percent total cement content. The cement shall be incorporated into the pulverized material at the initial rate shown in the approved mix design. Sampling and mix design may determine different levels of cement at various portions of the project. The Contractor can request the cement percentage to exceed the upper tolerance provided the mix design requirements are satisfied at the requested percentage. The request will be subject to approval by the Engineer.
307.11 Control Strip and Compaction A minimum 500 ft long control strip shall be constructed on the first day of production to verify the construction process meets the requirements as specified. The control strip shall allow the Contractor to:
307.13 Curing
The planned method and duration of curing for cement stabilized RBC shall be in accordance with the QCP. The specified surface course shall be placed within two weeks of the RBC final cure, but no later than November 1. Before placing the final surfacing, th e cement stabilized RB C shall remain in- place for a minimum of three days. Cement stabilized RBC shall be cured to minimize moisture loss from the surface 320 for a time period that achieves the minimum required 7-day unconfined strength.
307.14 Proofrolling The cement stabilized RBC shall be proo frolled in accordance with 203.26 using
a tandem or tri-axle dump truck loaded to the legal limit. The Engineer will determine the corrective remediation limits for any area that has deflection or rutting greater than 1/2 in. The Contractor shall rework the areas that fail in proofrolling by re-pulverizing and re-stabilizing the RBC in-place at no additional cost or by removing the RBC and 330 stabilizing the subgrade with subgrade treat ment Type IC in accordance with 207. In locations of failing subgrade, the RB C shall be removed and subgrade treatment Type IC shall be placed in accordance with 207. HMA patching, Type B shall be placed in accordance with 304 in place of the RBC.
307.15 Milling
The entire surface of the cement stabilized RBC shall be scarified in accordance with 306.04 in preparation for the overlay. Liquidated damages will not apply. Construction engineering in accordance with 105.08(b) shall be provided. 340
307.16 Underdrain Installation Underdrain installation in accordance with 718, when required, shall begin after
proofrolling has been completed.
307.17 RBC Overlay
The overlay atop the RBC shall be as shown on the plans. The overlay shall be placed after proofrolling has been completed. 307.17 The RBC shall be swept of all loose material and standing water with a rotary 350 power broom in accordance with 409 immedi ately prior to placing the surface. The RBC shall be swept lightly to avoid damage to the RBC. A tack coat shall be required only for the HMA overlay and shall be applied to the RBC, in accordance with 406, immediately following sweeping operations. Monuments shall be reestablished in accordance with 615.10.
307.18 Opening to Traffic Opening to traffic shall occur after suff icient cure time in accordance with 307.13 360
has been applied to the RBC so traffic will not initiate raveling or permanent deformation. All loose particles that ma y develop on the pavement surface shall be removed by a rotary power broom in accordance with 409. After opening to traffic, the surface of th e RBC shall be maintained for the safe movement of traffic. 307.19 Method of Measurement The RBC will be measured by the square yard, complete in place. Cement, used as stabilizing material, will be measured by the ton. Subgrade treatment will be 370 measured in accordance with 207.05. Co rrective aggregate to adjust the RBC gradation will be measured by the ton of material used. HMA patching, Type B will be measured in accordance with 304.06. Milling will be measured in accordance with
306.10 Re-established monuments will be measured in accordance with 615.13.
Removal of snowplowable raised pavement markers will be measured in accordance with 808.12. 307.20 Basis of Payment The RBC will be paid for as full depth r eclamation at the contract unit price per square yard, complete in place. Cement, used as stabilizing material, will be paid for 380 at the contract unit price per ton, complete in place. Subgrade treatment will be paid for in accordance with 207.06. Corrective aggr egate used to adjust the RBC gradation will be paid for at the contract unit price per ton, complete in place. HMA patching, Type B will be paid for in accordance with 304.07, for the thickness shown on the plans. Milling will be paid for in accordance with 306.11. Re-established monuments will be paid for in accordance with 615.14. Removal of snowplowable raised pavement markers will be paid for in accordance with 808.13. Payment will be made under: Pay Item Pay Unit Symbol Corrective Aggregate, FDR ....................................................... TON Full Depth Reclamation ............................................................. SYS Stabilizing Material, Portland Cement ...................................... TON 307.18 The costs of the FDR mix design and QC testing shall be included in the cost of the full depth reclamation. The costs associated with removal of gr ass and vegetation, rubberized crack filler, 400 durable pavement markings, loop wires and other non-pavement materials shall be included in the cost of the full depth reclamation. The costs associated with pulverizing, stabilizing, compacting, curing, and maintenance of the RBC shall be included in the cost of the full depth reclamation. The cost associated with mixing water shall be included in the cost of the full depth reclamation. The cost associated with aggregate, wh en used to supplement material volume, 410 shall be included in the cost of the corrective aggregate pay item. The cost associated with ag gregate, when used to adju st the RBC gradation, shall be included in the cost of th e corrective aggregate pay item. In the locations of failing subgrade, removal of the RBC shall be included in the cost of subgrade treatment.