1008. 3(d) 1008. 4 spliced by the manufacturer in the shop/factory and are watertight. If necessary to stretch the seal during installation, do not exceed 5% elongation. If the seal is damaged during installation, remove and install a new seal. Seal or cap the ends of the seal. After installation, flood seal with water and inspect for leaks and/or damage. Repair any leaks or damage as directed and according to the manufacturer’s recommendations.
1008.4MEASUREMENT AND PAYMENT —Linear Foot
Measured out -to-out along centerline of seal, including horizontal, vertical, inclined, or curved portions.
1012. 1 1012.4
1012.1DESCRIPTION —This work is the construction of a pedestrian railing.
1012.2MATERIAL —Before fabrication, submit shop drawings of the railing for review and acceptance .
• Aluminum -Alloy Casting . ASTM B26/B26M , Alloy SG70A -T6 or ASTM B108 , Alloy SG70A -T6.
• Aluminum -Alloy Bolts . ASTM B211/B211M , Alloy 2024 -T4.
• Aluminum -Alloy Nuts . ASTM B211/B211M , Alloy 6061 -T6.
• Nylon Washers . Section 1103.11( j)2
• Bolt Heads . Regular hexagon, ANSI B18.2.3.5M (ANSI B18.2).
• Nuts. Finished hexagon, ANSI B18.2.4.6M (ANSI B18.2) . Threads, Class 6, 6g, or 6H (Threads, Class 2, 2A, or 2B).
• Aluminum Alloy Balusters . ASTM B221/B221M, Alloy 6061 -T4.
• Post assembly and panel to post aluminum washers . ASTM B209, Alloy 2024 -T3.
• Cast Aluminum Post Base . ASTM B26/B26M, Alloy SG70A -T6 or ASTM B108/B108M, Alloy SG70A -T6.
• Other Aluminum Alloys . Section 1013.2(a)
Certify as specified in Section 106.03(b)3.
1012.3CONSTRUCTION —As shown on the Standard Drawings and as follows:
stone masonry, or concrete with caulking compound. After erection and alignment, seal openings between metal surfaces and concrete with caulking compound. After the concreting and other operations have been completed, thoroughly clean the railing. Remove accumulations of oil, grease, dirt, or foreign materials, using a solvent cleaner.
Make cuts true, smooth, and free from burrs or ragged edges. Fillet -drill all re -entrant cuts, before cutting. Do not flame cut. To facilitate bending, Contractor may heat material to a temperature of 400F for a period not exceeding 15 minutes. Drill rivet and bolt holes, or subpunch 3/16 inc