972 BORROW EXCAVATION, 127 211.1 -Description, 127 211.2 -Materials, 127 211.3 -General, 127 211.4 -Unclassified Borrow Excavation, 129 211.5 -Rock Borrow Excavation, 129 211.6 -Select Borrow Excavation, 129 211.7 -Method of Measurement, 129 211.8 -Basis of Payment, 130 211.9 -Pay Items, 131 BRIDGE CLEANING, 755 685.1 Description, 755 685.2 -Testing of Structural Steel, 755 685.3 -General Contractor Responsibility, 756 685.4 -Basis of Payment, 756 685.5 -Pay Item, 756 BUILDING DEMOLITION, WELL AND S EPTIC TANK ABANDONMENT, 99 202.1 -Description, 99 202.2 -Utilities, 99 202.3 -Disposal of Materials, 99 202.4 -Buildings, 99 202.5 -Wells, 101 202.6 -Septic Tanks, 102 202.7 -Method of Measurement, 102 202.8 -Basis of Payment, 102 202.9 -Pay Items, 102 CHIP SEALS, 185 405.1 -Description, 185 405.2 -Materials, 185 405.3 -Weather Restrictions, 186 405.4 -Equipment, 186 405.5 -Preparing and Repairing Existing Surface, 187 405.6 -Cleaning and Sweeping, 187 405.7 -Application of Asphalt Material, 187 405.8 -Application of Aggregate, 187 405.9 -Rolling and Sweeping, 187
405.10 Joints, 188
405.11 Protection of Pavement and Traffic Control, 188
405.12 Sequence of Operations and Quantities of
Materials, 188
405.13 Fog Seal, 189
405.14 Testing and Acceptance, 189
405.15 Method of Measurement, 190
405.16 Basis of Payment, 190
405.17 Pay Items, 190
CLEANING CULVERTS, INLETS AND MANHOLES, 150 240.1 -Description, 150 240.2 -Materials, 150 240.3 -Construction Methods, 150 240.4 -Method of Measurement, 150 240.5 -Basis o f Payment, 150 240.6 -Pay Items, 150 CLEARING AND GRUBBING, 95 201.1 -Description, 95 201.2 -Materials, 95 201.3 -General, 95 201.4 -Clearing, 95 201.5 -Selective Clearing and Thinning, 96 201.6 -Grubbing, 96 201.7 -Disposal, 97 201.8 -Method of Measurement, 98 201.9 -Basis of Payment, 98
201.10 Pay Item, 98
COARSE AGGREGATE, 778 703.1 -Crushed Stone, 778 703.2 -Gravel, 779 703.3 -Slag, 779 703.4 -Grading of Coarse Aggregates, 781 703.5 -Lightweight Coarse Aggregate for Structural Concrete, 781 COMPACTI ON CONTROL OF BASE COURSE MATERIAL, 963 717.1 -General, 963 717.2 -Test Methods, 963 717.3 -Density, 963 CONCRETE ADMIXTURES, CURING AND COATING MATERIALS, 789 707.1 -Air-Entraining Admixtures for Concrete, 789 707.2 -Water -Reducing and Retarding Admixtures for Concrete, 790 707.3 -Water -Reducing Admixtures for Concrete, 791 707.4 -Supplementary Cementitious Materials (Scms) for Use in Portland Cement Concrete, 793 707.5 -Latex Admixture, 793 707.6 -Polyethylene Coated Burlap for Curing Concrete, 794 707.7-Burlap Cloth Made From Jute or Kenaf for Curing Concrete, 794 707.8 -Waterproof Paper for Curing Concrete, 794 707.9 -Liquid Membrane -Forming Compounds for Curing Concrete, 794
707.10 White Polyethylene Sheeting (Film) for Curing
Concrete, 794
707.11 Epoxy Resin Protective Coating, 794
707.12 Concrete Sealer, 794
707.13 Accelerating Admixtures for Concrete, 795
707.14 Water -Reducing and Accelerating Admixtures for
Concrete, 795
707.15 Hydration Control Stabilizing Admixtures for
Concrete, 796
707.16 Concrete Protective Coating Materials, 797
707.17 Specific Performance Admixtures For
Concrete, 798
707.18 Foaming Agent Admixtures, 799
CONCRETE AND PLASTIC PIPE, 832 714.1: Blank, 832 714.2 -Reinforced Concrete Culvert, Storm Drain and Sewer Pipe, 832 714.3 -Reinforced Concrete Arch Culvert, Storm Drain and Sewer Pipe, 832 714.4 -Reinforced Concrete Elliptical Culvert, Storm Drain and Sewer Pipe, 832 714.5 -Perforated Concrete Pipe, 832 714.7 -Precast Reinforced Concrete Box Culverts, 832 714.8 -Concrete Safety Slope End Sections, 833 714.9 Through 714.16: Blank, 834
714.17 Polypropylene Pipe, 834
714.18 High Density Polyethylene Pipe, Steel Reinforced,
714.19 High Density Polyethylene Pipe, Profile Wall, 834
