Minnesota Department of Transportation (MnDOT) · 2025 Standard Specifications for Construction

Section 3897 — Sediment Control Log

Minnesota 2025 Standard Specifications for Construction, Section 3897. Full text, cross-references and related pay items on BuildSpec.

3897 SEDIMENT CONTROL LOG 3897.1 SCOPE Provide sediment control logs for slowing water velocities, filtering sediment, and diverting storm water runoff. 3897.2 REQUIREMENTS A Straw Provide straw logs meeting the following requirements and characteristics: (1) Type 3 mulch in accordance to 3882, “Mulch Material” (2) Encased in photodegradable synthetic or natural netting with a service life from 6 months to 9 months and with openings 1/2 inch by 1/2 inch (3) Diameter from 8 inches to 9 inches (4) Consisting of at least 80 percent of the fiber Material at least 3 inches long (5) Dry weight of 2…

The rest of Section 3897 — Sediment Control Log is for members

You're reading the opening of Section 3897 — Sediment Control Log. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Complete section text with subsections and tables
  • Search across every state DOT standard specification
  • Prior editions and related products
  • Ask Copilot about this section, with citations
Unlock Section 3897 — Sediment Control Log — free for 14 daysSign in