6-90 SECTION 625 – UTILITY SYSTEMS
625.01 DESCRIPTION . This work shall consist of furnishing and installing utility sleeves, concrete
encased and direct burial conduit, junction and pull boxes, power drop stanchions, utility vaults, and other utility equipment and components as specified on the Plans. 625.0 2 MATERIALS . Materials shall meet the requirements of the following subsections: Sand Borrow and Cushion ................................ ................................ ......................... 703.03 Brick ................................ ................................ ................................ ........................... 705.01 Mortar, Type II ................................ ................................ ................................ ........... 707.01(c) Mortar, Type IV ................................ ................................ ................................ ......... 707.01(e) Joint Sealer, Hot Poured ................................ ................................ ............................ 707.02(a) Preformed Joint Filler, Cork, and Asphalt -Treated Felt ................................ ............ 707.06 Polyvinyl Chloride (PVC) Waterstop ................................ ................................ ........ 707.08 Reinforced Concrete Pipe ................................ ................................ .......................... 710.01 Acrylonitrile -Butadiene -Styrene (ABS) Plastic Pipe ................................ ................. 710.0 4 Polyvinyl Chloride (PVC) Plastic Pipe ................................ ................................ ......710.0 5 Corrugated Steel Pipe, Pipe Arches, and Underdrain s ................................ .............. 711.01 Corrugated Aluminum Alloy Pipe, Pipe Arches, and Underdrain s ........................... 711.02 Bar Reinforcement ................................ ................................ ................................ .....713.01 Plastic Pipe, Flexible ................................ ................................ ................................ ..740.01 Rigid Polyvinyl Chloride (PVC) Electrical Conduit ................................ ................. 752.0 6(a) High -Density Polyethylene (HDPE) Electrical Conduit ................................ ............ 752.06(b) PVC Coated Rigid Metal Conduit (RMC) ................................ ................................ .752.06(c) Junction Boxes ................................ ................................ ................................ ........... 752.09 (a) Pull Boxes ................................ ................................ ................................ .................. 752.09(b) Power Drop Stanchion ................................ ................................ ............................... 752.14 Concrete shall conform to the requirements of Section 541 for Concrete, Class B. All wood blocks used as skids shall be oak or maple structural lumber No. 2 Grade or better. All prefabricated casing spacers shall be designed for the intended application and be of the centered restrained type. Stainless steel strapping shall meet the requirements of ASTM A666. Sleeves for power and communication lines shall be non -metallic. 6-91 Steel sleeves shall conform to ASTM A53 and the wall thickness shall be compatible with the specified buried depth. Carrier pipes shall have restrained joints to allow for future removal of the pipe without having to de - couple the pipe joints. Casing end seals shall be of masonry construction. Modular wall and pipe seals shall be stainless steel hardware or prefabricat ed casing end seals with stainless steel bands. Pedestals, vaults, handholes, and transformer cabinets shall conform to the requirements of the respective utility company specifications. Pull boxes shall be designed and constructed to support at least an HS-20 loading in accordance with the AASHTO Standard Specifications for Highway Bridges .
625.03 GENERAL REQUIREMENTS . The Contractor shall coordinate and work with each utility
company, as necessary, to ensure that the conduit and utility equipment instal led are constructed in accordance with the Plans and the utility company’s specifications.
625.04 Construction Requirements .
625.05 METHOD OF MEASUREMENT . The quantity of Sleeves for Utilit ies, Concrete Encased
Conduit, Direct Burial Conduit, and Wired Conduit of the type and size specified to be measured for payment will be the number of linear feet installed in the complete and accepted work, measured to the nearest foot along the center o f the sleeve or conduit. The quantity of Power Drop Stanchion; Junction Box; Pull Box, Single; Pull Box, Double; Utility Pedestal; Communications Vault; Electric Vault; and Utility Pad to be measured for payment will be the number of each installed in the complete and accepted work.
