Electrical (16000-16999)

841.04METHOD OF MEASUREMENT. “Pre- and Post-Construction Condition Surveys" will not be

RI · 2024 Standard SpecificationsBook pages 530530View official source ↗

8−196 6. Condition and grading of the ground surface around the exterior of the structure including evidence of drainage toward s walls, low spots that pond water, cracks and irregularities in asphalt, concrete, brick or stone pavements, sidewalks, and steps and;

7.Evidence of previous repairs to the structures. 8. In the case of post-construction surveys, note all changes from the pre-construction survey. A post-construction survey shall be performed upon substantial completion of the contract. In the event the Contractor and/or survey engineer are unable to gain access, encounter difficulty or be refused entry to a property, they shall document the said refusal in the report and inform the Contractor and Engineer of the incident in writing. Absent a resolution, the survey engineer shall limit the structural condition survey to information that may be gained from observations outside the structure or property boundary, and document the situation in the final report.

841.04 METHOD OF MEASUREMENT. “Pre- and Post-Construction Condition Surveys" will not be

measured for payment.

841.05 BASIS OF PAYMENT. “Pre- and Post-Construction Condition Surveys" will be paid for

at its respective "Lump Sum" contract price as listed in the Proposal. The price so stated shall constitute full and complete compensation for all labor, materials, tools and equipment, and all incidentals required to complete the work as described in this Specification and elsewhere in the Contract Documents, complete in place and accepted by the Engineer. SECTION 842 ANTI-GRAFFITI COATING

842.01 DESCRIPTION . This item of work consists of furnishing and installing an anti-graffiti coating

system on exterior exposed surfaces of all materi al types as designated on the Contract Drawings, elsewhere in the Contract Documents and/or as directed by the Engineer, all in accordance with these Specifications.

842.02 Materials.

Anti-Graffiti System. The system shall be as specified in Section M.19 .

842.03 Construction Methods.

842.03.1 Submittals. The Contractor shall submit to the Engineer for approval, the manufacturer’s