971 Index This index is not intended to be a complete concordance, but is intended to provide a general reference of where a Section or Subsection can be found. The entire book is available online and may be searched extensively and specifically for particular words and phrases. APPROACH SLABS, 259 502.1 -Description, 259 502.2 -Materials, 259 502.3 -Forms, 259 502.4 -Placing, 259 502.5 -Joints, 259 502.6 -Curbs, 259 502.7 -Method of Measurement, 260 502.8 -Basis of Payment, 260 502.9 -Pay Item, 260 ASBEST OS ABATEMENT, 745 681.1 -General, 745 681.2 -Execution, 749 681.3 -Method of Measurement, 753 681.4 -Basis of Payment, 753 681.5 -Pay Items, 754 ASPHALT BASE AND WEARING COURSES, PERCENT WITH LIMITS (PWL), 198 410.1 -Description, 198 410.2 -Materials, 199 410.3 -General, 199 410.4 -Composition of Mixtures, 199 410.5 -Testing, 202 410.6 -Contractors Quality Control, 202 410.7 -Acceptance Testing, 203 410.8: Blank, 208 410.9 -Equipment, 208
410.10 Paving Operations, 211
410.11 Protection of Pa vement and Traffic Control, 212
410.12 Method of Measurement, 212
410.13 Basis of Payment, 213
410.14 Pay Items, 217
ASPHALT BASE, WEARING, AND PATCHING AND LEVELING COURSES, 161 401.1 -Description, 161 401.2 -Materials, 161 401.3 -General, 161 401.4 -Composit ion of Mixtures, 162 401.5 -Testing, 165 401.6 -Contractors Quality Control, 165 401.7 -Verification Testing, 169 401.8 -Weather Restrictions, 171 401.9 -Equipment, 171
401.10 Paving Operations, 175
401.11 Protection of Pavement and Traffic Control, 177
401.12 Method of Measurement, 177
401.13 Basis of Payment, 177
401.14 Pay Items, 180
ASPHALT MATERIALS, 787 705.1 -Winter Grade Cut -Back Asphalt, 787 705.2 -Liquid Asphalt (Rapid Curing Type), 787 705.3 -Liquid Asphalt (Medium Curing Type), 787 705.4 -Asphalt Emulsion, 787 705.5 -Performance Graded Binders, 787 705.6: Blank, 788 705.7 -Asphalt for Dampproofing and Water -Proofing, 788 705.8 -Primer for Use With Asphalt in Dampproofing And Waterproofing, 788 705.9 Through 705.10: Blank, 788
705.11 Cationic Emulsified Asphalt, 788
705.12 Polymer -Modified Cationic Emulsified
Asphalt, 788
705.13 Nonstandard Asphalt Materials, 788
ASPHALT SKID RESISTANT PAVEMENT, 181 402.1 -Description, 181 402.2 -Materials, 181 402.3 -Fine Aggregate, 181 402.4 -Mixing, 182 402.5-Measurment and Payment, 182 402.6 -Pay Item, 182 AWARD AND EXECUTION OF CONTRACT, 16 103.1 -Consideration of Proposals, 16 103.2 -Bid Protests, 16 103.3 -Award of Contract, 17 103.4 -Cancellation of Award, 17 103.5 -Return of Proposal Guaranty, 17 103.6 -Requirement of Contract Bond, 17 103.7 -Insurance Requirements, 18 103.8 -Special Bonds and Insurance, 19 103.9 -Execution of Contract, 19
103.10 Failure to Execute Contract, 19
103.11 Preconstruction Conference, 19
BASE COURSE REINFORCEMENT GEOGRID, 106 206.1 -Description, 106 206.2 -Reference Documents, 106 206.3 -Geogrid Material, 106 206.4 -Manufacturing Quality Control, 108 206.5 -Transportation, Handling And Storage, 109 206.6 -Construction, 109 206.7 -Measurement/Payment, 110 206.8 -Pay Item, 110 BIDDING RE QUIREMENTS AND CONDITIONS, 10 102.1 -Eligibility of Bidders, 10 102.2 -Proposal Forms, 10 102.3 -Interpretation of Approximate Estimates, 11 102.4 -Examination of Plans, Specifications, and Site of Work, 11 102.5 -Proposal Submission, 11 102.6 -Proposal Guaranty , 13 102.7 -Withdrawal of Proposals, 13 102.8 -Combination Proposals, 13 102.9 -Questions Regarding Advertised Proposals, 13