625.06 BASIS OF PAYMENT . The accepted quantity of Sleeves for Utilities of the type and size
specified will be paid for at the Contract unit price per linear foot. Payment will be full compensation for fabricating, furnishing, transporting, handling, saw -cutting, and placing all materials, including pull wire and end caps, and for furnishing all labor, tools, equipment, and incidentals necessary to complete the work. The accepted quantities of Concrete Encased Conduit and Direc t Burial Conduit of the type and size specified will be paid for at the Contract unit price per linear foot. Payment will be full compensation for furnishing, transporting, handling, and placing the materials specified, including conduit, conduit spacers, transition couplings, elbows, and other fittings; caps, plugs, pulling wire, bedding material, concrete encasement, rebar, and all other material needed for a complete concrete encased or direct burial conduit system; backfill; placing of concrete; and for furnishing all labor, tools, equipment, and incidentals necessary to complete the work. The accepted quantity of Wired Conduit of the size specified will be paid for at the Contract unit price per linear foot. Payment will include both the installed condu it and the wiring inside the conduit. The accepted quantities of Power Drop Stanchion; Junction Box; Pull Box, Single; and Pull Box, Double, will be paid for at the Contract unit price for each. Payment will be full compensation for furnishing and installi ng the materials specified, as well as any excavation, granular material, and any additional drainage pipes needed. 6-97 The accepted quantities of Utility Pedestal, Electric Vault, Communications Vault, and Utility Pad will be paid for at the Contract unit price for each. Payment will be full compensation for transporting, handling, and placing the materials specified; for any coordination with the utility company; excavation, furnishing and placing any subbase material needed; furnishing, and installing grounding material as needed, furnishing and installing any drainage needed; and all materials, tools, labor, equipment, a nd incidentals needed to complete the work. The cost of temporary pavements patches required for work under this section will be considered incidental to the applicable item. Payment will be made under: Pay Item Pay Unit 625.1000 Sleeves for Utilities, HDPE ................................ ................................ ......Linear Foot 625.1002 Sleeves for Utilities, HDPE, 2 Inch ................................ .......................... Linear Foot 625.1004 Sleeves for Utilities, HDPE, 4 Inch ................................ .......................... Linear Foot 625.1006 Sleeves for Utilities, HDPE, 6 Inch ................................ .......................... Linear Foot 625.1008 Sleeves for Utilities, HDPE, 8 Inch ................................ .......................... Linear Foot 625.101 0 Sleeves for Utilities, HDPE, 10 Inch ................................ ........................ Linear Foot 625.1012 Sleeves for Utilities, HDPE, 12 Inch ................................ ........................ Linear Foot 625.1014 Sleeves for Utilities, HDPE, 14 Inch ................................ ........................ Linear Foot 625.1016 Sleeves for Utilities, HDPE, 16 Inch ................................ ........................ Linear Foot 625.1018 Sleeves for Utili ties, HDPE, 18 Inch ................................ ........................ Linear Foot 625.1020 Sleeves for Utilities, HDPE, 20 Inch ................................ ........................ Linear Foot 625.1022 Sleeves for Utilities, HDPE, 22 Inch ................................ ........................ Linear Foot 625.1024 Sleeves for Utilities, HDPE, 24 Inch ................................ ........................ Linear Foot 625.2000 Sleeves for Utilities, PVC ................................ ................................ ......... Linear Foo t 625.2002 Sleeves for Utilities, PVC, 2 Inch ................................ ............................. Linear Foot 625.2004 Sleeves for Utilities, PVC, 4 Inch ................................ ............................. Linear Foot 625.2006 Sleeves for Utilities, PVC, 6 Inch ................................ ............................. Linear Foot 625.2008 Sleeves for Utilities, PVC, 8 Inch ................................ ............................. Linear Foot 625.2010 Sleeves for Utilities, PVC, 10 Inch ................................ ........................... Linear Foot 625.2012 Sleeves for Utilities, PVC, 12 Inch ................................ ........................... Linear Foot 625.2014 Sleeves for Utilities, PVC, 14 Inch ................................ ........................... Linear Foot 625.2016 Sleeves for Utilities, PVC, 16 Inch ................................ ........................... Linear Foot 625.2018 Sleeves for Utilities, PVC, 18 Inch ................................ ........................... Linear Foot 625.2020 Sleeves for Utilities, PVC, 20 Inch ................................ ........................... Linear Foot 625.2022 Sleeves for Utilities, PVC, 22 Inch ................................ ........................... Linear Foot 625.2024 Sleeves for Utilities, PVC, 24 Inch ................................ ........................... Linear Foot 6-98 Pay Item Pay Unit 625.3000 Sleeves for Utilities, Steel ................................ ................................ ......... Linear Fo ot 625.3002 Sleeves for Utilities, Steel, 2 Inch ................................ ............................. Linear Foot 625.3004 Sleeves for Utilities, Steel, 4 Inch ................................ ............................. Linear Foot 625.3006 Sleeves for Utilities, Steel, 6 Inch ................................ ............................. Linear Foot 625.3008 Sleeves for Utilities, Steel, 8 Inch ................................ ............................. Linear Foot 625.3010 Sleeves for Utilities, Steel, 10 Inch ................................ ........................... Linear Foot 625.3012 Sleeves for Utilities, Steel, 12 Inch ................................ ........................... Linear Foot 625.3014 Sleeves for Utilities, Steel, 14 Inch ................................ ........................... Linear Foot 625.3016 Sleeves for Utilities, Steel, 16 Inch ................................ ........................... Linear Foot 625.3018 Sleeves for Utilities, Steel, 18 Inch ................................ ........................... Linear Foot 625.3020 Sleeves for Utilities, Steel, 20 Inch ................................ ........................... Linear Foot 625.3022 Sleeves for Utilities, Steel, 22 Inch ................................ ........................... Linear Foot 625.3024 Sleeves for Utilities, Steel, 24 Inch ................................ ........................... Linear Foot 625.4000 Concrete Encased Conduit ................................ ................................ ........ Linear Foot
625.40 04 Concrete Encased Conduit, 1 to 4 Conduits ................................ ............. Linear Foot
625.40 08 Concrete Encased Conduit, 5 to 8 Conduits ................................ ............. Linear Foot
625.4 012 Concrete Encased Conduit, 9 to 12 Conduits ................................ ........... Linear Foot 625.5000 Direct Burial Conduit ................................ ................................ ................ Linear Foot
625.50 04 Direct Burial Conduit, 1 to 4 Conduits ................................ ..................... Linear Foot
625.50 08 Direct Burial Conduit, 5 to 8 Conduits ................................ ..................... Linear Foot
625.5 012 Direct Burial Conduit, 9 to 12 Conduits ................................ ................... Linear Foot 625.6000 Wired Conduit ................................ ................................ ........................... Linear Foot 625.6002 Wired Conduit, 2 Inch ................................ ................................ ............... Linear Foot 625.6003 Wired Conduit, 3 Inch ................................ ................................ ............... Linear Foot 625.6004 Wired Conduit, 4 Inch ................................ ................................ ............... Linear Foot 625.6006 Wired Conduit, 6 Inch ................................ ................................ ............... Linear Foot 625.7000 Power Drop Stanchion ................................ ................................ .............. Each 625.7010 Junction Box ................................ ................................ ............................. Each 625.702 1 Pull Box, Single ................................ ................................ ........................ Each 625.702 2 Pull Box, Double ................................ ................................ ....................... Each 625.7030 Utility Pedestal ................................ ................................ .......................... Each 625.7040 Communications Vault ................................ ................................ ............. Each 625.7045 Electrical Vault ................................ ................................ ......................... Each 625.7050 Utility Pad ................................ ................................ ................................ .Each 6-99 SECTION 628 – SANITARY SEWER SYSTEMS
628.01 DESCRIPTION . This work shall consist of the construction or reconstruction of sanitary sewer
lines and appurtenances.
628.02 MATERIALS . Materials shall meet the requirements of the following subsections:
Granular Backfill for Structures ................................ ................................ ................. 704.08 Sewer Brick ................................ ................................ ................................ ................ 705.01(b) Rubber Gaskets ................................ ................................ ................................ .......... 707.09 Acrylonitrile -Butadiene -Styrene (ABS) Plastic Pipe ................................ ................. 710.0 4 Polyvinyl Chloride (PVC) Plastic Pipe ................................ ................................ ......710.0 5 Ductile Iron Pipe, Cement Lined ................................ ................................ ............... 740.05 Concrete shall conform to the requirements of Section 541 for Concrete, Class B, unless otherwise specified. Sleev es shall conform to the requirements of Section 625 . 628.0 3 GENERAL REQUIREMENTS . Operation of existing sanitary sewer facilities shall not be interrupted without prior written approval of the Engineer. When existing underground utilities not scheduled fo r removal or abandonment are encountered in the excavation, they shall be adequately supported and protected from damage. Any damage to utilities shall be repaired promptly in accordance with Subsection 107.1 2 at no additional cost to the Agency. The Contractor shall be responsible for the unloading, storing, hauling, and distribution of all materials. All materials that are damaged, destroyed, or lost during and after unloading shall be replaced at the Contractor’s expense. All pipes , pipe fitting s, and accessories shall be handled to avoid shock. Pipes having factory -applied joint material shall be stacked and blocked to prevent damage to the joint material. Material not needed for immediate use shall be safely stored at places provided by the Con tractor and approved by the Engineer. The Contractor’s attention is called to the fact that sewer pipe and fittings are comparatively brittle. Care shall be taken in handling and laying to avoid damaging the pipe and fittings. The locations of all pipes sh all be approved by the Engineer. When directed by the Engineer, the Contractor shall remove, replace, or rework all sewer piping and appurtenances that do not meet the requirements of this section. The Contract or shall perform all remedial measures at no a dditional cost to the Agency.