833.05BASIS OF PAYMENT. The accepted quantities of "Granite Identification Tablets" of the

RI · 2024 Standard SpecificationsBook pages 513513View official source ↗

8−179as listed in the Proposal. The prices so-stated constitute full and complete compensation for all labor, materials, tools, equipment, and all incidentals required to finish the work, complete and accepted by the Engineer. SECTION 834 GRANITE CURB FOR BRIDGES

834.01 DESCRIPTION . This work consists of providing straight or circular granite curbing at the

locations indicated on the Plans or as directed by the Engineer, all in accordance with these Specifications. The two basic types of curbing are described as follows:

a.Vertical Face Granite Curbing.
b.Slope Face Granite Curbing.

834.02 MATERIALS . Granite curb for bridges shall conform to the requirements of Subsection

M.09.05 of these Specifications. 834.03 CONSTRUCTION METHODS . The curb shall be set accurately to line and grade in a full mortar bed and with full mortar end joints before concrete in back of curb is placed. Anchors shall be grouted into curb stones as they are being set. Care should be taken that all spaces under stones and at joints are completely filled. If indicated on Plans, joints between ends of individual stones shall be raked to dimensions shown on the Plans and sealed with the specified type of joint sealer. Otherwise, joints shall be carefully filled with cement mortar and neatly pointed on top and face. After pointing, curb stones shall be cleaned of all excess mortar to the satisfaction of the Engineer. When placing concrete behind the curb stones, care should be taken to avoid disturbing line and grade of the stones.

834.04 METHOD OF MEASUREMENT. "Vertical Face Granite Curb Straight,” "Vertical Face

Granite Curb Circular,” "Slope Face Granite Curb Straight,” and "Slope Face Granite Curb Circular" will be measured (along the front arris of the curb) by the number of linear feet of such curbing actually installed in accordance with the Plans and/or as directed by the Engineer.

834.05 BASIS OF PAYMENT . The accepted quantities of "Vertical Face Granite Curb Straight,”

"Vertical Face Granite Curb Circular,” "Slope Face Granite Curb Straight,” and "Slope Face Granite Curb Circular" will be paid for at their respective contract unit prices per linear foot as listed in the Proposal. The prices so-stated constitute full and complete compensation for all labor, materials and equipment, and all incidentals required to finish the work, complete and accepted by the

Source: Rhode Island Standard Specifications (Bluebook), 2024 Edition. Pages 513513 of 826.