800-128At the end of each day’s operations, sh ape the last level of backfill to permit runoff of rainwater away from

KS · 2015 Standard SpecificationsBook pages 619625View official source ↗

854 – LANDSCAPE RETAINING WALL SYSTEM each day’s operations, sh ape the last level of backfill to permit runoff of rainwater away from the wall face. Remove and replace any wall materials that become damaged during backfill placement at the Contractor's expense. Trim excess geogrid protru ding from the face of the wall for MBWs to match the modular block’s face. Seal any geogrid permanently exposed fr om exposure to the elements with th e use of epoxy grout, grout or other methods as approved by the Engineer.

854.4MEASUREMENT AND PAYMENT

The Engineer will measure Landscape Retaining Wall by the square foot. The Engineer will use the neat lines shown in the Contract Documents to compute the quantities. Payment for "Landscape Retaining Wall" at the contract unit price is full compensation for the specified work.

855 – SOLID INTERLOCKING PAVING UNITS (PAVING BRICKS)

800-129SECTION 855

SOLID INTERLOCKING PAVING UNITS (PAVING BRICKS)

855.1DESCRIPTION

Install solid interlocking paving units (paving bricks) at the locations designated in the Contract Documents.

B I D I T E M U N I T S Paving Brick Square Yard

855.2MATERIALS

Provide paving bricks that comply with DIVISION 300 .

855.3CONSTRUCTION REQUIREMENTS

Unless otherwise shown in the Contract Documents, construct the base to the lines and grades shown in the Contract Documents. If edge restraints are specified, install the e dging as recommended by the manufacturer. Provide the Engineer with a copy of the manufacturer’s recommendations for installation. Unless otherwise shown in the Contract Documents, spread an uncompacted sand bedding course over the base. Level the sand bedding course approximately one inch th ick or as specified in the Contract Documents. Do not disturb the sand bedding course after it is leveled to the desired elevation. If shown in the Contract Documents, remove and reset paving bricks in good condition salvaged from the project or provided by the owner. If no bricks are provided or salvaged, provide new paving bricks. When specified lay the paving bricks in the pattern shown in the Contract Documents. Unless otherwise shown in the Contract Documents, lay the paving bricks with joints approximately ⅛ inch wide. If necessary at the edge of the paved surface, cut the paving bricks to fit. Cut paving bricks must have a clean, straight edge. Do not use bricks cut to less than ⅓ of their original dimension. If the paving bricks are set on a sand bedding course, use 2 or 3 passes with a vibrating compactor to vibrate the paving bricks into the sand bedding to their final elevation. Th e surface of paving bricks adjacent to drainage inlets, concrete collars, or channels must be ⅛ to ¼ inch above the adjacent structure. Do not vibrate the paving bricks within 3 feet of an un restrained edge. Spread joint sand over the compacted paving brick surfaces, and allow the sand to dry. Use a vibrating compactor to vibrate the dry sand into the joints and compact the sand joints. Fill and compact the joints the same day the paving bricks are laid. Do not fill the joints and vibrate the paving bricks within 3 feet of an unrestrained edge. Protect the uncompacted edge of the laying face and the sand bedding course from the weather. Correct deviations after the final rolling in excess of ¼ inch using a 10-foot straightedge unless the contour of the area exceeds this tolerance. Advance the straight edge along the surface, para llel and transverse to the centerline of the pavement, in successive stages of not more than half the length of the straightedge.

855.4MEASUREMENT AND PAYMENT

The Engineer will measure the paving brick by the squa re yard. The Engineer will measure to the neat lines shown in the Contract Documents. Payment for "Paving Brick" at the contract unit price is full compensation for the specified work. 856 – PRECAST PARKING BLOCK

800-130SECTION 856

PRECAST CONCRETE PARKING BLOCK

856.1DESCRIPTION

Provide and install precast concrete parking blocks of the type and size as shown in the Contract Documents.

B I D I T E M U N I T S Concrete Parking Block Each

856.2MATERIALS

Use commercially available precast concrete parking bloc ks complying with the details shown in the Contract Documents. The Engineer will accept the parking blocks on the basis of compliance with dimensional requirements, condition, and visual inspection at the point of usage. Reinforcing steel bars used to secure the parking blocks to the parking lo t will be accepted by the Engineer on the basis of compliance with dimensional requirements, co ndition, and visual inspection at the point of usage.

856.3CONSTRUCTION REQUIREMENTS

Install the precast concrete parking bloc ks as shown in the Contract Documents.

856.4MEASUREMENT AND PAYMENT

The Engineer will measure the precast c oncrete parking blocks by the unit. Payment for "Precast Concrete Parking Blocks" at the c ontract unit price is full co mpensation for the specified work.

857 – PLUGGING WELLS

800-131SECTION 857

PLUGGING WELLS

857.1DESCRIPTION

Plug the types of wells as shown in the Contract Documents.