714.20 Polyvinyl Chloride (Pvc) Underdrai n Pipe, 834
714.21: Blank, 834
714.22 Polyvinyl Chloride (Pvc) Pipe, 834
973 CONCRETE GUTTER AND DUMPED ROCK GUTTER, 519 633.1 -Description, 519 633.2 -Materials, 519 633.3 -General, 519 633.4 -Concrete Gutter, 519 633.5 -Dumped Rock Gutter, 520 633.6 -Method of Measurement, 521 633.7 -Basis of Payment, 521 633.8 -Pay Items, 521 CONCRETE PAVEMENT CROSS STITCHING, 286 513.1 -Description, 286 513.2 -Materials, 286 513.3 -Equipment and Tools, 286 513.4 -Construction Methods, 286 513.5 -Opening to Traffic, 28 8 513.6 -Method of Measurement, 288 513.7 -Basis of Payment, 289 513.8 -Pay Item, 289 CONCRETE PAVEMENT REPAIR, 263 506.1 -Description, 263 506.2 -Materials, 263 506.3 -Proportioning, 263 506.4 -Testing, 264 506.5 -Equipment and Tools, 264 506.6 -Construction Metho ds, 264 506.7 -Ride Acceptance, 269 506.8 -Method of Measurement, 269 506.9 -Basis of Payment, 269
506.10 Pay Items, 270
CONCRETE SLAB STABILIZATION, 283 512.1 -Description, 283 512.2 -Materials, 283 512.3 -Proportioning, 283 512.4 -Equipment, 283 512.5 -Construction Methods, 284 512.6 -Opening to Traffic, 285 512.7 -Method of Measurement, 285 512.8 -Basis of Payment, 285 512.9 -Pay Items, 285 CONSTRUCTION SURVEYING, 547 639.1 -Description, 547 639.2 -Materials, 547 639.3 -Construction Layout Stakes, 547 639.4-As-Built Utility Survey, 548 639.5 -Method of Measurement, 550 639.6 -Basis of Payment, 550 639.7 -Pay Items, 550 CONTROL OF MATERIALS, 39 106.1 -Source of Supply and Quality Requirements, 39 106.2 -Local Material Sources, 41 106.3 -Samples, 42 106.4 -Plant I nspection, 43 106.5 -Storage of Materials, 43 106.6 -Handling Materials, 44 106.7 -Unacceptable Materials, 44 106.8 -Division -Furnished Material, 44 106.9 -Silence of Specifications, 44 CONTROL OF WORK, 27 105.1 -Authority of The Engineer, 27 105.2 -Plans and Wor king Drawings, 27 105.3 -Conformity With Plans and Specifications, 31 105.4 -Coordination of Plans, Specifications, Supplemental Specifications, and Special Provisions, 31 105.5 -Cooperation by Contractor, 31 105.6 -Cooperation With Utilities, 32 105.7 -Cooperation Between Contractors, 33 105.8 -Construction Stakes, Lines and Grades, 33 105.9 -Authority and Duties of The Project Engineer or Project Supervisor, 34
105.10 Authority and Duties Of The Inspector, 34
105.11 Inspection of Work and Materials, 34
105.12 Removal of Unacceptable and Unauthorized
Work, 35
105.13 Load Restrictions, 35
105.14 Maintenance During Construction, 35
105.15 Failure to Maintain Roadway or Structure, 36
105.16 Acceptance, 36
105.17 Claims for Adjustment and Disputes, 37
CON TROLLED LOW -STRENGTH MATERIAL, 144 219.1 -Description, 144 219.2 -Materials, 144 219.3 -Properties, 144 219.4 -Construction Methods, 144 219.5 -Method of Measurement, 146 219.6 -Pay Item, 146 CRACK SEALING IN ASPHALT PAVEMENT, 183 403.1 -Description, 183 403.2 -Materials, 183 403.3 -Weather Restrictions, 183 403.4 -Construction, 183 403.5 -Method of Measurement, 184 403.6 -Basis of Payment, 184 403.7 -Pay Item, 184 CRUSHED AGGREGATE BASE COURSE, 151 307.1 -Description, 151 307.2 -Materials, 151 307.3 -Equipment, 153 307.4 -Placing, 153 307.5 -Compacting, 154 307.6 -Tolerance, 154 307.7 -Maintenance, 154 307.8 -Method of Measurement, 154 307.9 -Basis of Payment, 155
307.10 Pay Items, 156
CURBS, COMBINATION CURBS AND GUTTERS AND MEDIANS, 426 610.1 -Descrip tion, 426 610.2 -Materials, 426 610.3 -Plain Concrete Curbing, Integral Concrete Curbing, and Combination Concrete Curb and Gutter, 428 610.4: Blank, 429 610.5 -Asphalt Curbing, 429 610.6 -Median Barrier, 430 610.7 -Raised Concrete Traffic Island, 430 610.8 -Method of Measurement, 430 610.9 -Basis of Payment, 431
610.10 Pay Items, 431
DEFINITION OF TERMS, 1 101.1 -Abbreviations, 1 101.2 -Definitions, 2 101.3 -Interpretations, 9