506.10Pay Items, 270

WV · 2023 Standard SpecificationsBook pages 996996View official source ↗

973 CONCRETE GUTTER AND DUMPED ROCK GUTTER, 519 633.1 -Description, 519 633.2 -Materials, 519 633.3 -General, 519 633.4 -Concrete Gutter, 519 633.5 -Dumped Rock Gutter, 520 633.6 -Method of Measurement, 521 633.7 -Basis of Payment, 521 633.8 -Pay Items, 521 CONCRETE PAVEMENT CROSS STITCHING, 286 513.1 -Description, 286 513.2 -Materials, 286 513.3 -Equipment and Tools, 286 513.4 -Construction Methods, 286 513.5 -Opening to Traffic, 28 8 513.6 -Method of Measurement, 288 513.7 -Basis of Payment, 289 513.8 -Pay Item, 289 CONCRETE PAVEMENT REPAIR, 263 506.1 -Description, 263 506.2 -Materials, 263 506.3 -Proportioning, 263 506.4 -Testing, 264 506.5 -Equipment and Tools, 264 506.6 -Construction Metho ds, 264 506.7 -Ride Acceptance, 269 506.8 -Method of Measurement, 269 506.9 -Basis of Payment, 269

506.10 Pay Items, 270

CONCRETE SLAB STABILIZATION, 283 512.1 -Description, 283 512.2 -Materials, 283 512.3 -Proportioning, 283 512.4 -Equipment, 283 512.5 -Construction Methods, 284 512.6 -Opening to Traffic, 285 512.7 -Method of Measurement, 285 512.8 -Basis of Payment, 285 512.9 -Pay Items, 285 CONSTRUCTION SURVEYING, 547 639.1 -Description, 547 639.2 -Materials, 547 639.3 -Construction Layout Stakes, 547 639.4-As-Built Utility Survey, 548 639.5 -Method of Measurement, 550 639.6 -Basis of Payment, 550 639.7 -Pay Items, 550 CONTROL OF MATERIALS, 39 106.1 -Source of Supply and Quality Requirements, 39 106.2 -Local Material Sources, 41 106.3 -Samples, 42 106.4 -Plant I nspection, 43 106.5 -Storage of Materials, 43 106.6 -Handling Materials, 44 106.7 -Unacceptable Materials, 44 106.8 -Division -Furnished Material, 44 106.9 -Silence of Specifications, 44 CONTROL OF WORK, 27 105.1 -Authority of The Engineer, 27 105.2 -Plans and Wor king Drawings, 27 105.3 -Conformity With Plans and Specifications, 31 105.4 -Coordination of Plans, Specifications, Supplemental Specifications, and Special Provisions, 31 105.5 -Cooperation by Contractor, 31 105.6 -Cooperation With Utilities, 32 105.7 -Cooperation Between Contractors, 33 105.8 -Construction Stakes, Lines and Grades, 33 105.9 -Authority and Duties of The Project Engineer or Project Supervisor, 34

105.10 Authority and Duties Of The Inspector, 34

105.11 Inspection of Work and Materials, 34

105.12 Removal of Unacceptable and Unauthorized

Work, 35

105.13 Load Restrictions, 35

105.14 Maintenance During Construction, 35

105.15 Failure to Maintain Roadway or Structure, 36

105.16 Acceptance, 36

105.17 Claims for Adjustment and Disputes, 37

CON TROLLED LOW -STRENGTH MATERIAL, 144 219.1 -Description, 144 219.2 -Materials, 144 219.3 -Properties, 144 219.4 -Construction Methods, 144 219.5 -Method of Measurement, 146 219.6 -Pay Item, 146 CRACK SEALING IN ASPHALT PAVEMENT, 183 403.1 -Description, 183 403.2 -Materials, 183 403.3 -Weather Restrictions, 183 403.4 -Construction, 183 403.5 -Method of Measurement, 184 403.6 -Basis of Payment, 184 403.7 -Pay Item, 184 CRUSHED AGGREGATE BASE COURSE, 151 307.1 -Description, 151 307.2 -Materials, 151 307.3 -Equipment, 153 307.4 -Placing, 153 307.5 -Compacting, 154 307.6 -Tolerance, 154 307.7 -Maintenance, 154 307.8 -Method of Measurement, 154 307.9 -Basis of Payment, 155

307.10 Pay Items, 156

CURBS, COMBINATION CURBS AND GUTTERS AND MEDIANS, 426 610.1 -Descrip tion, 426 610.2 -Materials, 426 610.3 -Plain Concrete Curbing, Integral Concrete Curbing, and Combination Concrete Curb and Gutter, 428 610.4: Blank, 429 610.5 -Asphalt Curbing, 429 610.6 -Median Barrier, 430 610.7 -Raised Concrete Traffic Island, 430 610.8 -Method of Measurement, 430 610.9 -Basis of Payment, 431

610.10 Pay Items, 431

DEFINITION OF TERMS, 1 101.1 -Abbreviations, 1 101.2 -Definitions, 2 101.3 -Interpretations, 9

Source: West Virginia Standard Specifications for Road and Bridge Construction, 2023 Edition. Pages 996996 of 1,006.