Pay Unit
Measure to the Nearest
Pay to the Nearest
Temporary Guardrail
EA [Ea]
EA [Ea]
EA [Ea]
Upgrade Box Beam Guardrail
FT [m]
0.1 ft [0.05 m]
FT [0.5 m]
606.5.2 Referenced Sections for Direct Payment
When specified, the engineer will measure and pay for Removal of Guardrail in accordance with Section 202, Removal; however, when reset is specified, removal is incidental to resetting.
528
Fences
607.1DESCRIPTION
1 This section describes the requirements for the construction of fence and gates and the
removal and resetting of gates.
607.2MATERIALS
1 Provide materials in accordance with the following:
Material
Subsection
Admixtures Aggregate for Concrete Barbed Wire Bolts, Nuts and Washers Fasteners - Plastic Fence Posts Fence Posts Fly Ash Industrial Fence Paint Plastic Fence Posts Portland Cement Structural Steel Twisted Barbless Wire Water Woven Wire
801.4 803 812.1 815.6 812.8.3.5 812.8 801.2 812.4 809 812.8.3 801.1 815.1 812.2 814.1 812.3
2 Provide 3 ft [1 m] of galvanized gate chain with ¼ inch [6 mm] diameter welded links.
607.3EQUIPMENT
1 Ensure that equipment meets the following:
Equipment
Subsection
Batch Plant Mixers Placing Equipment
513.3.1 513.3.2 513.3.3
529
Fences