Electrical (16000-16999)

408001 -* Non-Tracking Asphalt Material Gallon

WV · 2023 Standard SpecificationsBook pages 214214View official source ↗

198 SECTION 410 ASPHALT BASE AND WEARING COURSES, PERCENT WITH LIMITS (PWL)

410.1 -DESCRIPTION : 410.1.1 -General: The Contractor shall note that this Section is to be used for Square Yard Paving operations; however, the proposal and / or plans may contain 401 and 402 items to be paid and measured by the Ton (TN). In instances where those items occur, they shall be constructed and measured in accordance with the applicable sections of the West Virginia Division of Highways Standard Specifications Roads and Bridges, current edition, and the Supplemental Specifications current when the contract is let. Additionally, the following Materials Procedures (MP’s) for Square Yard Paving can be found on the Materials Control, Soils and Testing (MCS&T) Division website: https://transportation.wv.gov/highways/mcst/Pages/WVDOH -Materials -Procedures.aspx .

a.MP 401.02.31 QC & Acceptance
b.MP 401.07.20 Sampling Loose Asphalt Pavement Mixtures
c.MP 401.07.21 Sampling Compacted Asphalt
d.MP 401.07.22 Thickness of Asphalt Concrete Using Cores
e.MP 401.07.23 Bond Strength
f.MP 401.07.24 Pavement Macrotexture
g.MP 401.07.25 Evaluation of Asphalt Pavements
h.MP 401.13.50 Determination of PWL

410.1.2 -PWL Paving Description: This work shall consist of constructing one or more courses of asphalt, mixed mechanically in a plant, composed of aggregate and asphalt material designed in accordance with either the Marshall or Superpave Design System as specified in the contract documents, on a prepared foundation in accordance with these specifications and in reasonably close conformity with the lines, grades, weights or thicknesses, and cross sections shown on the Plans or established by the Engineer. The unit of measurement for asphalt will be by the ton, square yard, or cubic yard. The work will be accepted in accordance with these Specifications and the applicable requirements of Sections 105, 106, and 109.

Source: West Virginia Standard Specifications for Road and Bridge Construction, 2023 Edition. Pages 214214 of 1,006.