B
HomeLibrariesCopilotSearchProjectsBookmarks
FeedbackHelp Desk
Libraries
Building Codes
Code LibraryIBC — BuildingIRC — ResidentialIFC — FireIPC — PlumbingIMC — MechanicalIFGC — Fuel GasIECC — EnergyNEC — ElectricalModel Codes
Specifications
CSI SpecificationsDOT SpecsTransit SpecsUSACE
Standards
TransportationRailroadFire SafetyAccessibilityStructural
Tools & References
DiagramsAssembliesProductsCalculatorsChecklistsPermits
PricingLog in
Earthwork (200-299)

265The cost of placing, compacting, water, aggregate placed outside neat lines as 90

IN · 2024 Standard SpecificationsBook pages 55View official source ↗

The cost of placing, compacting, water, aggregate placed outside neat lines as 90 shown on the plans, and necessary incidentals shall be included in the cost of the pay item. Payment will not be made for material placed outside of a 1:1 slope from the planned typical section. Replacement of pavement damaged by the Contractor’s operations shall be at no additional payment.

Source: Indiana Standard Specifications, 2024 Edition. Pages 55 of 1,248.