B I D I T E M S U N I T S P l u g g i n g ( * ) W e l l s E a c h *Type: Oil, Gas, and Input W a t e r

857.2MATERIALS

Provide grouts for plugging wells that comply with these requirements:

(1)Neat cement grout: a mixture of 94 pounds (1 sack) of portland cement and 5 to 6 gallons of water.
(2)Cement grout: a mixture of 94 pounds (1 sack) of portland cement, an equal quantity of fine sand (by

weight), and 5 to 6 gallons of water.

(3)Bentonite clay grout: a mixture of a comm ercial sodium bentonite clay and water.

 Use high solids sodium bentonite clay. Mix the grout according to the manufacturer’s recommendations such that its weight is not less than 9.4 pounds per gallon of mixture. Use agents to increase the weight of the mixture accordi ng to the manufacturer’s recommendations.  Use sodium bentonite pellets or tablets, or granular sodium bentonite that complies with K.A.R. 28-30- 2(k)(3).  Do not use sodium bentonite products that contain low solids.  Or other products that meet or exceed the K.A.R. 28-30-7 requirements.

857.3CONSTRUCTION REQUIREMENTS

a.Plugging Oil, Gas and Input Wells. Before starting work, notify the Kansas Corporation Commission

KCC), Wichita, Kansas of the intended well plugging. Th e KCC will advise KDOT or the Contractor of one or more local representatives to contact. The Contractor/subcontractor performing the work shall be licensed by the KCC to plug oil, gas and input wells. Plug the well(s) according to K. A.R. 82-3-113 (Intent to Plug), K. A.R. 82-3-114 (Plugging Methods and Procedure) and any other regulatory requirements applicable to the plugging of oil, gas or input wells. Perform the plugging procedure under the supervision of the KCC. The final plugging record shall be accepted and approved in writing by the KCC.

b.Plugging Water Wells. Before plugging any water well, notify and comply with all regulations set by

the Kansas Department of Health and Environment (KDHE). The Contractor/subcontractor plugging the water well(s) shall be a KDHE Licensed Wate r Well Contractor. Plug all wells according to K.A.R. 28-30-7 and any other applicable regulatory requirements. Perform all plugging procedures under the supervision of KDHE. The final plugging record (Form WWC-5P) shall be a ccepted and approved in writing by KDHE.

857.4MEASUREMENT AND PAYMENT

The Engineer will measure each plugged well. Payment for "Plugging Wells" at the contract unit prices is full compensation for the specified work. 858 – BRIDGE APPROACH SLAB FOOTING

800-132SECTION 858

BRIDGE APPROACH SLAB FOOTING

858.1DESCRIPTION

Construct bridge approach slab footings at the locations designated in the Contract Documents.

B I D I T E M U N I T S Bridge Approach Slab Footing Cubic Yard

858.2MATERIALS

Provide materials that comply w ith the applicable requirements. Concrete and Grout ............................................................................................... SECTIONS 401 & 402 Aggregates for Concre te Not On Grade ................................................................ SECTION 1102 Reinforcin g Steel .................................................................................................... DIVISION 1600 Concrete Curing Materials ..................................................................................... DIVISION 1400

858.3CONSTRUCTION REQUIREMENTS

Excavate to the neat lines shown in the Contract Documents. Place rein forcing steel at the locations shown in the Contract Documents. Use a sufficient number of approved metal bar chairs and secure to prevent displacement during concrete placement. Place and cure the concrete according to the Contract Documents and according to DIVISION 700 .

858.4MEASUREMENT AND PAYMENT

The Engineer will measure the bridge approach slab footing by the cubic yard to the neat lines shown in the Contract Documents. Payment for "Bridge Approach Slab Footing" at the contract unit price is full compensation for the specified work.

859 – INTELLIGENT TRAN SPORTATION SYSTEM (ITS)

800-133SECTION 859

INTELLIGENT TRANSPORTATION SYSTEM (ITS)

859.1DESCRIPTION

Install Intelligent Transportation System (ITS) in cluding KDOT supplied materials as shown in the Contract Documents.

BID ITEM UNITS Intelligent Transportation System Lump Sum

859.2MATERIALS

a.Provide the specified materials that co mply with the materials’ divisions ( SECTION 1000 – 2500 ).

For concrete foundations, use Grade 3.0 concrete that complies with SECTIONS 401, 402 and 1102 , and steel reinforcement that complies with DIVISION 1600 , unless shown otherwise in the Contract Documents.

b.ITS. Provide and install all materials necessary for th e complete and satisfactory operation of the ITS

whether specifically mentioned or not. Provide material that is new, the best standard product of a manufacturer regularly engaged in the production of this type of material, the manufacturer’s latest approved design and of best quality and workmanship.

859.3CONSTRUCTION REQUIREMENTS

a.Codes and Regulations. Perform all ITS work according to:

 National Electric Code.  National Electric Safety Code.  Rural Utility Service (RUS).  Illumination Engineers Society (IES).  Standards of the American Society for Testing and Materials (ASTM).  American Association of State Highway and Transportation Officials (AASHTO).  Regulations of the National Board of Fire Underwriters.  Local ordinances.  KDOT Utility Accommodation Policy  Details in the Contract Documents.

