980 ROLLER COMPACTED CONCRETE, 290 514.1 -Description, 290 514.2 -Materials, 290 514.3 -Proportioning, 291 514.4 -Testing, 292 514.5 -Equipment and Tools, 295 514.6 -Preparation of Grade and Conditioning of Subgrade or Base, 297 514.7 -Handling, Measuring, and Batching Materials, 297 514.8 -Mixing Rcc, 298 514.9 -Placing Rcc, 298
514.10 Compaction, 300
514.11 Joints, 301
514.12 Finishi ng, 301
514.13 Curing, 302
514.14 Opening to Traffic, 302
514.15 Maintenance, 302
514.16 Method of Measurement, 302
514.17 Basis of Payment, 302
514.18 Pay Item, 303
SANITARY SEWERS, 712 675.1 -Description, 712 675.2 -Materials, 712 675.3 -General, 712 675.4 -Trench Excavation, 714 675.5 -Bedding, 715 675.6 -Pipe Laying, 715 675.7 -Jointing, 716 675.8 -Casing Pipe, 716 675.9 -Thrust Blocking and Anchorage, 716
675.10 Backfilling, 716
675.11 Testing Installations, 716
675.12 Reconstructed Sanitary Sewer, 718
675.13 Manhole, 719
675.14 Abandoning Manholes, 719
675.15 Adjusting Manholes, 719
675.16 Capping Manholes, 719
675.17 Junction Boxes, 719
675.18 Method of Measurement, 719
675.19 Basis of Payment, 720
675.20 Pay Items, 720
SCOPE OF WORK, 20 104.1 -Intent of Contract, 20 104.2 -Alteration of Plans or Character of Work, 20 104.3 -Extra Work, 20 104.4 -Temporary Structures, 20 104.5 -Maintenance of Traffic, 20 104.6 –Rights in and Use of Materials Found on the Project, 21 104.7 -Final Clean Up, 21 104.8 -Bridge Plate, 22 104.9 -Differing Site Conditions, 22
104.10 Suspension of Work Ordered by the Engineer, 23
104.11 Significant Changes in the Character of Work, 24
104.12 Value Engineering Change Proposal and Practical
Design Change Proposal, 24 SEALI NG CRACKS IN CONCRETE PAVEMENT, 261 503.1 -Description, 261 503.2 -Materials, 261 503.3: Blank, 261 503.4 -Preparation of Material Before Use, 261 503.5 -Preparation of Cracks for Sealing, 261 503.6 -Equipment for Applying Sealer, 262 503.7 -Placement Requireme nts, 262 503.8 -Method of Measurement, 262 503.9 -Basis of Payment, 262
503.10 Pay Item, 262
SEEDING AND MULCHING, 575 652.1 -Description, 575 652.2 -Materials, 575 652.3 -Season of Work, 575 652.4 -Area Preparation for Seeding and Mulching, 575 652.5 -Sowing Seed, 576 652.6 -Applying Mulch and Fertilizer, 578 652.7 -Maintenance of Seeded and Mulched Areas, 579 652.8 -Second and Third Step Seeding, Fertilizing and Mulching, 579 652.9 -Method of Measurement, 579
652.10 Basis of Payment, 580
652.11 Pay I tems, 580
SEWER AND WATERLINE MATERIAL, 964 718.1 -Iron Pipe, 964 718.2 Through 718.4: Blank, 964 718.5 -Plastic Pipe (Pvc), 964 718.6: Blank, 964 718.7 -Plastic Pipe (Polyethylene), 964 718.9 -Copper Service Line, 964
718.10 Gate Valves, 964
718.11 Valve Bo xes, 964
718.12 Casing Pipe (Steel), 965
718.13 Fire Hydrants, 965
718.14 Meters, 965
718.15 Miscellaneous Steel (Clamps, Rods, Etc), 965
718.16 Through 718.19: Blank, 965
718.20 Fine Aggregate, 965
718.21 Bedding Material, 965
SHOP PAINTING METAL STRUCTURES, 757 687.1 -Description, 757 687.2 -General, 757 687.3 -Paint Application Requirements, 758 687.4 -Submittals, 761 SHOULDERS AND DITCHES, 148 229.1 -Description, 148 229.2 -Materials, 148 229.3 -Shoulders, 148 229.4 -Ditches, 148 229.5 -Method of Measure ment, 148 229.6 -Basis of Payment, 148 229.7 -Pay Item, 149 SIDEWALKS, 421 609.1 -Description, 421 609.2 -Materials, 421 609.3 -Subgrade Preparation, 423 609.4 -Dry Bed, 423 609.5 -Forms, 423 609.6 -Mixing and Placing Concrete, 423 609.7 -Expansion Joints, 423 609.8-Finishing, 424 609.9 -Method of Measurement, 424
