9−73the Proposal. The price so-stated constitutes full and complete compensation for all labor, materials, and equipment and all incidentals required to finish the work, complete and accepted by the Engineer. SECTION 934 FIELD CONTROL AND CONSTRUCTION LAYOUT
934.01 DESCRIPTION. This work consists of establishing, on the ground, all required Field Control
and Construction Layout. Project Field Control and Lay out is defined as accurately providing all necessary computations, stakes and marks required to establish lines, slopes, elevations, points, and continuous profile grades in order to perform a ll the required work for the project in accordance with the Contract requirements. Field Control and Layout is required to enable the Engineer to complete all necessary inspection, checks, verification of quantities and Contract Administration duties. The staking shall include, but not be limited to, clearing and grubbing, grading, drainage, culverts, embankments, borrow, aggregate base c ourse, pavements, bridges, utilities, signs, pavement markings, erosion control, and turf establishment items to complete the project as represented in the plans. The Surveying must be done in a way that is timely, and that is reflective of the continuing and ongoing nature of construction and inspection activities which will generally require frequent, separate project visits by the C ontractor’s survey crew, to the project to accommodate the various stages of construction and inspection activities that will occur. Field Control shall also include all survey required to accurately generate standard cross sections, measure quantities, layout for utility companies, and generate as-built drawings.
934.02 MATERIALS. All survey wedges and survey stakes shall be of seasoned oak and free of
knots. Survey wedges used for control staking shall be 1-¾” x 1-¾” and 18-inches in length. For slope limits, pavement edges, gutter lines, etc., the use of survey stakes shall be acceptable and shall be 1” x 1” and 4’-0” in length.
934.03 Construction Layout
934.03.1 General Responsibilities. It is the responsibility of the Contractor to establish field control
and to lay out the work which is proposed within the Contract. The Engineer will furnish the Contractor with basic field control and survey data for all projects except for resurfacing projects, as basic field control is not necessary to perform the work on these projects.
934.03.02 Department's Responsibility. The Engineer will furnish the Contractor with basic field
control and survey data for all projects, except re surfacing projects, upon Contract Award. This shall include confirming and re-establishing c ontrol, in the field. The basic field control will include control points, benchmarks, survey data files, survey plan sheets, and other data, which may be required for the Contractor to perform construction staking, layout, and maintenance of the basic field control. Survey work may be monitored by the E ngineer for conformance to standard survey practices. The Engineer shall be notified, by t he Contractor, 24 hours prior to any survey work being performed in the field. The Engineer/Surveyor may check the control of the work, as established by the Contractor, at any time as the work progresses.