210.01 Description.
and/or City rules and regulations, and for furnishing all equipment, tools, labor, and incidentals necessary to complete the work.
209.01 Description.
This Section shall cover the work of permanently resetting mailboxes required to be removed from their original position inside the right of way.
209.02 Materials.
All new mailboxes and new support materials furnished shall meet the requirements shown on the plans. The Contractor may re- use existing mailboxes or support materials if approved by the Engineer. Other materials shall be returned to the property owner if requested or disposed of by the Contractor.
209.03 Construction Requirements.
All work shall be done in a workmanlike manner in accordance with the requirements of local codes, ordinances, and U.S. Postal Service Regulations. Any materials lost or rendered unfit for re- use on account of negligence or improper handling by the Contractor shall be replaced by him without additional compensation.
209.04 Method of Measurement.
The number of mailbox reset installations will be the number of each type installation (i.e. single, double, or multiple) permanently reset as directed and accepted. No measurement or direct payment will be made fo r mailboxes removed only and not reset, or for mailboxes removed and temporarily reset.
209.05 Basis of Payment.
210.01 Description.
The work under this Section shall cover the excavation, hauling, disposal, or compaction of all material not being removed under some other item which is encountered within the limits of the work and is necessary for all construction in accordance with these specifications and in reasonably close conformity with the lines, grades, thickness, and typical cross sections shown on the plans or established by the Engineer. All excavation covered in this s ection will be classified as "Unclassified Excavation", "Muck Excavation", "Channel Excavation", or "Borrow Excavation", as described in this Section. Attention is directed to the fact that the roadbed must be treated by one of the methods specified in Sec tion 230, 231 or 232 before the placement of an overlying subbase, base, or paving structure will be permitted.