851OUTLET PROTECTION: ROCK

PA · 2026 Standard Specifications✓ Full text on BuildSpecBook pages 778–0 Save this section

Ask about Section 851

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

851.1DESCRIPTION—This work is construction of a rock outlet protection of the type indicated. This work

includes the maintenance and removal of temporary outlet protection as indicated.

851.2MATERIAL—

(a)Rock, Class as required. Section 850.2(a)
(b)Geotextiles, Class 4, Type A, for the type required. Section 735
(c)Grout. Section 601.2(c)

851.3CONSTRUCTION—As shown on Standard Drawings, as specified in Section 850.3, and as follows:

(a)Rock Basin. Control flow of surface water runoff as needed. Excavate below final grade as required,

install geotextile, and backfill with rock of the class indicated. If required, after rock is in place, saturate the rock with water, then completely fill the voids between pieces with grout, for at least the top 6 inches, and sweep the surface with a stiff broom. Do not place grout if the air temperature is below freezing. In hot, dry weather, protect grouted rock from excessive heat and keep moist for at least 3 days after grouting, using saturated burlap.

(b)Rock Energy Dissipator. Control flow of surface water runoff as needed. Excavate below final grade as

required, install geotextile, and backfill with rock of the class indicated. Make appropriate connection to downstream receiving watercourse as indicated. If required, after rock is in place, saturate the rock with water, then completely fill the voids between pieces with grout, for at least the top 6 inches, and sweep the surface with a stiff broom. Do not plac e grout if the air temperature is below freezing. In hot, dry weather, protect grouted rock from excessive heat and keep moist for at least 3 days after grouting, using saturated burlap.

(c)Rock Apron. Control flow of surface water runoff as needed. Excavate below final grade as required,

install geotextile, and backfill with rock of the class indicated. If required, make appropriate connection to downstream receiving watercourse as indicated.

(d)Riprap Basin. Control flow of surface water runoff as needed. Excavate below final grade as required,

install geotextile, and backfill with rock of the class indicated. Make appropriate connection to downstream receiving watercourse as indicated.

(e)Temporary Installations. Remove rock and geotextile from temporary outlet protection as indicated.

Stockpile rock used in temporary installations on site if necessary before permanent installations. Reuse rock for permanent outlet protection as indicated.

(f)Maintenance. Maintain outlet protection until the project has been completed. Remove excessive

sediment and repair or replace washed out areas to restore outlet protection functionality.

851.4MEASUREMENT AND PAYMENT—

(a)Rock Basin. Each
(b)Rock Energy Dissipator. Each
(c)Rock Apron. Square Yard
(d)Riprap Basin. Square Yard
(e)Temporary Installations. Each

Get an email when 851 changes

Pennsylvania revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Publication 408 Highway Construction Specifications, 2026 Edition. Pages 778–0 of 1,522. View official source ↗

Ask about this section

Scoped to Pennsylvania Publication 408 — Specifications, Section 851 — OUTLET PROTECTION: ROCK. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.