710 iv At the ends of new inserted material, where connection is made by breaking and insertion in an existing pipeline. This inserted material, regardless of size, will be considered being of the same size as the connecting pipe and paid for as such. No deduction in length will be made for valves or fittings.
670.11.2 Casing Pipe: Casing pipe will be measured by the foot in place. The
measurement will be made along the centerline of each pipe installed.
670.11.3 Gate Valve and Valve Box, Fire Hydrants, Meters, Meter Valves and
Appurtenances, and Special Structures: These items will be measured by the unit.
670.11.4 House Connections: House connections will be measured foot of pipe, measured
along the centerline, complete in place including all taps and all couplings, goose necks, corporation stops, curb cocks, curb boxes or other material necessary to complete the work.
670.12 Basis of Payment :
The quantities, determined as provided above, will be paid for at the contract unit prices bid for the items listed in 670.13, which prices and payments shall be full compensation f or excavation and backfill, except as otherwise provided, testing, disinfecting, thrust blocking, connecting to valves and fire hydrants, all branch connections, fittings, drains, blowoffs and service connections, reinforcing steel, manhole frame and cover , the repair and repaving of areas not otherwise provided for in the Plans, the removal of all surplus material and clean up, furnishing of all materials and doing all work prescribed in a workmanlike and acceptable manner, including all labor, tools, equi pment, supplies, and incidentals necessary to complete the work. When unsatisfactory foundation materials encountered at the bottom of the trench, there will be no additional compensation for such excavation and backfill, unless the required excavation and replacement exceeds one ( 1) foot of depth. Excavation and replacement material in excess of one ( 1) foot, and any special foundation not called for on the Plans will be paid for in accordance with 109.4. When boring and jacking of casing pipe is specifi ed in the Contract, the cost of the boring and jacking operations will not be paid for separately but shall be included in the unit price bid for the respective casing pipe pay items. If the Engineer determines that field conditions necessitate the boring and jacking of casing pipe not so specified, the casing pipe pay item as originally specified will be non -performed and the cost for such boring and jacking operations, including the cost of the casing pipe, will be paid for in accordance with 109.4.