Whenever reference is made to any of the standards mentioned, the reference shall be considered to mean the code, ordinance, or standard that is in effect at the time of the bid advertisement.

b.General. Provide and install all incidental parts not shown in the Contract Documents which are

necessary to complete the ITS system or modify exis ting systems as shown in the Contract Documents. All utility hookups and utility tr ansformers are subsidiary.

c.Removals and Excavations. Perform removals of existing structures and excavations to minimize

damage to existing structures and right-of-way. Limit the excavation for the conduits, foundations and other appliances to that necessary for the installation of the materials. Do not excavate until immediately before installing the materials. Place excavated material where the least damage and ob struction to vehicles and pedestrian traffic will occur. Do not impede surface drainage. Assume ownership and dispose of removed concrete and soil off of the right of way. At the end of each day’s work and at all times when construction operations are suspended, remove all equipment and other obstructions from the portion of the roadway open for use by public traffic.

859 – INTELLIGENT TRAN SPORTATION SYSTEM (ITS)

800-134 d. Backfill. Place the backfill material in uniform layers (maximum 6 inches compacted) evenly on all sides of the structure. Compact the backfill using pneumatic tampers, vibratory compactors or other equipment approved by the Engineer. Compact the backfill to comply with the Contract Documents. If backfill requirements are not specified, compact each layer until no further consolidation is observed. Remove surplus excavated material, including concrete and soil from the project and dispose on sites approved by the Engineer or assume ownership and dispose of off of the right of way. Reseed and mulch the areas disturbed by the excavations. Hand seeding methods may be used. Do not use cinders, broken concrete, broken rock or other hard or undesirable material for backfilling.

e.Replacing Damaged Improvements. Replace all sidewalks, curbs, gutters, pavements and other

improvements removed or damaged during installations of the Intelligent Transpor tation System. Replace or reconstruct the removed or damaged improvements with the same type and quality of materials originally used. If part of an existing slab of concrete pa vement or square of sidewalk is remove d or damaged, replace the entire slab or square. Replace damaged improvements as soon as practicable. Completely repair the ditch and replace the disturbed aggregate ditch liner if co nstruction activities disturb any aggregate ditch. Do not let rocks or aggregate fall into the trench prior to backfill.

f.Foundations.
(1)Concrete Foundations. Form the foundations and place the concrete according to DIVISION 700 .

Hold conduit ends and anchor bolts securely in the proper positio n when the concrete is placed. Cure the concrete foundations with wet burlap or polyethylene for a period of 72 hours. Prevent concrete temperatures from falling below 32ºF. Do not attach poles or cabinets until the concrete has cured for 14 days. Construct foundations in one pour. If a foundation cannot be constructed as shown in th e Contract Documents because of an obstruction, Contractor will submit to the Engineer for approval, an alternate method to construct the foundation. The top of the pole foundations shall be 2 inches abov e the finished grade if lo cated in a non-paved area. Concrete work aprons around equipment cabinet foundations shall be 1 inch above the finished grade if located in a non-paved area.

(2)Screw-In Foundation Anchors. If screw-in foundations are required in the Contract Documents, pre--

drilling holes for screw-in foundation anchors is prohibited. As the foundation anchors are screwed into the ground, make sure they are plumb. The pole base of the screw-in foundation anchor shall be level when the installation is complete. Use the connectors to make minor leveling adjustments on poles with breakaway connectors. Use galvanized or cadmium plated shims or washers (maximum thickness ¼ inch) to make minor leveling adjustments on other types of poles. Only 1 shim or washer is allowed on any 1 anchor bolt, with a maximum of 2 shims or washers on any pole.

(3)Removal of Existing Foundations. Remove the designated existing foundations to the depth shown in

the Contract Documents. Backfill the resulting holes according to DIVISION 200 . Dispose of the removed foundations and anchor bolts.

g.Conduit. Install electric conduit as shown in the Contract Documents and subsection 814.3g .
h.Electric Service Boxes. Install electric service boxes as shown in the Contract Documents.
i.Pull Boxes. Install pull boxes as shown in the Contract Documents.
j.Expansion Fittings. If expansion fittings are re quired in the Contract Documents, install expansion

fittings as shown in the Contract Documents, where condu it crosses an expansion joint in the structure. Provide each expansion fitting with a bonding jumper of No. 6 A.W.G. copper wire or equal.

k.Wiring. Neatly arrange and lace up wiring within juncti on boxes, transformer ba ses and on standards,

etc. Do not splice cable in conduit or outside of pull boxes, splice boxes or standards, unless shown in the Contract Documents. When not fastened to existing structure or carried through conduit, lay conductor cable to the depth shown in the Contract Documents.

Source: Kansas Standard Specifications for State Road and Bridge Construction, 2015 Edition. Pages 619625 of 978.