Minnesota Department of Transportation (MnDOT) · 2025 Standard Specifications for Construction
Section 2021 — Mobilization
Minnesota 2025 Standard Specifications for Construction, Section 2021. Full text, cross-references and related pay items on BuildSpec.
2021 MOBILIZATION 2021.1 DESCRIPTION This Work consists of preparatory Work and operations, including the movement of personnel, Equipment, supplies, and Incidentals to the Project to establish Contractor’s offices and buildings or other facilities. This Work may also include obtaining bonds, permits, and demobilizing. 2021.2 MATERIALS — BLANK 2021.3 CONSTRUCTION REQUIREMENTS — BLANK 2021.4 METHOD OF MEASUREMENT — BLANK 2021.5 BASIS OF PAYMENT The Department will provide partial payments for mobilization in accordance with the following table: Table 2021.5-1 Mobilization Partial Payments When…
The rest of Section 2021 — Mobilization is for members
You're reading the opening of Section 2021 — Mobilization. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Complete section text with subsections and tables
- Search across every state DOT standard specification
- Prior editions and related products
- Ask Copilot about this section, with citations