978 PIPE CULVERTS, 382 604.1 -Description, 382 604.2 -Materials, 382 604.3 -General, 384 604.4 -Trench Excavation, 384 604.5-Bedding, 385 604.6 -Laying and Joining, 385 604.7: Blank, 386 604.8 -Backfilling, 386 604.9 -Field Paving, 387
604.10 Remove And Relay Pipe, 388
604.11 Jacking Pipe, 388
604.12 Inspection and Acceptance, 389
604.13 Method of Measurement, 392
604.14 Basis of Payment, 392
604.15 Pay Items, 393
PNEUMATICALLY APPLIED MORTAR OR CONCRETE (SHOTCRETE), 479 623.1 -Description, 479 623.2 -Materials, 479 623.3 -Qualifications, 480 623.4 -Proportioning, 481 623.5 -Pre-Construction Testing, 481 623.6 -Testing During Construction, 482 623.7 -Equipment and Tools, 484 623.8 -Handling, Measuring and Batching of Material, 484 623.9 -Cleaning, 484
623.10 Placing Reinforcing Steel, 484
623.11 Placing Shotcrete, 484
623.12 Finishing Shotcrete Surfaces, 485
623.13 Curing and Protecting Shotcrete, 486
623.14 Method of Measurement, 486
623.15 Basis of Payment, 486
623.16 Pay Items, 486
PORTLAND CEMENT CONCRETE PAVEMENT, 229 501.1 -Description, 229 501.2 -Materials, 229 501.3 -Proportioning, 230 501.4 -Testing, 233 501.5 -Equipment And Tools, 235 501.6 -Preparation Of Grade, Setting Forms, and Conditioning of Subgrade or Base, 238 501.7 -Handling, Measuring, and Batching Materials, 240 501.8 -Mixing Concrete, 240 501.9 -Placing Concrete, 241
501.10 Strike -Off of Concrete and Placement of
Reinforcement, 243
501.11 Joints, 243
501.12 Final Strike -Off, Consolidation and Finishing, 247
501.13 Surface Tests, 250
501.14 Curing, 250
501.15 Removing Forms, 252
501.16 Sealing Joints, 252
501.17 Protection of Pavement, 253
501.18 Opening Pavement to Traffic, 254
501.19 Tolerance in Pavement Thickness, 254
501.20 Pavement Widening, 255
501.21 Adverse Weather Conditions, 255
501.22 Method of Measurement, 256
501.23 Basis of Payment, 257
501.24 Pay Items, 258
PREFORMED ELASTOM ERIC JOINT SEALER, 487 624.1 -Description, 487 624.2 -Materials, 487 624.3 -Preparation of Joint, 487 624.4 -Installation, 487 624.5 -Method of Measurement, 487 624.6 -Basis of Payment, 487 624.7 -Pay Item, 487 PRESTRESSED CONCRETE MEMBERS, 357 603.1 -Description, 357 603.2 -Materials, 357 603.3 -Plant Requirements and Approval, 358 603.4 -Working Drawings, 359 603.5 -Reinforcement, 360 603.6 -Concrete, 360 603.7 -Prestressing, 370 603.8 -Curing, 373 603.9 -Finishing, 374
603.10 Workmanship, 375
603.11 Dimensional Tolerances, 376
603.12 Handling, Storing, Transporting, and Erection, 379
603.13 Construction of Deck, 379
603.14 Measurement and Payment, 380
603.15 Pay Items, 381
PROJECT MARKERS, RIGHT -OF-WAY MARKERS, SURVEY MARKERS, AND OUTLET MARKER S, 544 638.1 -Description, 544 638.2 -Materials, 544 638.3 -Right -of-Way Markers, 544 638.4 -Concrete Survey Markers, 544 638.5 -Metal (Sign -Post) Project Markers, 545 638.6 -Outlet Markers, 545 638.7 -Method of Measurement, 546 638.8 -Basis of Payment, 546 638.9 -Pay Item, 546 PROSECUTION AND PROGRESS, 64 108.1 -Subletting of Contract, 64 108.2 -Notice to Proceed, 65 108.3 -Prosecution of the Work, 65 108.4 -Limitation of Operations, 71 108.5 -Character of Workers; Methods and Equipment, 71 108.6 -Determination and Extension of Contract Time, 72 108.7 -Completion Dates, 76 108.8 -Default and Termination of Contract, 77 108.9 -Termination of Contract for Convenience of The State, 77