The cost of placing, compacting, water, aggregate placed outside neat lines as 90 shown on the plans, and necessary incidentals shall be included in the cost of the pay item. Payment will not be made for material placed outside of a 1:1 slope from the planned typical section. Replacement of pavement damaged by the Contractor’s operations shall be at no additional payment.