979 PROTECTIVE COATINGS, STAINS, AND TRAFFIC PAINTS, 821 711.1 Through 711.4: Blank, 821 711.5 -Concrete Protective Coatings and Stain, 821 711.6 -Zinc Primers, 822 711.7 Through 711.11: Blank, 823
711.12 Epoxy Coatings, 823
711.13 Thro ugh 711.20: Blank, 824
711.21 Repair of Damaged Galvanized Surfaces, 824
711.22 Zinc Rich Low Voc System, 824
711.23 Material/System Approval, 825
711.24 Through 711.39 -Blank, 825
711.40 Temporary White or Yellow Traffic Zone
Paint, 825
711.41 White or Yellow Fast -Dry Traffic Paint
(Type II), 827 RAILINGS, 462 617.1 -Description, 462 617.2 -Materials, 462 617.3 -Line and Grade, 462 617.4 -Pipe Railing, 462 617.5 -Ferrous Metal Railing, 462 617.6 -Aluminum Railing, 462 617.7 -Grouting of Anchor Bolts, 463 617.8 -Method of Measurement, 463 617.9 -Basis of Payment, 463
617.10 Pay Items, 464
REINFORCED SOIL SLOPES, 567 645.1 -Description, 567 645.2 -Materials, 567 645.3 -Foundation Preparation, 571 645.4 -Geosynthetic Installation, 571 645.5 -Backfill Placement, 571 645.6 -Erosion Control Material Placement, 572 645.7 -Acceptance, 572 645.8 -Method of Measurement, 572 645.9 -Basis of Payment, 572
645.10 Pay Item, 572
REINFORCING STEEL, 353 602.1 -Description, 353 602.2 -Materials, 353 602.3 -Order Lists, 353 602.4 -Protection of Materials, 353 602.5 -Bending of Reinforcing Bars, 353 602.6 -Placing and Fastening, 354 602.7 -Bar Splices, 355 602.8 -Method of Measurement, 356 602.9 -Basis of Payment, 356
602.10 Pay Items, 356
RE-SEALING CONCRETE PAVEMENT JOINTS, 275 510.1 -Description, 275 510.2 -Materials, 275 510.3 -Construction Methods, 275 510.4 -Method of Measurement, 276 510.5 -Basis of Payment, 276 510.6 -Pay Items, 276 RETAINING WALL SYSTEMS, 501 626.1 -Description, 501 626.2 -General, 501 626.3 -Design Criteria, 501 626.4-Submittals, 502 626.5 -Materials, 503 626.6 -Mechanically Stabilized Earth, 514 626.7 -Retaining Wall, Cast -In-Place Reinforced Concrete, 515 626.8 -Method of Measurement, 516 626.9 -Basis of Payment, 517
626.10 Pay Items, 517
RIGHT -OF-WAY FENCE, 413 608.1 -Description, 413 608.2 -Materials, 413 608.3 -General, 414 608.4 -Clearing, Grubbing, and Trench Excavation, 414 608.5 -Concrete Footers, 414 608.6 -Spacing and Setting Posts, 415 608.7 -Erection of Fencing Materials, 417 608.8 -Paints and Painting, 419 608.9 -Electrical Grounds, 419
608.10 Junctions With Existing Fences, 419
608.11 Temporary Fence, 419
608.12 Method of Measurement, 419
608.13 Basis of Payment, 420
608.14 Pay Items, 420
ROADSIDE SIGN SUPPORTS, 591 657.1 -Description, 591 657.2 -Materials, 591 657.3 -Fabrication, 594 657.4 -Erection, 595 657.5 -Method of Measurement, 601 657.6 -Basis of Payment, 603 657.7 -Pay Items, 604 ROADWAY LIGHTING, 657 662.1 -Description, 657 662.2 -Materials, 657 662.3 -General, 676 662.4 -Concrete, 676 662.5 -Cond uit, 676 662.6 -Backfill, 677 662.7 -Manholes and Junction Boxes, 677 662.8 -Luminaires, 677 662.9 -Cables, 677
662.10 Cable -In-Duct, 678
662.11 Lighting Supports, 679
662.12 Foundations, 680
662.13 Grounding, 680
662.14 Testing, 681
662.15 Method of Measurement, 682
662.16 Basis of Payment, 682
662.17 Pay Items, 683
ROCK SOCKETED DRILLED SHAFT, 488 625.1 -Description, 488 625.2 -Submittals, 488 625.3: Blank, 489 625.4 -Dimensional Requirements, 489 625.5 -Materials, 489 625.6 -Constructio n, 490 625.7 -Inspection of Sockets, 495 625.8 -Method of Measurement, 499 625.9 -Basis of Payment, 499
625.10 Pay Items, 500
