B
HomeLibrariesCopilotSearchProjectsBookmarks
FeedbackHelp Desk
Libraries
Building Codes
Code LibraryIBC — BuildingIRC — ResidentialIFC — FireIPC — PlumbingIMC — MechanicalIFGC — Fuel GasIECC — EnergyNEC — ElectricalModel Codes
Specifications
CSI SpecificationsDOT SpecsTransit SpecsUSACE
Standards
TransportationRailroadFire SafetyAccessibilityStructural
Tools & References
DiagramsAssembliesProductsCalculatorsChecklistsPermits
PricingLog in
General

6312

WY · 2021 Standard SpecificationsBook pages 00View official source ↗

Fabricate the grate assembly from structural steel in accordance with Section 501, Structural Steel. The department does not require shop inspection or drawings. Galvanize the grate in accordance with Subsection 501.4.1.25, Galvanizing. 631.4.2 Installation

Do not install slotted drains in sidewalk curb ramps or pedestrian paths. Excavate in accordance with Subsection 206.4.1, Excavation.

2 Use watertight pipe coupling bands and end plugs. Use rubber gaskets with the coupling

bands to ensure water-tightness. Use a metal or concrete end plug that matches the pipe corrugations. 3 For end plugs and for concrete used as backfill around slotted drains, use class B

concrete in accordance with Subsection 513.4.4, Mix Design. The engineer may approve a local commercial mix. The department does not require a cement sample or aggregate gradation tests. 4 Use class B bedding material or concrete for the pipe bed.

Use concrete for the top portion of the trench immediately above the bedding, as specified. When constructing a concrete pipe bed, prevent floating of the pipe. 5 When placing curb or paving material over slotted drains, cover the opening to keep

out foreign material. Do not extend the slot above the paving material or gutter section. 631.4.3 Repair of Damaged Coating 1 Repair damage to spelter coatings in accordance with Subsection 501.4.2.9, Repair

of Galvanizing. Do not backfill the pipe before inspection and approval of repairs by the engineer.

631.5MEASUREMENT and PAYMENT

1 The engineer will measure Slotted Drain ___ in [mm] by the foot [meter] of pipe. 2 The department will pay as follows:

Pay Item Slotted Drain

in [mm]

Pay Unit

Measure to the Nearest

Pay to the Nearest

FT [m]

0.1 ft [0.05 m]

FT [0.5 m]

591

DIVISION 700

Traffic Control and Roadway Lighting

592

Electrical Devices

701.1DESCRIPTION

This section describes the requirements for providing and installing materials and equipment for traffic signals, roadway lighting, and other electrical systems and for modifying existing systems.

701.2MATERIALS and EQUIPMENT

1 Provide

new equipment and materials approved by the National Electrical Code

(NEC)and Underwriter’s Laboratories (UL) and in accordance with the following:

Materials

Subsection

Admixtures Aggregate for Concrete Anchor Bolts Fly Ash Galvanized Coating Gravel for Drains Grout Joint Materials Portland Cement Reinforcing Steel Water

801.4 803 815.6 801.2 815.14 803 819.1 807 801.1 811.1 814.1

2 Use nonmetallic additive with nonshrink grout.

Ensure that the concrete batch plant and mixers meet the requirements of Subsection 513.3, Equipment. Provide and use an air compressor that produces clean, oil-free compressed air. 701.2.1 Conduits

Provide rigid galvanized steel conduit in accordance with UL Publication UL-6, ANSI C80.1 or federal specification WW-C-581.

2 Provide schedule 40 and schedule 80 polyvinyl chloride (PVC) rigid nonmetallic conduit in

accordance with National Electrical Manufacturer’s Association (NEMA) Standard TC2. 3 Provide schedule 40 high-density polyethylene (HDPE) smooth-wall coilable electrical

plastic duct in accordance with NEMA Standard TC-2. Ensure the duct is marked at intervals no greater than 24 in [600 mm] to show the UL listing, vendor name, duct size, sequential footage [meter] marking, and duct striping.

593

Electrical Devices

Source: Wyoming Standard Specifications for Road and Bridge Construction, 2021 Edition. Pages 00 of 771.