905.03.4 Bituminous Sidewalks and Driveways.
905.04 Method of Measurement.
905.04.1 Portland Cement Sidewalks and Driveways. "Portland Cement Concrete Sidewalks and
Driveways" will be measured by the number of cubic yards of pavement actually placed in accordance with the Plans and/or as directed by the Engineer.
905.04.2 Bituminous Concrete Sidewalks and Driveways. "Bituminous Concrete Sidewalks and
Driveways" will be measured by t he number of tons of pavement material actually placed in accordance with the Plans and/or as directed by the Engineer.
905.05 BASIS OF PAYMENT. 905.05.1 Portland Cement Concrete Sidewalks and Driveways. The accepted quantities of
"Portland Cement Concrete Sidewalks and Driveways" will be paid for at the contract unit price per cubic yard as listed in the Proposal. A maximum 5 percent overrun of the calculated quantities based on the required thickness as shown on the Plans is permissible. The price so stated constitutes full and complete compensation for all labor, materials and equipment, including expansion joint material, reinforcement, and all inci dentals required to finish the work, complete and accepted by the Engineer. Excavation and gravel borrow subbase will be paid for separately under appropriate work items. 9−15905.05.2 Bituminous Concrete Sidewalks and Driveways. The accepted quantities of "Bituminous Concrete Sidewalks and Dr iveways" will be paid for at the contract unit price per ton as listed in the Proposal. A maximum 10 percent overrun of the calculated quantities based on the required thickness as shown on the Plans is permissible in accordance with the provisions of Subsection 401.04.1(b) of these Specifications. The price so-stated constitute s full and complete compensation for all labor, materials and equipment, and all incidentals required to finish the work, complete and accepted by the Engineer. Excavation and gravel borrow subbase will be paid for separately under appropriate work items. SECTION 906 CURBING FOR ROADWAYS
906.01 DESCRIPTION. This work consists of the construction of curbing on prepared gravel
bases and/or the construction of bituminous berm on underlying pavement courses at the locations indicated on the Plans or as directed by the Engineer, all in accordance with these Specifications. 906.01.1 Types of Curbing . The following types of curbing are designated as follows: