B
HomeLibrariesCopilotSearchProjectsBookmarks
FeedbackHelp Desk
Libraries
Building Codes
Code LibraryIBC — BuildingIRC — ResidentialIFC — FireIPC — PlumbingIMC — MechanicalIFGC — Fuel GasIECC — EnergyNEC — ElectricalModel Codes
Specifications
CSI SpecificationsDOT SpecsTransit SpecsUSACE
Standards
TransportationRailroadFire SafetyAccessibilityStructural
Tools & References
DiagramsAssembliesProductsCalculatorsChecklistsPermits
PricingLog in
Electrical (16000-16999)

601.10Placing Concrete, 335

WV · 2023 Standard SpecificationsBook pages 10051005View official source ↗

982 SURFACE PREPARATION AND POWDER COATING OF NEW GALVANIZED STEEL FOR HIGHWAY SIGNING AND LIGHTING STRUCTURES, 771 690.1 -General, 771 690.2 -Products, 771 690.3 -Surface Preparation and Powder Coating, 772 690.4 -Environmental Conditions, 772 690.5 -Powder Coating, 773 690.6 -Powder Coating Application, 7 73 690.7 -Repair of Damaged Coating, 773 690.8 -Inspection, 773 690.9 -Basis of Payment, 773 TACK COAT, 194 408.1 -Description, 194 408.2 -Materials, 194 408.3 -Weather Restriction, 194 408.4 -Equipment, 195 408.5 -Preparing and Repairing Base or Existing Surfaces , 195 408.6 -Cleaning and Sweeping, 195 408.7 -Application of Asphalt Material, 195 408.8 -Application of Cover Aggregate, 196 408.9 -Joints, 196

408.10 Protection of the Pavement and Traffic Control, 196

408.11 Quantities of Materials, 196

408.12 Method of Measurement, 197

408.13 Basis of Payment, 197

408.14 Pay Item, 197

TEMPORARY POLLUTION CONTROL, 557 642.1 -Description, 557 642.2 -Materials, 557 642.3 -Preconstruction Conference, 558 642.4 -General Requirements, 558 642.5 -Seeding and Mulchin g, 560 642.6 -Temporary Pipe, Contour Ditches, Berms, Slope Drains, Rock Check Dam, Silt Fence, and Super Silt Fence, 562 642.7 -Method of Measurement, 564 642.8 -Basis of Payment, 565 642.9 -Pay Items, 566 THREE -SIDED REINFORCED CONCRETE BRIDGE/CULVERT, 468 620.1-Description, 468 620.2 -General, 468 620.3 -Design Criteria, 468 620.4 -Submittals, 470 620.5 -Materials, 471 620.6 -Construction Methods, 475 620.7 -Method of Measurement, 477 620.8 -Basis of Payment, 477 620.9 -Pay Items, 478 TRAFFIC SIGNALS, 631 660.1 -Description, 631 660.2 -Materials, 631 660.3 -General, 632 660.4 -Maintaining Traffic, 632 660.5 -Removing Existing Signal Equipment, 632 660.6 -Removing and Replacing Improvements, 632 660.7 -Excavating and Backfilling, 632 660.8 -Foundations, 633 660.9 -Loop Traffic Detectors, 634

660.10 Signal Heads, 635 660.11 -Cabinets, 637

660.12 Support Structures, 637

660.13 Messenger Cable, 637

660.14 Conduit, 638

660.15 Junction Boxes, 639

660.16 Wiring, 639

660.17 Power Service, 641

660.18 Testing, 642

660.19 Method of Measurement, 642

660.20 Basis of Payment, 644

660.21 Pay Items, 645

TRAFFIC SIGNS AND DELINEATORS, 646 661.1 -Description, 646 661.2 -Materials, 646 661.3 -Fabrication, 649 661.4 -Erection, 653 661.5 -Method of Measurement, 654 661.6 -Basis of Payment, 655 661.7 -Pay Items, 656 TREE AND SHRUB PLANTING, 584 654.1 -Description, 584 654.2 -Materials, 584 654.3 -Inspection and Delivery of Plant Material, 584 654.4 -Care After Delivery, 585 654.5 -Digging Holes for Plants, 585 654.6 -Plant Backfill, 585 654.7-Planting, 586 654.8 -Pruning, 586 654.9 -Staking and Guying, 587

654.10 Mulching, 587

654.11 Wrapping and Foliage Protection, 587

654.12 Rain Basins, 587

654.13 Clean -Up After Planting, 587

654.14 Care and Replacement of Plants, 587

654.15 Method of Measu rement, 588

654.16 Basis of Payment, 588

654.17 Pay Items, 589

UNDERDRAINS, 398 606.1 -Description, 398 606.2 -Materials, 398 606.3 -Construction Methods, 399 606.4 -Method of Measurement, 401 606.5 -Basis of Payment, 402 606.6 -Pay Items, 402 VINE AND GROUND COVER PLANTING, 581 653.1 -Description, 581 653.2 -Materials, 581 653.3 -Planting Of Vines and Ground Cover Plants, 581 653.4 -Care Of Vines and Ground Cover, 582 653.5 -Replacement Of Vines and Ground Cover, 582 653.6 -Care During and After Delivery, 582 653.7 -Method of Measurement, 582 653.8 -Basis of Payment, 583 653.9 -Pay Items, 583 WATER, 543 637.1 -Description, 543 637.2 -Materials, 543 637.3 -Construction Methods, 543 637.4 -Method of Measurement, 543 637.5 -Basis of Payment, 543 637.6 -Pay It em, 543

Source: West Virginia Standard Specifications for Road and Bridge Construction, 2023 Edition. Pages 10051005 of 1,006.