Electrical (16000-16999)

636.12, at each unique location within the project. However, over the life of the project

WV · 2023 Standard SpecificationsBook pages 561561View official source ↗

541 636.23.25 -Warning Lights: The quantity of "Warning Lights" shall be the actual number of days that a light is used on the project.

636.23.26 Shadow Vehicle: A “Shadow Vehicle” shall be on a per -month basis and shall

include the flashing beacon, fuel, crew and truck -mounted attenuator used in conjunction with the vehicle. The Department will measure the item by actual number of months the vehicle is used on the project. Partial months will be paid for as a full month.

636.23.27 Temporary Impact Attenuating Device: One unit of “Temporary Impact

Attenuating Device” shall be paid at the time of initial installation of a device, as described in Section 636.12 , at each unique location within the project. However, over the life of the project the Contractor shall not be paid for a quantity of this item exceeding the maximum number of individual devices required to be in place on the project at a specific time. E ach installation beyond this quantity shall be paid for using the “Remove and Reset Attenuator Device” item.

636.23.28 Remove and Reset Attenuator Device: This item shall be measured and paid

for in accordance with the provisions of Section 636.23.27.

636.24 Basis of Payment :

The quantities, determined as provided above, will be paid for at the contract unit price bid for the items listed below, which prices and payment shall be full compensation for furnishing all the materials and doing all the work prescribed in a workmanlike and acceptable manner, including all labor, tools, equipment, supplies and incidentals necessary to complete the work. When aggregate for maintaining traffic, dust palliatives, flagger, traffic director, cleaning of traffic control devices or the electric arrow are contained in the contract as pay items, payment for such pay items will not be made subsequent to the date of required completion of the project. “Temporary Structure for Maintaining Traffic” will be paid as partial payments with the following schedule:

i.The Contractor will be paid 75% of the bid price for this item after all the temporary structure work is complete and it is being used to maintain tr affic. ii. The remaining 25% will be paid when it is all removed. If during the prosecution of the work, additional items under this Section, not included in the contract, are found to be necessary as determined by the Engineer, payment for such additional items will be made under the provisions of 104.3.

636.25 Pay Items :

ITEM DESCRIPTION UNIT 636002 -* Aggregate For Maintaining Traffic, ** Ton 636005 -* Temporary Structure For Maintaining Traffic Lump Sum 636006 -* Pilot Truck And Driver Day 636007 -* Eradication of Pavement Marking Square Foot 636008 -* Temporary Pavement Marking -Paint Linear Foot 636009 -* Temporary Pavement Marking -Tape Linear Foot 636010 -* Temporary Raised Pavement Marker Each 636011 -* Traffic Control Device Unit

Source: West Virginia Standard Specifications for Road and Bridge Construction, 2023 Edition. Pages 561561 of 1,006.