863PREFORMED THERMOPLASTIC PAVEMENT MARKINGS

DE · 2026 Standard Specifications✓ Full text on BuildSpecBook pages 567–0 Save this section

Ask about Section 863

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

863.1Description.

This work consists of providing and installing preformed thermoplastic pavement markings.

863.2Materials.

A.Preformed Thermoplastic Pavement Marking Section 1071.4

863.3Construction.

863.3.1 Submittals.

A.Submit a schedule of operations for the engineer’s approval before starting any pavement

marking work. Submit the schedule 2-weeks before the striping application.

B.For decorative pavement systems, submit a 24-inch x 36-inch color sample and pattern to the

engineer for approval prior to installation. 863.3.2 Pavement marking layout.

A.Perform pavement marking layout as needed to ensure accurate placement.

863.3.3 Application.

A.Clean pavement surface of oil, surface treatment, curing compound, dirt, grease, concrete

laitance, and other contaminants to a width at least 4-inches wider than the marking to be applied.

B.Ensure ambient and surface temperatures are at least 40 degrees F and rising, and in accordance

with the manufacturer's recommendations. If the manufacturer recommended temperature requirement for the pavement marking material application deviates from these specifications, the manufacturer's recommendations shall hold priority. Confirm the atmospheric and pavement surface conditions with the engineer prior to starting work.

C.Apply pavement marking material in accordance with the contract and the manufacturer’s

recommendations. Apply in accordance with the following provisions unless approved otherwise by the engineer.

1.Protect nearby joint filler, sealant material, and pavement marking material as directed by the

engineer before preheating the surface.

2.Uniformly apply surface glass beads as recommended by the manufacturer immediately after

application of the markings.

3.All necessary markings shall be installed before the end of the workday. Install the markings as

soon as possible after weather interrupts the work.

D.Protect the pavement markings for an adequate time to allow the markings to dry and become

track-free using a method approved by the engineer. Follow the manufacturer’s recommendations for track-free time.

E.Remove existing pavement markings that conflict with new or altered traffic patterns as well as

any layout markings installed that detract from the overall appearance or function of pavement markings in accordance with Section 868.

F.Request engineer to perform retroreflectivity testing once pavement marking at the location is

complete. 863.3.4 Evaluation and Correction.

A.The engineer will evaluate the pavement markings for defects after an observation period of 180-

days from the date the pavement is opened to traffic. Time charges will not be assessed during the observation period provided all other work is complete. The engineer may waive a portion or all of the 180-day observation period.

B.The engineer will inform the contractor of pavement markings that have failed and that require

corrective action.

C.Correct pavement marking defects as directed by the engineer within 30-days of receiving written

notification. Examples of pavement marking defects for preformed thermoplastic pavement marking material include:

1.Insufficient retroreflectivty, glass bead coverage or bead retention.
2.Damage caused by a vehicle tracking over uncured pavement marking material.
3.Discolored marking when compared visually with color chips.
4.Insufficient pavement marking thickness.
5.Less than 90 percent of material remaining for each individual symbol, transverse pavement

marking, or legends.

6.Pavement marking cracking, bleeding, or staining.

863.4Method of Measurement.

A.The Department will measure symbols and transverse pavement markings as the number of

square feet placed and accepted. Symbols and transverse pavement markings will be measured in accordance with the following square foot values:

1.Straight arrow symbol 12.50 ft²
2.Left and right arrow symbol 15.50 ft²
3.Combination arrow symbol 20.00 ft²
4."ONLY" legend 23.00 ft²
5."SCHOOL" legend 35.00 ft²
6."STOP" legend 23.50 ft²
7.“AHEAD” legend 40.00 ft²
8.Transverse line, 8-inch 0.66 ft² / linear foot
9.Transverse line, 12-inch 1.00 ft² / linear foot
10.Transverse line, 16-inch 1.33 ft² / linear foot
11.Transverse line, 24-inch 2.00 ft² / linear foot
12."RXR" railroad crossing symbol 69.00 ft²
13.Left and right 18-foot lane reduction arrow symbol 40.90 ft²
B.The Department will measure bike, shared lane, pedestrian, and accessible parking space marking

as the number of square feet placed and accepted. Symbol and legend dimensions per the DE MUTCD as described:

1.Bike symbol helmeted bicyclist symbol with a 2' x 6' arrow symbol.
2.Pedestrian symbol walking pedestrian 4' x 8' with a 2’ x 6’ arrow symbol.
3.Accessible parking space marking 40" x 40".
4.Shared lane marking helmeted bicyclist symbol with 5" W chevrons.

863.5Basis of Payment.

A.The Department will pay the quantity of symbols and transverse pavement markings at the

contract unit price per square foot. Price and payment constitute full compensation for:

1.Performing pavement marking layout work;
2.providing and placing all materials;
3.preparing pavement, including sandblasting, sweeping, and cleaning or removal of curing

compound on PCC pavement;

4.protecting uncured pavement markings from vehicle damage; and
5.repairing defective work as directed by the Department.
B.The Department will pay the quantity of bike, pedestrian, and accessible parking space symbols at

the contract unit price per each. Price and payment constitute full compensation for:

1.Performing pavement marking layout work;
2.providing and placing all materials;
3.preparing pavement, including sandblasting, sweeping, and cleaning or removal of curing

compound on PCC pavement;

4.protecting uncured pavement markings from vehicle damage; and
5.repairing defective work as directed by the Department.

ITEM DESCRIPTION UNIT 863001 PREFORMED RETROREFLECTIVE MARKINGS, ALKYD-THERMOPLASTIC, ACCESSIBLE PARKING SPACE MARKING EA 863002 PREFORMED RETROREFLECTIVE MARKINGS, ALKYD-THERMOPLASTIC, BIKE SYMBOL EA 863003 PREFORMED RETROREFLECTIVE MARKINGS, ALKYD-THERMOPLASTIC, PEDESTRIAN SYMBOL EA

863004 PREFORMED RETROREFLECTIVE MARKINGS, ALKYD-THERMOPLASTIC, SHARED LANE SYMBOL SF 863005 PREFORMED RETROREFLECTIVE MARKINGS, ALKYD-THERMOPLASTIC, OTHER SYMBOL/LEGEND SF 863006 PREFORMED RETROREFLECTIVE MARKINGS, ALKYD-THERMOPLASTIC, DECORATIVE PAVEMENT SYSTEM SF

Referenced in this section

Get an email when 863 changes

Delaware revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Delaware Standard Specifications for Road and Bridge Construction, 2026 Edition. Pages 567–0 of 786. View official source ↗

Ask about this section

Scoped to Delaware Standard Specifications for Road & Bridge Construction, Section 863 — PREFORMED THERMOPLASTIC PAVEMENT MARKINGS. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.