B
HomeLibrariesCopilotSearchProjectsBookmarks
FeedbackHelp Desk
Libraries
Building Codes
Code LibraryIBC — BuildingIRC — ResidentialIFC — FireIPC — PlumbingIMC — MechanicalIFGC — Fuel GasIECC — EnergyNEC — ElectricalModel Codes
Specifications
CSI SpecificationsDOT SpecsTransit SpecsUSACE
Standards
TransportationRailroadFire SafetyAccessibilityStructural
Tools & References
DiagramsAssembliesProductsCalculatorsChecklistsPermits
PricingLog in
Structures (1000-1099)

1041SCARIFICATION

PA · 2026 Standard SpecificationsBook pages 11111115View official source ↗

1044. 3(a) 1044. 3(d) occupational and environmental health and safety rules and regulations. When applying or repairing coating damage, protect pedestrians, vehicles, and other traffic, upon or under the structure; and surrounding property surfaces, buildings, and grounds. Protect against damage or disfigurement from surface preparation media and spatters, splashes, overspray, and smirches of coating or material . As necessary, furnish adequate canvas or other suitable containments materials, for protection. Remove coating dropped on surfaces not designated for coating . Remove debris from cleaning operations, empty coating containers, and other refuse. Use scaffolding and rigging conforming to OSHA regulations and providing safe and ready access to work areas for inspection purposes.

2.Form Oils, Release Agents , and Curing Compounds . Ensure compatibility with coating manufacturer.
3.Pollution Controls. Prevent environmental pollution including stream and air pollution caused by

coating (spray and/or chips), dust, or other harmful materials. Provide documentation to ensure all work be in conformance with Pennsylvania Code -Title 25 Environmental Protection Chapters 121 -145 “Air Resources”. Comply with Co unty and local ordinances before the start of work. All DEP permits and notifications, for fieldwork, are required before any in -stream work that may be necessary. Adhere to a ll Special Provisions as required .

4.Coating Certifications. Provide a dated certification Form CS -4171 from the manufacturer stating

that each batch of the coating system meets specifications . Include in the certification the product name for each coat of the supplied system and the production lot number of the certified batch.

5.Technical Representation. Furnish the services of a Technical Coatings Representative (Technical

Representative) from the coatings manufacturer at the beginning of operations and when required by the Department .

(b)Test Panel. Before proceeding with production coating operations and the pre -application meeting,

prepare a 2 -foot by 2-foot test panel that is representative of the concrete surface with the specified coating material(s). Prepare the panel using the same cleaning, surface preparation , and application techniques that will be utilized during production. Submit the test panel to the Representative for initial color acceptance.

(c)Pre -Application Meeting. Before proceeding with production coating operations conduct a pre -

application meeting with the Structural Materials Engineer , the Representative , and/or any other applicable representatives. Determine , during this meeting, the maximum repair limits for repairing un

Source: Pennsylvania Department of Transportation Specifications, 2026 Edition. Pages 11111115 of 1,522.