935.03CONSTRUCTION METHODS

RI · 2024 Standard SpecificationsBook pages 609610View official source ↗

9−77 All level runs, traverses, or GPS control su rveys, shall start and end from known control. Complete all control surveys in accordance with “Procedural and Technical Standards for the Practice of Land Surveying in the State of Rhode Island and Providence Plantations”.

934.04 METHOD OF MEASUREMENT. The field control and construction layout work is deemed

incidental to the contract and will not be measur ed for payment. The incident al survey and survey- related work shall include, but not be limited to, all on-site field work as well as on-site and off-site office work such as calculations, sketches, drawings, tabulations, correspondence, research and any other tasks required to complete the work to the satisfaction of the Engineer. Re-work, including re-staking, performed for any and all reasons, is deemed incidental and will not be measured for payment.

a.Measurement for Extra Work. Survey work performed outside the scope of the original contract at the direction of the Engineer will be deemed Extra Work, and will be documented and paid for on a Force Account basis as set forth in Subsection 934.05.

934.05 BASIS OF PAYMENT. The field control and construction layout work will not be paid for

separately, but shall be included in the bid for the items of work to which the layout is incidental, including all labor, materials and equipment, transportation of crews, surveying supplies and all incidentals required to finish the work, complete and accepted by the Engineer.

a.Payment for Extra Work. When the Engineer determines that extra construction surveying beyond the scope of the original contract is required, such work will be paid for on a Force Account basis as set forth in Subsection 109.04, Differing Site Conditions, Changes, Extra Work and Force Account Work ; Para. a (4) of these Specifications. SECTION 935 REMOVING BITUMINOUS PAVEMENT BY MICRO-MILLING

935.01 DESCRIPTION. This work consists of the removal of bituminous material using micro-

milling to a depth specified on the Plans or as dire cted by the Engineer, all in accordance with these Specifications.

935.02 MATERIALS. Not applicable.

935.03 Construction Methods.

935.03.1 Equipment. The milling equipment for removing the bituminous pavement shall be

designed specifically for grinding asphalt surfaces to close tolerances and shall be operated at a rate that will avoid tearing and gouging of the pavement surface. The equipment shall be capable of accurately establishing profile grades and cross slopes, and shall have a positive means for preventing any dust resulting from the operation from escaping into the air. An averaging ski not less than 25 feet in length shall be utilized with the pavement removal equipment on all limited-access highways and on other types of highways w hen indicated in the Contract Documents. 9−78 The equipment furnished by the Contractor shall be in good repair and shall be maintained so as to produce a clean cut to the pavement at all times.

935.03.2 Control Strip. The Contractor shall grind a control strip at least 500 feet long with

uniformly textured surface and cross section. The milled pavement surface shall have a transverse pattern 0.3 inches or less between the centers of each strike area. The macrotexture shall be 1/16 inches or less as measured using ASTM E965.

935.03.3 Pavement Grinding. Upon the approval of the Control Strip by the Engineer, all areas

designated for micro-milling shall be ground using the identical procedures , settings and speed, and shall conform in all respects to the requirements for the control strip. No asphalt cuttings shall remain on the project at the end of the workday. Asphalt cuttings shall be removed and legally disposed of by the Contractor. Care shall be exercised in cold planing adj acent to roadway joints, roadway appurtenances and face of curbing.

935.04 Method of Measurement . “Removing Bituminous Pavement by Micro-Milling” will be

measured by the number of square yards of said pavement actually removed in accordance with the Plans and/or as directed by the Engineer.

935.05 Basis of Payment – The accepted quantity of “Removing Bituminous Pavement by Micro-

Milling” will be paid for at the contract unit price per square yard as listed in the Proposal. The price so-stated constitutes full and complete compensation for all labor, materials, equipment, disposal and all incidentals required to finish the work, complete and accepted by the Engineer. SECTION 936 MOBILIZATION AND DEMOBILIZATION

936.01 DESCRIPTION. 936.01.1 Mobilization consists of those efforts necessary for the movement of the Contractor's

personnel and equipment to the project site, the establishment of all the Contractor's field offices, buildings and other facilities required for the performance of the Contract, and all other incurred costs for work or operations required to be performed prior to the actual commencement of work on the Proposal items in the Contract.

936.01.2 Demobilization consists of removal of all materials, equipment, temporary structures and

all other facilities of a temporary nature from the project site at the conclusion of the project, and restoration of the project site, including those ar eas used for storage of equipment, materials or the placement of temporary facilities.

936.02 MATERIALS . Not applicable.

Source: Rhode Island Standard Specifications (Bluebook), 2024 Edition. Pages 609610 of 826.