6104 When stilling basins are specified or required by the engineer, use erosion control concrete

WY · 2021 Standard SpecificationsBook pages 00View official source ↗

in accordance with Subsection 614.4, Construction.

610.5MEASUREMENT and PAYMENT

610.5.1 General 1 The engineer will measure:

1.Metal Drain Pipe by the foot [meter] from end to end, in place. The pay length will

not exceed the length staked.

2.Metal Drain Inlet units by the each.

2 The department will pay as follows:

Pay Item

Pay Unit

Measure to the Nearest

Pay to the Nearest

Metal Drain Inlet

EA [Ea]

EA [Ea]

EA [Ea]

Metal Drain Pipe

FT [m]

0.1 ft [0.05 m]

FT [0.5 m]

610.5.2 Referenced Sections for Direct Payment 1 When specified, the engineer will measure and pay for Erosion Control Concrete in

accordance with Section 614, Erosion Control Concrete.

547

Highway Monuments

611.1DESCRIPTION

This section describes the requirements for furnishing and installing highway monuments.

611.2MATERIALS

1 Provide materials in accordance with the following:

Material

Subsection

Admixtures Aggregate for Concrete Curing Materials Fly Ash Joint Materials Portland Cement Reinforcing Steel Water

801.4 803 802.1 801.2 807 801.1 811.1 814.1

Provide highway monument posts of precast, reinforced concrete with installed preapproved tablets. 3 Use class B concrete in accordance with Subsection 513.4.4, Mix Design, but with the

substitution of type V portland cement. 4 Ensure right angles are fabricated with a ¾ inch [19 mm] chamfer.

611.3EQUIPMENT—Vacant

611.4CONSTRUCTION

611.4.1 General 1 Do not remove monuments until approved by the engineer. 2 Notify the engineer seven calendar days prior to commencing the installation of the

highway monuments. 3 Coordinate with the engineer so that they are present during the installation of highway

monuments.

548

Highway Monuments

Source: Wyoming Standard Specifications for Road and Bridge Construction, 2021 Edition. Pages 00 of 771.