1079.03 Procedures
1.Slag cement shall be protect ed, stored, handled, and sampled in the same manner as specified for Po rtland cement in Sections 1002 and 1004 and the Department’s Materials Sampling Guide. 2.Each shipment of slag cement s ent to the project or ready mix plant shall be accompanied with a Certificat e of Compliance from the supplier or manufacturing plant. The certificate mu st include the following information:
a.Name of the supplier or manufacture. b. Source of the slag cement. c. Consignee and desti nation of the shipment.
d.Project number to be used on, if available, and date shipped. e. Railroad car number or truck identification number.
f.Weight of the shipment.
g.Certified test number repres enting the material being shipped.
h.An unrepeated order number or other identification number so that each shipment is separately identified.
3.The following signed certificati on statement, or similar wording, must also be included on the form: “This is to certify that this shipment of slag cement meets the specification requirements of the Nebraska Departmen t of Transportation for slag cement, Grade 100 or 120”. Signed ____________________________________________ For _______________________________________________ (Supplier)
4.Two copies of the Certificate or Compliance shall be sent with the shipment to the ready mix plant or project. The concrete producer will retain one copy of the Certificate of Compli ance for their records and one will be collected by the Engineer if necessary.
5.Slag cement may be used as soon as it is received; provided it is accompanied by the proper Certificate of Compliance and the results of previous tests indicate a satisfactory product.
1079.04 Slag Cement for Use in Concrete and Mortars
- 972 - b. Slag cement may be added to the Department’s Approved Products List if it is in conformance with the Department ’s Acceptance Policy for slag cement.
2.a. Should any sample indicate noncompliance with the specifications, use of material from that source based on certification only may be withheld. It will be necessary that the slag cement be held in special silos or bins at the plant or some facility under control of the company furnishing the slag cement until such time that test results show compliance.
b.When it can be shown that continuing production from that plant has a high assurance of meeting specifications, material acceptance may once again be based on certification only.
3.a. If tests made on field samples taken by the Department fail to meet any of the specific ation requirements, all shipments from the supplier will be held until tests have been completed by the Department and approval for use is issued.
b.This procedure will be conti nued until it can reasonably be assured that the slag cement from the supplier will again continue to meet contract requirements. - 973 - SECTION 1080 -- WARM MIX ASPHALT
Source: Nebraska Standard Specifications for Highway Construction, 2017 Edition. Pages 1005–1006 of 1,048.
View official source ↗