137 Clearing of right -of-way withi n the construction limits of piers, abutments, retaining walls, etc., and backfilling to the level of the original ground will be included in unit prices bid for "Structure Excavation", except that select material for backfilling will be paid for under Ite m 212005 -*. If backfill above original ground is required, material for the backfill will be measured and paid for as prescribed under Sections 207 or 211. The measurement and payment for engineering fabric will be included in the unit price bid for "Sel ect Material for Backfilling". Item 212004 -* "Cofferdams", will be measured and paid for each unit complete in place, including their removal, and shall include all labor, materials, and equipment incidental to the construction, pumping and removal. Prog ress payments, determined by the Engineer, may be made.
212.12 Basis of Payment :
The quantities, measured as provided above, will be paid for at the contract unit price bid for these ite ms, which prices and payments shall be full compensation for furnishing all materials and doing all the work prescribed in a workmanlike and acceptable manner, including all labor, tools, equipment, supplies, and incidentals necessary to complete the work, and also including cost of cofferdams and their removal, except when a separate bid item is provided for Item 212004 -*, "Cofferdams".
212.12.1 Price Adjustment: Select material for backfill not conforming with the
gradation requ irements as described in subsection 212.2.5 .3 will be paid for at the adjusted contract price base on the degree of nonconformance as specified in Table 212.12.1. TABLE 212.12.1 Adjustment of Contract Price for Gradation not Within Specifications Degree of Nonconformance Percent of Contract Price to be Reduced 1.0 to 3.0 2 3.1 to 5.0 4 5.1 to 8.0 7 8.1 to 12.0 11 Greater than 12 * * The Division will make a special evaluation of the material and determine the appropriate action.
212.13 Pay Items :
ITEM DESCRIPTION UNIT 212001 -* Structure Excavation Cubic Yard 212002 -* Wet Excavation Cubic Yard 212003 -* Rock Excavation Cubic Yard 212004 -* Cofferdam Each 212005 -* Select Material For Backfilling Cubic Yard * Sequence number SECTION 213 THROUGH SECTION 216 -BLANK