980 ROLLER COMPACTED CONCRETE, 290 514.1 -Description, 290 514.2 -Materials, 290 514.3 -Proportioning, 291 514.4 -Testing, 292 514.5 -Equipment and Tools, 295 514.6 -Preparation of Grade and Conditioning of Subgrade or Base, 297 514.7 -Handling, Measuring, and Batching Materials, 297 514.8 -Mixing Rcc, 298 514.9 -Placing Rcc, 298
514.10 Compaction, 300
514.11 Joints, 301
514.12 Finishi ng, 301
514.13 Curing, 302
514.14 Opening to Traffic, 302
514.15 Maintenance, 302
514.16 Method of Measurement, 302
514.17 Basis of Payment, 302
514.18 Pay Item, 303
SANITARY SEWERS, 712 675.1 -Description, 712 675.2 -Materials, 712 675.3 -General, 712 675.4 -Trench Excavation, 714 675.5 -Bedding, 715 675.6 -Pipe Laying, 715 675.7 -Jointing, 716 675.8 -Casing Pipe, 716 675.9 -Thrust Blocking and Anchorage, 716
675.10 Backfilling, 716
675.11 Testing Installations, 716
675.12 Reconstructed Sanitary Sewer, 718
675.13 Manhole, 719
675.14 Abandoning Manholes, 719
675.15 Adjusting Manholes, 719
675.16 Capping Manholes, 719
675.17 Junction Boxes, 719
675.18 Method of Measurement, 719
675.19 Basis of Payment, 720
675.20 Pay Items, 720
SCOPE OF WORK, 20 104.1 -Intent of Contract, 20 104.2 -Alteration of Plans or Character of Work, 20 104.3 -Extra Work, 20 104.4 -Temporary Structures, 20 104.5 -Maintenance of Traffic, 20 104.6 –Rights in and Use of Materials Found on the Project, 21 104.7 -Final Clean Up, 21 104.8 -Bridge Plate, 22 104.9 -Differing Site Conditions, 22
104.10 Suspension of Work Ordered by the Engineer, 23
104.11 Significant Changes in the Character of Work, 24
104.12 Value Engineering Change Proposal and Practical
Design Change Proposal, 24 SEALI NG CRACKS IN CONCRETE PAVEMENT, 261 503.1 -Description, 261 503.2 -Materials, 261 503.3: Blank, 261 503.4 -Preparation of Material Before Use, 261 503.5 -Preparation of Cracks for Sealing, 261 503.6 -Equipment for Applying Sealer, 262 503.7 -Placement Requireme nts, 262 503.8 -Method of Measurement, 262 503.9 -Basis of Payment, 262
503.10 Pay Item, 262
SEEDING AND MULCHING, 575 652.1 -Description, 575 652.2 -Materials, 575 652.3 -Season of Work, 575 652.4 -Area Preparation for Seeding and Mulching, 575 652.5 -Sowing Seed, 576 652.6 -Applying Mulch and Fertilizer, 578 652.7 -Maintenance of Seeded and Mulched Areas, 579 652.8 -Second and Third Step Seeding, Fertilizing and Mulching, 579 652.9 -Method of Measurement, 579
652.10 Basis of Payment, 580
652.11 Pay I tems, 580
SEWER AND WATERLINE MATERIAL, 964 718.1 -Iron Pipe, 964 718.2 Through 718.4: Blank, 964 718.5 -Plastic Pipe (Pvc), 964 718.6: Blank, 964 718.7 -Plastic Pipe (Polyethylene), 964 718.9 -Copper Service Line, 964
718.10 Gate Valves, 964
718.11 Valve Bo xes, 964
718.12 Casing Pipe (Steel), 965
718.13 Fire Hydrants, 965
718.14 Meters, 965
718.15 Miscellaneous Steel (Clamps, Rods, Etc), 965
718.16 Through 718.19: Blank, 965
718.20 Fine Aggregate, 965
718.21 Bedding Material, 965
SHOP PAINTING METAL STRUCTURES, 757 687.1 -Description, 757 687.2 -General, 757 687.3 -Paint Application Requirements, 758 687.4 -Submittals, 761 SHOULDERS AND DITCHES, 148 229.1 -Description, 148 229.2 -Materials, 148 229.3 -Shoulders, 148 229.4 -Ditches, 148 229.5 -Method of Measure ment, 148 229.6 -Basis of Payment, 148 229.7 -Pay Item, 149 SIDEWALKS, 421 609.1 -Description, 421 609.2 -Materials, 421 609.3 -Subgrade Preparation, 423 609.4 -Dry Bed, 423 609.5 -Forms, 423 609.6 -Mixing and Placing Concrete, 423 609.7 -Expansion Joints, 423 609.8-Finishing, 424 609.9 -Method of Measurement, 424