980 ROLLER COMPACTED CONCRETE, 290 514.1 -Description, 290 514.2 -Materials, 290 514.3 -Proportioning, 291 514.4 -Testing, 292 514.5 -Equipment and Tools, 295 514.6 -Preparation of Grade and Conditioning of Subgrade or Base, 297 514.7 -Handling, Measuring, and Batching Materials, 297 514.8 -Mixing Rcc, 298 514.9 -Placing Rcc, 298
514.10 Compaction, 300
514.11 Joints, 301
514.12 Finishi ng, 301
514.13 Curing, 302
514.14 Opening to Traffic, 302
514.15 Maintenance, 302
514.16 Method of Measurement, 302
514.17 Basis of Payment, 302
514.18 Pay Item, 303
SANITARY SEWERS, 712 675.1 -Description, 712 675.2 -Materials, 712 675.3 -General, 712 675.4 -Trench Excavation, 714 675.5 -Bedding, 715 675.6 -Pipe Laying, 715 675.7 -Jointing, 716 675.8 -Casing Pipe, 716 675.9 -Thrust Blocking and Anchorage, 716
675.10 Backfilling, 716
675.11 Testing Installations, 716
675.12 Reconstructed Sanitary Sewer, 718
675.13 Manhole, 719
675.14 Abandoning Manholes, 719
675.15 Adjusting Manholes, 719
675.16 Capping Manholes, 719
675.17 Junction Boxes, 719
675.18 Method of Measurement, 719
675.19 Basis of Payment, 720
675.20 Pay Items, 720
SCOPE OF WORK, 20 104.1 -Intent of Contract, 20 104.2 -Alteration of Plans or Character of Work, 20 104.3 -Extra Work, 20 104.4 -Temporary Structures, 20 104.5 -Maintenance of Traffic, 20 104.6 –Rights in and Use of Materials Found on the Project, 21 104.7 -Final Clean Up, 21 104.8 -Bridge Plate, 22 104.9 -Differing Site Conditions, 22
104.10 Suspension of Work Ordered by the Engineer, 23
104.11 Significant Changes in the Character of Work, 24
104.12 Value Engineering Change Proposal and Practical
Design Change Proposal, 24 SEALI NG CRACKS IN CONCRETE PAVEMENT, 261 503.1 -Description, 261 503.2 -Materials, 261 503.3: Blank, 261 503.4 -Preparation of Material Before Use, 261 503.5 -Preparation of Cracks for Sealing, 261 503.6 -Equipment for Applying Sealer, 262 503.7 -Placement Requireme nts, 262 503.8 -Method of Measurement, 262 503.9 -Basis of Payment, 262
503.10 Pay Item, 262
SEEDING AND MULCHING, 575 652.1 -Description, 575 652.2 -Materials, 575 652.3 -Season of Work, 575 652.4 -Area Preparation for Seeding and Mulching, 575 652.5 -Sowing Seed, 576 652.6 -Applying Mulch and Fertilizer, 578 652.7 -Maintenance of Seeded and Mulched Areas, 579 652.8 -Second and Third Step Seeding, Fertilizing and Mulching, 579 652.9 -Method of Measurement, 579
652.10 Basis of Payment, 580
652.11 Pay I tems, 580
SEWER AND WATERLINE MATERIAL, 964 718.1 -Iron Pipe, 964 718.2 Through 718.4: Blank, 964 718.5 -Plastic Pipe (Pvc), 964 718.6: Blank, 964 718.7 -Plastic Pipe (Polyethylene), 964 718.9 -Copper Service Line, 964
718.10 Gate Valves, 964
718.11 Valve Bo xes, 964
718.12 Casing Pipe (Steel), 965
718.13 Fire Hydrants, 965
718.14 Meters, 965
718.15 Miscellaneous Steel (Clamps, Rods, Etc), 965
718.16 Through 718.19: Blank, 965
718.20 Fine Aggregate, 965
718.21 Bedding Material, 965
SHOP PAINTING METAL STRUCTURES, 757 687.1 -Description, 757 687.2 -General, 757 687.3 -Paint Application Requirements, 758 687.4 -Submittals, 761 SHOULDERS AND DITCHES, 148 229.1 -Description, 148 229.2 -Materials, 148 229.3 -Shoulders, 148 229.4 -Ditches, 148 229.5 -Method of Measure ment, 148 229.6 -Basis of Payment, 148 229.7 -Pay Item, 149 SIDEWALKS, 421 609.1 -Description, 421 609.2 -Materials, 421 609.3 -Subgrade Preparation, 423 609.4 -Dry Bed, 423 609.5 -Forms, 423 609.6 -Mixing and Placing Concrete, 423 609.7 -Expansion Joints, 423 609.8-Finishing, 424 609.9 -Method of Measurement, 424