that exceed the limit of 219.04 will be included in a change order for materials only and paid for as additional cement for subgrade soil stabilization. Payment for additional cement for subgrade soil stabilization will be made for direct delivered material costs incurred by the Contractor and will not include any other markups. Payment will be made under: Pay Item Pay Unit Symbol 180 Cement Stabilized Subgrade Soil ............................................. SYS The cost of performing mix design, services of a qualified geotechnical consultant, scarification of the soil, spreading and mixing of the cement and soil, compaction of the resultant mixture, shaping the soil, work required due to adjustments of modifier proportioning, work required due to weather conditions, correction of deficient areas, water required for the stabilization process, soil trimming, liquid membrane forming compound, and all operations needed to meet the requirements of this specification shall be included in the cost of the pay item. 190 219.16 263 DIVISION 300 – AGGREGATE PAVEMENT AND BASES
Earthwork (200-299)
262Approved adjustments for cement that exceed the limit of 219.04 will be included
Source: Indiana Standard Specifications, 2024 Edition. Pages 279–279 of 1,248.