B
HomeLibrariesCopilotSearchProjectsBookmarks
FeedbackHelp Desk
Libraries
Building Codes
Code LibraryIBC — BuildingIRC — ResidentialIFC — FireIPC — PlumbingIMC — MechanicalIFGC — Fuel GasIECC — EnergyNEC — ElectricalModel Codes
Specifications
CSI SpecificationsDOT SpecsTransit SpecsUSACE
Standards
TransportationRailroadFire SafetyAccessibilityStructural
Tools & References
DiagramsAssembliesProductsCalculatorsChecklistsPermits
PricingLog in
Earthwork (200-299)

275Rubblized PCCP will be paid for at the contract unit price per square yard for

IN · 2024 Standard SpecificationsBook pages 290290View official source ↗

Rubblized PCCP will be paid for at the contract unit price per square yard for rubblized pavement. Payment will be made under: 170 Pay Item Pay Unit Symbol PCC Base, __________ in. ........................................................ SYS thickness PCC Base Patching, __________ in. ......................................... SYS thickness Rubblizing PCCP ...................................................................... SYS Widening with PCC Base, __________ in. ............................... SYS thickness 180 If PCC base is found to be deficient in thickness, price adjustments in accordance with 502.23 will be determined. The cost of excavation, disposal of existing materials, preparation of subgrade, and subbase required for the PCC base widening shall be included in the cost of widening with PCC base. The cost of excavation, disposal of existing materials, preparation of subgrade, and subbase required for PCC base patching shall be included in the cost of PCC base patching. 190 Replacement of pavement damaged by the Contractor’s operations shall be without additional payment. The cost of furnishing all labor, materials, and equipment necessary to rubblize, suppress dust, cut and remove exposed reinforcement, cut and remove joint fillers or similar materials, saw cutting of the pavement, severing existing joints, compacting and maintaining the compacted condition of the rubblized pavement shall be included in the cost of rubblized PCCP. 200 The cost of furnishing, hauling, placing, leveling, and compacting the aggregate to fill depressions in the rubblized PCCP shall be included in the cost of coarse aggregate No. 53 or 73. Furnishing and operating the 16 ft straight edge shall be included in the cost of other pay items within this section.

305.07 276

Source: Indiana Standard Specifications, 2024 Edition. Pages 290290 of 1,248.