609.10 Basis of Payment, 425
609.11 Pay Items, 425
981 SIGN LIGHTING, 619 659.1 -Description, 619 659.2 -Materials, 619 659.3 -General, 622 659.4 -Method of Measurement, 627 659.5 -Basis of Payment, 628 659.6 -Pay Item, 628 SINGLE / MULTIPLE COURSE MICRO SURFACING, 221 420.1 -Description, 221 420.2 -Materials, 221 420.3 -Mixture Requirements, 222 420.4 -Construction, 222 420.5 -Method of Measurement, 228 420.6 -Basis of Payment, 228 420.7 -Pay Items, 228 SLOPE AN D FOUNDATION PROTECTION, 139 218.1 -Description, 139 218.2 -Materials, 139 218.3 -Slope Protection, 139 218.4 -Foundation Protection, 141 218.5 -Method of Measurement, 142 218.6 -Basis of Payment, 142 218.7 -Pay Items, 143 SMOOTHNESS TESTING, 966 720.1 -Description, 966 720.2 -Equipment, 966 720.3 -Ride Quality Testing, 966 720.4 -Ride Quality Analysis, 967 720.5 -National Highway S ystem (N HS) Pavement Project, 968 720.6 -Non-National Highway System Pavement Projects, 969 720.7 - Projects That do not Fall Under Previous Characterizations, 969 SPECIAL ROCK FILL, 138 217.1 -Description, 138 217.2 -Materials, 138 217.3 -Construction Methods, 138 217.4 -Method of Measurement, 138 217.5 -Basis of Payment, 138 217.6 -Pay Item, 138 STEEL BEARING PILING, 458 616.1 -Descr iption, 458 616.2 -Materials, 458 616.3 -Preparation for Driving, 458 616.4 -Equipment for Driving, 458 616.5 -Method of Driving, 459 616.6 -Accuracy of Driving, 459 616.7 -Defective Piles, 459 616.8 -Determination of Bearing Values, 460 616.9 -Steel Piling, 460
616.10 Predrilled Piling, 460
616.11 Method of Measurement, 461
616.12 Basis of Payment, 461
616.13 Pay Items, 461
STEEL STRUCTURES, 436 615.1 -General, 436 615.2 -Working Drawings, 437 615.3 -Materials, 438 615.4 -Fabrication, 439 615.5 -Assembly, 447 615.6 -Erection, 453 615.7 -Measurement and Payment, 455 615.8 -Basis of Payment, 457 615.9 -Pay Items, 457 STONE AND CRUSHED AGGREGATE, 783 704.1 -Stone for Masonry, 783 704.2 -Stone for Riprap, 783 704.3 -Stone for Gabions, 783 704.4 -Dumped Rock Gutter, 783 704.5 -Special Rock Fill, 783 704.6 -Aggregate for Base or Subbase Course, 784 704.7 -Filter Material, 786 704.8 -Shot Rock, 786 STRUCTURAL CONCRETE, 305 601.1 -Description, 305 601.2 -Materials, 305 601.3 -Proportioning, 307 601.4 -Testing, 322 601.5 -Equipment and Tools, 324 601.6 -Handling, Measuring, and Batching of Materials, 326 601.7 -Mixing, 327 601.8 -Forms, 328 601.9 -Adverse Weather Conditions, 334
601.10 Placing Concrete, 335
601.11 Finishing Concrete Surfaces, 339
601.12 Curing And Protecting Concrete, 343
601.13 Protective Surface Treatment, 345
601.14 Method of Measurement, 350
601.15 Basis of Payment, 351
601.16 Pay Items, 352
STRUCTURE, ROCK, AND WET EXCAVATION, 132 212.1 -Description, 132 212.2 -Materials, 132 212.3 -General, 134 212.4 -Disposal of Material, 134 212.5 -Cofferdams, 134 212.6 -Pumping, 134 212.7 -Inspection, 134 212.8 -Preparation Of Foundations, 135 212.9 -Drainage, 135
212.10 Backfilling, 135
212.11 Method of Measurement, 136
212.12 Basis of Payment, 137
212.13 Pay Items, 137
SUBGRADE PREPARATION, 147 228.1 -Description, 147 228.2 -Materials, 147 228.3 -Construction Methods, 147 228.4 -Method of Measurement, 147 228.5 -Basis Of Payment, 147 228.6 -Pay Item, 147