6-172 ORIGINAL CONTRACT AMOUNT From Up to and Amount of Penalty Damages per Vio lation More Than Including 1st 2nd 3rd & Subsequent $0 $1,000,000 $250 $500 $1,250 $1,000,000 $2,000,000 $500 $1,000 $2,500 $2,000,000 $4,000,000 $1,000 $2,000 $5,000 $4,000,000 and more $2,000 $4,000 $10,000 Cofferdams and related temporary soil erosion and water polluti on controls are incidental to the Pay Item 656.75, unless a specific pay item f or cofferdams is included in the Schedule of Items. If a specific pay item for cofferdams i s included, then related temporary soil erosion and water pollution controls, including inspection and maintenance, are incidental to the pay item for cofferdams. 656.5.2 If No Pay Item If Pa y Item 656.75 is not provided in t he Schedule of Items, then the cost related thereto shall be Incidental to the Contra ct. Failure by the Contractor to follow Standard Specification or Special Provision - Section 65 6 and/or the Contractor’s own Soil Erosion and Water Pollution Control Plan (SEWPCP) will result in a violation letter and a reduction in payment as shown in the schedule belo w. The Department’s Resident or any other representative of The Department reserves the right to suspend the work at any time and request a meeting to discuss violations an d remedies. The Department shall not be held responsible for any delay in the work due to any suspension under this item. Payment will be made under: P a y I t e m P a y U n i t
656.75 Temporary Soil Erosion and Water Pollution Control Lu mp Sum
SECTION 657 - REHABILITATION OF PITS Reserved SECTION 658 - ACRYLIC LATEX COLOR FINISH
658.01 Description This work shall consist of applying a color finish to asphaltic or
Portland cement concrete surfaces designated on the plans for m edian strips, islands, and certain crosswalks, color-coated with an acrylic latex finish s ystem.
658.02 Materials The color finish shall be a green acrylic lat ex emulsion type,
containing only inert mineral pigment colorants, fade-resistant for exterior use. The color coating shall contain insoluble mineral fillers suitable for un iform application, tack free, and shall show no deterioration due to temperature, salts, moisture , and ultraviolet rays of sun for a period of at least one year. 6-173 Only materials on the Qualified Products List of Acrylic Latex Color Finish shall be used.
658.03 Surface Preparation The bituminous or Portland cement c oncrete shall be
carefully laid, free of depressions and ridges and at the pitch or grade shown on the plans to provide flow of water from the surface. The pavement shall be free of all loose dirt, dust particles, grease, oil, or any other contaminant. Grease and o ils shall be removed by a detergent wash, flushed with water, and followed by high-pressu re water, air broom, or hand sweep. The surface course of bituminous concrete pavement shall be a t ight mix of thoroughly compacted material. The pavement shall be placed a minimum of 7 days before the application of the coating. The surface of Portland cement concrete pavement shall be a med ium broom finish. New concrete must cure a minimum of 30 days before application of coating. The concrete surface shall be first washed with phosphoric acid solution [8 parts water to 1 part acid], then coated with a tie-coat before the green finish coat can be applied. The surface shall be accepted by the Resident and the coating s ubcontractor before the application of the color coating. The Contractor shall add sand to the acrylic latex in the cross walk area as directed by the Resident.
658.04 Application of Color Coating The coating shall be appli ed according to the
Manufacturer’s recommendations, which can be found in the techn ical bulletin of the product. The paint shall be stored in an area where freezing or overheat ing will not occur. The acrylic coatings are waterborne and cannot cure in cold tem peratures or when subject to moisture. Care sha ll be taken not to apply coatings when rain is forecast or sudden drop in temperature is expected. Two coats shall be applied over the area in a thickness suffici ent to give uniform texture, appearance, and color, per Manufacturer’s recommendation. The s econd coat shall not be applied until the first coat is completely dried to touch and t he Manufacturer’s minimum time is requirement for top coating has elapsed. No color coating shall be allowed to run, drop, or otherwise co lor adjacent areas. If the Contractor elects to a pply the coating after the above d ate, the Contractor is responsible for the performance of the coating. In this case, t he payment will be withheld until the following spring. 6-174
658.05 Method of Measurement Acrylic Latex Color Finish will b e measured by the
square yard of surface sealed, measured parallel to the surface . Furnishing and adding sand at designated locations will be incidental.
658.06 Basis of Payment The accepted quantity of Acrylic Latex Color Finish will be
paid for at the contract unit price per square yard complete in place, including furnishing, and adding sand, where required. Payment will be made under: Pay Item Pay Unit
658.20 Acrylic Latex Color Finish S q u a r e Y a r d
SECTION 659 - MOBILIZATION
659.01 Description When this item is listed as a Pay Item in the Bid, it shall consist
of preparatory work and operations including, but not limited t o those necessary to the movement of personnel, equipment, supplies and incidentals to t he project site; and for all other work and operations which must be performed or costs incu rred prior to beginning work on the various items on the project site.
659.02 Basis of Payment Partial payments will be made in accor dance with Section
108.2.3 Mobilization The total sum of payments under this item shall not exceed the original Contract amount bid regardless of the fact that the Contractor may shut down th eir work on the Project or move equipment away from the Project and then back again. Payment will be made under: Pay Item P a y U n i t
659.10 Mobilization Lump Sum
SECTION 660 ON-THE-JOB TRAINING
660.01 Description On-The-Job Training programs (OJT) are required as part of the
Contractor’s equal employment opportunity affirmative action pr ogram. The primary objective of on the job training shall be to train and upgrade women, minorities, and